30 Macombs Place
Manhattan, NY 10039BBL 1-02036-0057Map
Owner of record: 30 Macombs Pl Hsng Et
30 Macombs Place is a walk-up apartment building built in 1920 in Manhattan, 10039. It has 24 residential units across 6 floors. The owner of record is 30 Macombs Pl Hsng Et. HPD has recorded 262 housing violations here, most recently on April 29, 2026. 47 of the 50 most recent violations are still open.
- HPD violations
- 262
- DOB violations
- 13
- ECB violations
- 21
- HPD complaints
- 336
Available now in this building
For sale2-bedroom apartment for sale in central harlem
New York, NY
For sale2-bedroom apartment for sale in central harlem
New York, NY
For sale2-bedroom apartment for sale in central harlem
New York, NY
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 262
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Open — Nov sent out - CImmediately hazardous
Immediately provide a fire guard as directed by the nyc dept. of housing preservation & development (hpd) and/or the nyc dept. of buildings (dob) to protect against fire hazards observed by hpd and/or dob. fire hazards observed by hpd have resulted in the following additional hpd violation(s): violation #18768279, 18768307, 18768300, 18768303, 18768287, 18768281, 18768297, and 18768293 in order to protect public safety against imminent fire hazards observed, a fire guard must be provided forthwith for continuous 24 hour coverage, notwithstanding the correction and certification dates set forth above (the correction and certification dates set forth above are applicable for purposes of civil penalties that may be assessed pursuant to nyc administrative code § 27-2115, but do not reflect the date by which a fire guard must be provided). a fire guard must be provided immediately due to the exigency of the dangerous fire hazard conditions observed. the violation requiring a fire guard to be provided will remain open until such time as the fire hazards resulting in the hpd violation(s) referenced above and/or the fire hazards resulting in related dob violation(s) have been dismissed.
Apr 7, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 1c, 1st story, 2nd apartment from north at east
Apr 7, 2026 · Apt 1C
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at north wall in the 1st room from east located at apt 1c, 1st story, 2nd apartment from north at east
Apr 7, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1c, 1st story, 2nd apartment from north at east
Apr 7, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1c, 1st story, 2nd apartment from north at east
Apr 7, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 1c, 1st story, 2nd apartment from north at east
Apr 7, 2026 · Apt 1C
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at north wall in the private hallway located at apt 1c, 1st story, 2nd apartment from north at east
Apr 7, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electric wiring at ceiling in the private hallway located at apt 1c, 1st story, 2nd apartment from north at east
Apr 7, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 1c, 1st story, 2nd apartment from north at east
Apr 7, 2026 · Apt 1C
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling in the private hallway located at apt 1c, 1st story, 2nd apartment from north at east
Apr 7, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 1c, 1st story, 2nd apartment from north at east
Apr 7, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the bathroom located at apt 1c, 1st story, 2nd apartment from north at east
Apr 7, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electric wiring at ceiling in the 1st room from east located at apt 1c, 1st story, 2nd apartment from north at east
Apr 7, 2026 · Apt 1C
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and all walls in the bathroom located at apt 1c, 1st story, 2nd apartment from north at east
Apr 7, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the bathroom located at apt 1c, 1st story, 2nd apartment from north at east
Apr 7, 2026 · Apt 1C
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling in the 5th room from east located at apt 1c, 1st story, 2nd apartment from north at east
Apr 7, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall and west wall in the 5th room from east located at apt 1c, 1st story, 2nd apartment from north at east
Apr 7, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 5th room from east located at apt 1c, 1st story, 2nd apartment from north at east
Apr 7, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electric wiring a ceiling in the 5th room from east located at apt 1c, 1st story, 2nd apartment from north at east
Apr 7, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective intercom system from building entrance to panel at south wall in the private hallway located at apt 1c, 1st story, 2nd apartment from north at east
Apr 7, 2026 · Apt 1C
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1c, 1st story, 2nd apartment from north at east
Apr 7, 2026 · Apt 1C
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling in the kitchen located at apt 1c, 1st story, 2nd apartment from north at east
Apr 7, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchen located at apt 1c, 1st story, 2nd apartment from north at east
Apr 7, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 1c, 1st story, 2nd apartment from north at east
Apr 7, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electric wiring at ceiling in the kitchen located at apt 1c, 1st story, 2nd apartment from north at east
Apr 7, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 1c, 1st story, 2nd apartment from north at east
Apr 7, 2026 · Apt 1C
Open — Nov sent out - CImmediately hazardous
Replace the broken or defective cracked water closet in the bathroom located at apt 1c, 1st story, 2nd apartment from north at east
Apr 7, 2026 · Apt 1C
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling in the 2nd room from east located at apt 1c, 1st story, 2nd apartment from north at east
Apr 7, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from east located at apt 1c, 1st story, 2nd apartment from north at east
Apr 7, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 2nd room from east located at apt 1c, 1st story, 2nd apartment from north at east
Apr 7, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electric wiring at ceiling in the 2nd room from east located at apt 1c, 1st story, 2nd apartment from north at east
Apr 7, 2026 · Apt 1C
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at north wall in the 2nd room from east located at apt 1c, 1st story, 2nd apartment from north at east
Apr 7, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east located at apt 1c, 1st story, 2nd apartment from north at east
Apr 7, 2026 · Apt 1C
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective uncapped steam pipe at south in the 2nd room from east located at apt 1c, 1st story, 2nd apartment from north at east
Apr 7, 2026 · Apt 1C
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling in the 1st room from east located at apt 1c, 1st story, 2nd apartment from north at east
Apr 7, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall and south wall in the 1st room from east located at apt 1c, 1st story, 2nd apartment from north at east
Apr 7, 2026 · Apt 1C
Open — Nov sent out - CImmediately hazardous
Make safe by properly repairing the structural defect rotten and corroded beams and joists in the bathroom located at apt 1c, 1st story, 2nd apartment from north at east
Apr 7, 2026 · Apt 1C
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of free standing radiator in the 1st room from east located at apt 1c, 1st story, 2nd apartment from north at east
Apr 7, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective mortise lock at door in the entrance located at apt 21, 2nd story, 1st apartment from south at west
Apr 5, 2026 · Apt 21
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt b, 1st story, 1st apartment from north at east
Nov 18, 2025 · Apt B
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt b, 1st story, 1st apartment from north at east
Nov 18, 2025 · Apt B
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latchset at fire door leading to south yard at public hall, 1st story
Nov 18, 2025
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Nov 18, 2025
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 64, 5th story, 2nd apartment from north at east
Nov 18, 2025 · Apt 64
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 64, 5th story, 2nd apartment from north at east
Nov 18, 2025 · Apt 64
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 34, 3rd story, 2nd apartment from north at east
Nov 8, 2025 · Apt 34
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 21, 2nd story, 1st apartment from south at west
Nov 8, 2025 · Apt 21
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 21, 2nd story, 1st apartment from south at west
Nov 8, 2025 · Apt 21
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Nov 8, 2025
Open — Nov sent out
DOB building violations · 13
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 3, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 6, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 6, 2021
Dob violation - dismissed - Construction other optional
C-construction other optional
Oct 28, 2020
Dob violation - active - Construction other optional
At time of inspection observed approximately 4 ceiling fllor joist above the bathroom in a state of disrepair. rotted & detriorating with adjoining wall building approximately 6" out
Oct 7, 2020
Dob violation - active
Show 3 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active
ECB violations · 21
- Class - 1
Failure to comply with the commissioner's order to file a certificate of correction with dob for ecb violation # 35496762x issued on 10/07/2020. first hearing date was scheduled for 12/24/2020 and no compliance
Jan 30, 2026 · Penalty $25,000
Active - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#35496762x issued on 10/7/20 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.failure to maintain build
Mar 3, 2022 · Penalty $5,000
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35496762x issued on 10/07/20 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg in code compliant manner.
Dec 21, 2021 · Penalty $3,125
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#35496762x issued on 10/7/20 and to file a certificate of correction pursuant to 28-201.1 and 1 rcny 102-01.failure to maintain buil
Jul 6, 2021 · Penalty $3,125
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#35496762x issued on 10/07/2020 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.failure to maintain bu
Feb 5, 2021 · Penalty $5,000
Resolve - Class - 1
Failure to comply with the commissioner's order contained in summons/violation#35496761y issued in 10/7/2020 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.work does not conform t
Feb 5, 2021 · Penalty $2,500
Resolve - Class - 2
Failure to comply w/commissioner's order contained in summons/v#39013867z issued12/4/19&to file cert of correction pursuant to 28.201.1&1rcny102-01d2.acceptible cert hasn't yet been filed despite respondent ent
Feb 3, 2021 · Penalty $3,125
Resolve - Class - 2
Failure to comply w/commissioner's order contained in summons/v#39013868k issued12/4/19&to file cert of correction pursuant to28.201.1&1rcny102-01d2.acceptible cert hasn't yet been filed despite respondent ente
Feb 3, 2021 · Penalty $3,125
Resolve - Class - 2
Failure to comply w/commissioner's order contained in summons/v#39013869m issued12/4/19&to file cert of correction pursuant to28.201.1&1rcny102-01d2.acceptible cert hasn't yet been filed despite repsondent ente
Feb 3, 2021 · Penalty $3,125
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35496761y issued on 10/07/20 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. work does not conform to approved construction docu
Dec 11, 2020 · Penalty $1,250
Resolve
Show 11 more ↓
- Class - 2
Failure to comply w/the comm's order contained in summons/vio#35496762x issued on 10/07/20 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg in code compliant manner.
Dec 11, 2020 · Penalty $1,250
Resolve - Class - 1
28-201.1 inadequate tenant protection plan note:at time of inspection work had been performed under teh aforementioned job number.the submitted ttp lacks specific means & methods of protecting tenants on health
Oct 20, 2020 · Penalty $1,250
Resolve - Class - 1
Work does not conform to approved construction documents and/or approved amendments:job#123831149 does not nidicate remove of bathroom wallsat time of inspection 2 partition for the bathroom removed.stop all wo
Oct 7, 2020 · Penalty $2,500
Resolve - Class - 1
Failure to maintain building in code compliant manner.at time of inspection observed approx. 4 celing 1 floor joist with water damage rotteddeterioting/state of disrepair above the 1st floor 1c bathroom in nood
Oct 7, 2020 · Penalty $6,250
Active - Class - 2
Work without a permit. noted: in apt # 53 demo and construction work. non fire rated wall finishes removed from kitchen and bathroom walls, floor in bathroom removed down to beams, installation of drop ceiling
Dec 4, 2019 · Penalty $1,250
Resolve - Class - 2
Work without a permit. noted: in apt # 53 electrical work, 6 new receptacles and new wireing to feed them installet in kitchen, bathroom and hall ceiling. 100% work completed., obtain all permits
Dec 4, 2019 · Penalty $1,250
Resolve - Class - 2
Work without a permit. noted: in apt # 53 plumbing work. new cold and hot water supply, new shower body, new drain in floor installed in bathroom.use of prohibited pvc pipe for drain. 100% work completed., obta
Dec 4, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to maintain building in code compliant matted/ no fire stopping. noted in apt # 53 approximately 25 square feet of fire stopping matterial removed affecting apt # 63 on above floor., provide/maintain fi
Dec 4, 2019
Resolve - Class - 2
Sec. 27-2009.261 failure to distribute or post a notice at safe construction bill at rights in accordance w/the housing maintance code sec. 27-2009.261. noted: work occuring under permit#123519399 & permit#
Aug 28, 2018
Resolve - Class - 2
Failure to provide approved/accepted construction documents at job site at time of inspection. noted: work on roof under job#123559684 however no approved plans present at job site at time of inspection.
Aug 28, 2018
Resolve - Class - 2
Failure to maintain building wall or appurtenances. noted: observed attime of inspection at the roof of the building at the exp#4 the portion of the parapet wall became bulged inward (leande) and also chain lin
Feb 13, 2018 · Penalty $500
Active
Complaints
- Heat/hot water
Entire building
Oct 20, 2026 · Apt BLDG
Close - Plumbing
Water supply
Oct 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 18, 2026 · Apt BLDG
Close - Water leak
Damp spot
Sep 28, 2026 · Apt 23
Open - Safety
Carbon monoxide detector
Sep 28, 2026 · Apt 23
Open - Safety
Smoke detector
Sep 28, 2026 · Apt 23
Open - Heat/hot water
Entire building
Sep 27, 2026 · Apt 23
Close - Unsanitary condition
Pests
Jun 20, 2026 · Apt 41
Close - Plumbing
Water supply
May 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 7, 2026 · Apt BLDG
Close
Show 40 more ↓
- Plumbing
Water supply
Apr 28, 2026 · Apt 21
Close - Heat/hot water
Entire building
Apr 28, 2026 · Apt 21
Close - Plumbing
Water supply
Apr 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 22, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 5, 2026 · Apt BLDG
Close - Water leak
Damp spot
Apr 3, 2026 · Apt 1C
Close - Unsanitary condition
Mold
Apr 3, 2026 · Apt 1C
Close - Paint/plaster
Wall
Apr 3, 2026 · Apt 1C
Close - General
Bell/buzzer/intercom
Apr 3, 2026 · Apt 1C
Close - Paint/plaster
Ceiling
Apr 3, 2026 · Apt 1C
Close - Heat/hot water
Entire building
Mar 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Flooring/stairs
Floor
Jan 5, 2026 · Apt 1C
Close - Heat/hot water
Entire building
Dec 2, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 1, 2025 · Apt 43
Close - Heat/hot water
Entire building
Dec 1, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 30, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 30, 2025 · Apt BLDG
Close - Flooring/stairs
Floor
Nov 20, 2025 · Apt 1C
Close - Heat/hot water
Entire building
Nov 18, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 18, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 18, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 17, 2025 · Apt 64
Close - Heat/hot water
Entire building
Nov 10, 2025 · Apt 31
Close - Heat/hot water
Entire building
Nov 7, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 6, 2025 · Apt 21
Close - Flooring/stairs
Floor
Nov 6, 2025 · Apt 1C
Close - Flooring/stairs
Floor
Oct 7, 2025 · Apt 21
Close - General
Cabinet
Oct 7, 2025 · Apt 21
Close - Unsanitary condition
Mold
Oct 7, 2025 · Apt 21
Close - Unsanitary condition
Sewage
Sep 22, 2025 · Apt 21
Close - Flooring/stairs
Floor
Sep 15, 2025 · Apt 1C
Close - Water leak
Heavy flow
Sep 8, 2025 · Apt 21
Close - Heat/hot water
Entire building
Jun 13, 2025 · Apt 22
Close - Plumbing
Water supply
May 19, 2025 · Apt 22
Close - Heat/hot water
Entire building
May 18, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Apr 22, 2025 · Apt 21
Close - Heat/hot water
Apartment only
Apr 18, 2025 · Apt 21
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Aug 21, 2026 | $200,000 | Coops - walkup apartments | — |
| Jul 7, 2026 | $240,000 | Coops - walkup apartments | — |
| Jan 12, 2026 | $225,000 | Coops - walkup apartments | — |
Building details
- Building type
- Walk-up apartment building (C6)
- Year built
- 1920
- Floors
- 6
- Residential units
- 24
- Building area
- 12,390 ft²
- Lot area
- 4,694 ft²
- Zoning
- R7-2
- Community board
- 110
- Council district
- 9
- Block / lot
- 2036 / 57
- Assessed value
- $533,700
- Landmark / historic district
- No
HPD registration #111799, last renewed Jun 3, 2025.
Questions about 30 Macombs Place
Who owns 30 Macombs Place?
The owner of record in NYC Department of City Planning PLUTO data is 30 Macombs Pl Hsng Et.
Does 30 Macombs Place have violations?
Yes. NYC HPD has recorded 262 housing violations at this property.
Is 30 Macombs Place rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 30 Macombs Place built?
City records list 1920 as the year it was built.
How many apartments are in 30 Macombs Place?
It has 24 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.