30 Macombs Place is a walk-up apartment building built in 1920 in Manhattan, 10039. It has 24 residential units across 6 floors. The owner of record is 30 Macombs Pl Hsng Et. HPD has recorded 262 housing violations here, most recently on April 29, 2026. 47 of the 50 most recent violations are still open.

HPD violations
262
DOB violations
13
ECB violations
21
HPD complaints
336

Available now in this building

What to know

Concern
21 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Apr 29, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 262

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 29, 2026

    Open — Nov sent out
  • C

    Immediately provide a fire guard as directed by the nyc dept. of housing preservation & development (hpd) and/or the nyc dept. of buildings (dob) to protect against fire hazards observed by hpd and/or dob. fire hazards observed by hpd have resulted in the following additional hpd violation(s): violation #18768279, 18768307, 18768300, 18768303, 18768287, 18768281, 18768297, and 18768293 in order to protect public safety against imminent fire hazards observed, a fire guard must be provided forthwith for continuous 24 hour coverage, notwithstanding the correction and certification dates set forth above (the correction and certification dates set forth above are applicable for purposes of civil penalties that may be assessed pursuant to nyc administrative code § 27-2115, but do not reflect the date by which a fire guard must be provided). a fire guard must be provided immediately due to the exigency of the dangerous fire hazard conditions observed. the violation requiring a fire guard to be provided will remain open until such time as the fire hazards resulting in the hpd violation(s) referenced above and/or the fire hazards resulting in related dob violation(s) have been dismissed.

    Apr 7, 2026

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 1c, 1st story, 2nd apartment from north at east

    Apr 7, 2026 · Apt 1C

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective fire retardant material at north wall in the 1st room from east located at apt 1c, 1st story, 2nd apartment from north at east

    Apr 7, 2026 · Apt 1C

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1c, 1st story, 2nd apartment from north at east

    Apr 7, 2026 · Apt 1C

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1c, 1st story, 2nd apartment from north at east

    Apr 7, 2026 · Apt 1C

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 1c, 1st story, 2nd apartment from north at east

    Apr 7, 2026 · Apt 1C

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective fire retardant material at north wall in the private hallway located at apt 1c, 1st story, 2nd apartment from north at east

    Apr 7, 2026 · Apt 1C

    Open — Nov sent out
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electric wiring at ceiling in the private hallway located at apt 1c, 1st story, 2nd apartment from north at east

    Apr 7, 2026 · Apt 1C

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 1c, 1st story, 2nd apartment from north at east

    Apr 7, 2026 · Apt 1C

    Open — Nov sent out
Show 40 more ↓
  • C

    Properly repair with similar material the broken or defective fire retardant material at ceiling in the private hallway located at apt 1c, 1st story, 2nd apartment from north at east

    Apr 7, 2026 · Apt 1C

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 1c, 1st story, 2nd apartment from north at east

    Apr 7, 2026 · Apt 1C

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak ceiling in the bathroom located at apt 1c, 1st story, 2nd apartment from north at east

    Apr 7, 2026 · Apt 1C

    Open — Nov sent out
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electric wiring at ceiling in the 1st room from east located at apt 1c, 1st story, 2nd apartment from north at east

    Apr 7, 2026 · Apt 1C

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective fire retardant material at ceiling and all walls in the bathroom located at apt 1c, 1st story, 2nd apartment from north at east

    Apr 7, 2026 · Apt 1C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the bathroom located at apt 1c, 1st story, 2nd apartment from north at east

    Apr 7, 2026 · Apt 1C

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective fire retardant material at ceiling in the 5th room from east located at apt 1c, 1st story, 2nd apartment from north at east

    Apr 7, 2026 · Apt 1C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall and west wall in the 5th room from east located at apt 1c, 1st story, 2nd apartment from north at east

    Apr 7, 2026 · Apt 1C

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 5th room from east located at apt 1c, 1st story, 2nd apartment from north at east

    Apr 7, 2026 · Apt 1C

    Open — Nov sent out
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electric wiring a ceiling in the 5th room from east located at apt 1c, 1st story, 2nd apartment from north at east

    Apr 7, 2026 · Apt 1C

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective intercom system from building entrance to panel at south wall in the private hallway located at apt 1c, 1st story, 2nd apartment from north at east

    Apr 7, 2026 · Apt 1C

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1c, 1st story, 2nd apartment from north at east

    Apr 7, 2026 · Apt 1C

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective fire retardant material at ceiling in the kitchen located at apt 1c, 1st story, 2nd apartment from north at east

    Apr 7, 2026 · Apt 1C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchen located at apt 1c, 1st story, 2nd apartment from north at east

    Apr 7, 2026 · Apt 1C

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 1c, 1st story, 2nd apartment from north at east

    Apr 7, 2026 · Apt 1C

    Open — Nov sent out
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electric wiring at ceiling in the kitchen located at apt 1c, 1st story, 2nd apartment from north at east

    Apr 7, 2026 · Apt 1C

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 1c, 1st story, 2nd apartment from north at east

    Apr 7, 2026 · Apt 1C

    Open — Nov sent out
  • C

    Replace the broken or defective cracked water closet in the bathroom located at apt 1c, 1st story, 2nd apartment from north at east

    Apr 7, 2026 · Apt 1C

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective fire retardant material at ceiling in the 2nd room from east located at apt 1c, 1st story, 2nd apartment from north at east

    Apr 7, 2026 · Apt 1C

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 2nd room from east located at apt 1c, 1st story, 2nd apartment from north at east

    Apr 7, 2026 · Apt 1C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 2nd room from east located at apt 1c, 1st story, 2nd apartment from north at east

    Apr 7, 2026 · Apt 1C

    Open — Nov sent out
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electric wiring at ceiling in the 2nd room from east located at apt 1c, 1st story, 2nd apartment from north at east

    Apr 7, 2026 · Apt 1C

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective fire retardant material at north wall in the 2nd room from east located at apt 1c, 1st story, 2nd apartment from north at east

    Apr 7, 2026 · Apt 1C

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east located at apt 1c, 1st story, 2nd apartment from north at east

    Apr 7, 2026 · Apt 1C

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective uncapped steam pipe at south in the 2nd room from east located at apt 1c, 1st story, 2nd apartment from north at east

    Apr 7, 2026 · Apt 1C

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective fire retardant material at ceiling in the 1st room from east located at apt 1c, 1st story, 2nd apartment from north at east

    Apr 7, 2026 · Apt 1C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at east wall and south wall in the 1st room from east located at apt 1c, 1st story, 2nd apartment from north at east

    Apr 7, 2026 · Apt 1C

    Open — Nov sent out
  • C

    Make safe by properly repairing the structural defect rotten and corroded beams and joists in the bathroom located at apt 1c, 1st story, 2nd apartment from north at east

    Apr 7, 2026 · Apt 1C

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of free standing radiator in the 1st room from east located at apt 1c, 1st story, 2nd apartment from north at east

    Apr 7, 2026 · Apt 1C

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective mortise lock at door in the entrance located at apt 21, 2nd story, 1st apartment from south at west

    Apr 5, 2026 · Apt 21

    Open — Nov sent out
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt b, 1st story, 1st apartment from north at east

    Nov 18, 2025 · Apt B

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt b, 1st story, 1st apartment from north at east

    Nov 18, 2025 · Apt B

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective latchset at fire door leading to south yard at public hall, 1st story

    Nov 18, 2025

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at basement at boiler room

    Nov 18, 2025

    Open — Nov sent out
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 64, 5th story, 2nd apartment from north at east

    Nov 18, 2025 · Apt 64

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 64, 5th story, 2nd apartment from north at east

    Nov 18, 2025 · Apt 64

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 34, 3rd story, 2nd apartment from north at east

    Nov 8, 2025 · Apt 34

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 21, 2nd story, 1st apartment from south at west

    Nov 8, 2025 · Apt 21

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 21, 2nd story, 1st apartment from south at west

    Nov 8, 2025 · Apt 21

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system door locked at cellar at boiler room

    Nov 8, 2025

    Open — Nov sent out

DOB building violations · 13

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 3, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 6, 2021

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 6, 2021

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Oct 28, 2020

    Dob violation - active
  • Construction other optional

    At time of inspection observed approximately 4 ceiling fllor joist above the bathroom in a state of disrepair. rotted & detriorating with adjoining wall building approximately 6" out

    Oct 7, 2020

    Dob violation - active
Show 3 more ↓
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - active

ECB violations · 21

  • Class - 1

    Failure to comply with the commissioner's order to file a certificate of correction with dob for ecb violation # 35496762x issued on 10/07/2020. first hearing date was scheduled for 12/24/2020 and no compliance

    Jan 30, 2026 · Penalty $25,000

    Active
  • Class - 2

    Failure to comply with the commissioner's order contained in summons/violation#35496762x issued on 10/7/20 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.failure to maintain build

    Mar 3, 2022 · Penalty $5,000

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35496762x issued on 10/07/20 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg in code compliant manner.

    Dec 21, 2021 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to comply with the commissioner's order contained in summons/violation#35496762x issued on 10/7/20 and to file a certificate of correction pursuant to 28-201.1 and 1 rcny 102-01.failure to maintain buil

    Jul 6, 2021 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to comply with the commissioner's order contained in summons/violation#35496762x issued on 10/07/2020 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.failure to maintain bu

    Feb 5, 2021 · Penalty $5,000

    Resolve
  • Class - 1

    Failure to comply with the commissioner's order contained in summons/violation#35496761y issued in 10/7/2020 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.work does not conform t

    Feb 5, 2021 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to comply w/commissioner's order contained in summons/v#39013867z issued12/4/19&to file cert of correction pursuant to 28.201.1&1rcny102-01d2.acceptible cert hasn't yet been filed despite respondent ent

    Feb 3, 2021 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to comply w/commissioner's order contained in summons/v#39013868k issued12/4/19&to file cert of correction pursuant to28.201.1&1rcny102-01d2.acceptible cert hasn't yet been filed despite respondent ente

    Feb 3, 2021 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to comply w/commissioner's order contained in summons/v#39013869m issued12/4/19&to file cert of correction pursuant to28.201.1&1rcny102-01d2.acceptible cert hasn't yet been filed despite repsondent ente

    Feb 3, 2021 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35496761y issued on 10/07/20 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. work does not conform to approved construction docu

    Dec 11, 2020 · Penalty $1,250

    Resolve
Show 11 more ↓
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35496762x issued on 10/07/20 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg in code compliant manner.

    Dec 11, 2020 · Penalty $1,250

    Resolve
  • Class - 1

    28-201.1 inadequate tenant protection plan note:at time of inspection work had been performed under teh aforementioned job number.the submitted ttp lacks specific means & methods of protecting tenants on health

    Oct 20, 2020 · Penalty $1,250

    Resolve
  • Class - 1

    Work does not conform to approved construction documents and/or approved amendments:job#123831149 does not nidicate remove of bathroom wallsat time of inspection 2 partition for the bathroom removed.stop all wo

    Oct 7, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to maintain building in code compliant manner.at time of inspection observed approx. 4 celing 1 floor joist with water damage rotteddeterioting/state of disrepair above the 1st floor 1c bathroom in nood

    Oct 7, 2020 · Penalty $6,250

    Active
  • Class - 2

    Work without a permit. noted: in apt # 53 demo and construction work. non fire rated wall finishes removed from kitchen and bathroom walls, floor in bathroom removed down to beams, installation of drop ceiling

    Dec 4, 2019 · Penalty $1,250

    Resolve
  • Class - 2

    Work without a permit. noted: in apt # 53 electrical work, 6 new receptacles and new wireing to feed them installet in kitchen, bathroom and hall ceiling. 100% work completed., obtain all permits

    Dec 4, 2019 · Penalty $1,250

    Resolve
  • Class - 2

    Work without a permit. noted: in apt # 53 plumbing work. new cold and hot water supply, new shower body, new drain in floor installed in bathroom.use of prohibited pvc pipe for drain. 100% work completed., obta

    Dec 4, 2019 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to maintain building in code compliant matted/ no fire stopping. noted in apt # 53 approximately 25 square feet of fire stopping matterial removed affecting apt # 63 on above floor., provide/maintain fi

    Dec 4, 2019

    Resolve
  • Class - 2

    Sec. 27-2009.261 failure to distribute or post a notice at safe construction bill at rights in accordance w/the housing maintance code sec. 27-2009.261. noted: work occuring under permit#123519399 & permit#

    Aug 28, 2018

    Resolve
  • Class - 2

    Failure to provide approved/accepted construction documents at job site at time of inspection. noted: work on roof under job#123559684 however no approved plans present at job site at time of inspection.

    Aug 28, 2018

    Resolve
  • Class - 2

    Failure to maintain building wall or appurtenances. noted: observed attime of inspection at the roof of the building at the exp#4 the portion of the parapet wall became bulged inward (leande) and also chain lin

    Feb 13, 2018 · Penalty $500

    Active

Complaints

  • Heat/hot water

    Entire building

    Oct 20, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Oct 19, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 18, 2026 · Apt BLDG

    Close
  • Water leak

    Damp spot

    Sep 28, 2026 · Apt 23

    Open
  • Safety

    Carbon monoxide detector

    Sep 28, 2026 · Apt 23

    Open
  • Safety

    Smoke detector

    Sep 28, 2026 · Apt 23

    Open
  • Heat/hot water

    Entire building

    Sep 27, 2026 · Apt 23

    Close
  • Unsanitary condition

    Pests

    Jun 20, 2026 · Apt 41

    Close
  • Plumbing

    Water supply

    May 7, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    May 7, 2026 · Apt BLDG

    Close
Show 40 more ↓
  • Plumbing

    Water supply

    Apr 28, 2026 · Apt 21

    Close
  • Heat/hot water

    Entire building

    Apr 28, 2026 · Apt 21

    Close
  • Plumbing

    Water supply

    Apr 27, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 22, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 20, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 5, 2026 · Apt BLDG

    Close
  • Water leak

    Damp spot

    Apr 3, 2026 · Apt 1C

    Close
  • Unsanitary condition

    Mold

    Apr 3, 2026 · Apt 1C

    Close
  • Paint/plaster

    Wall

    Apr 3, 2026 · Apt 1C

    Close
  • General

    Bell/buzzer/intercom

    Apr 3, 2026 · Apt 1C

    Close
  • Paint/plaster

    Ceiling

    Apr 3, 2026 · Apt 1C

    Close
  • Heat/hot water

    Entire building

    Mar 25, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 24, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 8, 2026 · Apt BLDG

    Close
  • Flooring/stairs

    Floor

    Jan 5, 2026 · Apt 1C

    Close
  • Heat/hot water

    Entire building

    Dec 2, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 1, 2025 · Apt 43

    Close
  • Heat/hot water

    Entire building

    Dec 1, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 30, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 30, 2025 · Apt BLDG

    Close
  • Flooring/stairs

    Floor

    Nov 20, 2025 · Apt 1C

    Close
  • Heat/hot water

    Entire building

    Nov 18, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 18, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 18, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 17, 2025 · Apt 64

    Close
  • Heat/hot water

    Entire building

    Nov 10, 2025 · Apt 31

    Close
  • Heat/hot water

    Entire building

    Nov 7, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 6, 2025 · Apt 21

    Close
  • Flooring/stairs

    Floor

    Nov 6, 2025 · Apt 1C

    Close
  • Flooring/stairs

    Floor

    Oct 7, 2025 · Apt 21

    Close
  • General

    Cabinet

    Oct 7, 2025 · Apt 21

    Close
  • Unsanitary condition

    Mold

    Oct 7, 2025 · Apt 21

    Close
  • Unsanitary condition

    Sewage

    Sep 22, 2025 · Apt 21

    Close
  • Flooring/stairs

    Floor

    Sep 15, 2025 · Apt 1C

    Close
  • Water leak

    Heavy flow

    Sep 8, 2025 · Apt 21

    Close
  • Heat/hot water

    Entire building

    Jun 13, 2025 · Apt 22

    Close
  • Plumbing

    Water supply

    May 19, 2025 · Apt 22

    Close
  • Heat/hot water

    Entire building

    May 18, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Apr 22, 2025 · Apt 21

    Close
  • Heat/hot water

    Apartment only

    Apr 18, 2025 · Apt 21

    Close

Sales history

DatePriceTypeUnits
Aug 21, 2026$200,000Coops - walkup apartments—
Jul 7, 2026$240,000Coops - walkup apartments—
Jan 12, 2026$225,000Coops - walkup apartments—

Building details

Building type
Walk-up apartment building (C6)
Year built
1920
Floors
6
Residential units
24
Building area
12,390 ft²
Lot area
4,694 ft²
Zoning
R7-2
Community board
110
Council district
9
Block / lot
2036 / 57
Assessed value
$533,700
Landmark / historic district
No

HPD registration #111799, last renewed Jun 3, 2025.

Questions about 30 Macombs Place

Who owns 30 Macombs Place?

The owner of record in NYC Department of City Planning PLUTO data is 30 Macombs Pl Hsng Et.

Does 30 Macombs Place have violations?

Yes. NYC HPD has recorded 262 housing violations at this property.

Is 30 Macombs Place rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 30 Macombs Place built?

City records list 1920 as the year it was built.

How many apartments are in 30 Macombs Place?

It has 24 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.