roofy

Violations at 80 La Salle Street

Manhattan, NY 10027 · BBL 1-01978-0001 · Back to the property

HPD housing violations

42 HPD violations, newest first.

  • BHazardous

    Properly repair with similar material the broken or defective hard wood floor in the 3rd room from north located at apt 17c, 17th story, 1st apartment from north at east

    Jan 21, 2025 · Apt 17C

    Closed — Violation closed
  • BHazardous

    Properly repair with similar material the broken or defective wood base board at all walls in the private hallway located at apt 17c, 17th story, 1st apartment from north at east

    Jan 21, 2025 · Apt 17C

    Closed — Violation closed
  • BHazardous

    Properly repair with similar material the broken or defective hardwood floor in the private hallway located at apt 17c, 17th story, 1st apartment from north at east

    Jan 21, 2025 · Apt 17C

    Closed — Violation closed
  • BHazardous

    Properly repair with similar material the broken or defective hard wood floor in the kitchen located at apt 17c, 17th story, 1st apartment from north at east

    Jan 21, 2025 · Apt 17C

    Closed — Violation closed
  • BHazardous

    Properly repair with similar material the broken or defective wood base board at south, west and north walls in the 1st room from north located at apt 17c, 17th story, 1st apartment from north at east

    Jan 21, 2025 · Apt 17C

    Closed — Violation closed
  • BHazardous

    Properly repair with similar material the broken or defective hard wood floor in the 1st room from north located at apt 17c, 17th story, 1st apartment from north at east

    Jan 21, 2025 · Apt 17C

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from north located at apt 17c, 17th story, 1st apartment from north at east

    Jan 21, 2025 · Apt 17C

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the foyer located at apt 6a, 6th story, 3rd apartment from south at west

    Sep 22, 2024 · Apt 6A

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the private hallway located at apt 6a, 6th story, 3rd apartment from south at west

    Sep 22, 2024 · Apt 6A

    Closed — Violation dismissed
  • ANon-hazardous

    Paint metal in accordance with dept. regulation at west wall in the kitchen located at apt 6a, 6th story, 3rd apartment from south at west

    Sep 22, 2024 · Apt 6A

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the kitchen located at apt 6a, 6th story, 3rd apartment from south at west

    Sep 22, 2024 · Apt 6A

    Closed — Violation dismissed
  • BHazardous

    Properly repair with similar material the broken or defective hardwood floor in the 3rd room from north located at apt 2g, 2nd story, 1st apartment from west at north

    May 18, 2024 · Apt 2G

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 19b, 16th story, 5th apartment from north at east

    Apr 30, 2024 · Apt 19B

    Closed — Violation dismissed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 12a, 12th story, 3rd apartment from south at west , section ''north''

    Oct 1, 2021 · Apt 12A

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 12a, 12th story, 3rd apartment from south at west , section ''north''

    Oct 1, 2021 · Apt 12A

    Closed — Violation closed
  • CImmediately hazardous

    Replace with new the broken or defective glass at south side panel of entrance door to the building , 1st story

    Feb 13, 2021

    Closed — Violation closed
  • BHazardous

    Remove all encumbrances consisting of house hold items furniture at public hall, 12th story

    Dec 3, 2020

    Closed — Violation dismissed
  • CImmediately hazardous

    Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 7b, 7th story, 4th apartment from south at west

    May 6, 2020 · Apt 7B

    Closed — Violation closed
  • CImmediately hazardous

    Arrange and make self-closing the doors ...... in the entrance located at apt 18d, 18th story, 2nd apartment from north at east

    Jan 9, 2020 · Apt 18D

    Open — Violation will be reinspected
  • BHazardous

    Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 18d, 18th story, 2nd apartment from north at east

    Jan 9, 2020 · Apt 18D

    Closed — Violation dismissed
  • ANon-hazardous

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story

    Jan 9, 2020

    Open — Violation will be reinspected
  • ANon-hazardous

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing at public hall, 1st story

    Jan 9, 2020

    Open — Violation will be reinspected
  • BHazardous

    Remove all encumbrances consisting of house hold items furniture at public hall, 18th story

    Oct 10, 2019

    Closed — Violation closed
  • BHazardous

    Remove all encumbrances consisting of house hold items furniture at public hall, 1st story

    Oct 10, 2019

    Closed — Violation dismissed
  • ANon-hazardous

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story

    Oct 10, 2019

    Closed — Violation closed
  • ANon-hazardous

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Oct 10, 2019

    Closed — Violation closed
  • ANon-hazardous

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing at public hall, 1st story

    Oct 10, 2019

    Closed — Violation closed
  • ANon-hazardous

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Oct 10, 2019

    Closed — Violation closed
  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Oct 10, 2019

    Closed — Violation closed
  • ANon-hazardous

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Oct 10, 2019

    Closed — Violation closed
  • CImmediately hazardous

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing at public hall, 1st story

    Oct 10, 2019

    Closed — Violation closed
  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Mar 17, 2019

    Closed — Violation closed
  • ANon-hazardous

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Mar 17, 2019

    Closed — Violation closed
  • ANon-hazardous

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Mar 17, 2019

    Closed — Violation dismissed
  • ANon-hazardous

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Mar 17, 2019

    Closed — Violation closed
  • CImmediately hazardous

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story

    Mar 17, 2019

    Closed — Violation closed
  • ANon-hazardous

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Mar 17, 2019

    Closed — Violation closed
  • ANon-hazardous

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Mar 17, 2019

    Closed — Violation closed
  • ANon-hazardous

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. , 1st story

    Oct 21, 2015

    Closed — Violation closed
  • BHazardous

    Abate the nuisance consisting of bedbugs in the entire apartment located at apt 18a, 18th story, 1st apartment from west at north , section at north

    Nov 9, 2012 · Apt 18A

    Closed — Violation closed
  • BHazardous

    Properly repair with similar material the broken or defective wood floor in the 4th room from north located at apt 18d, 18th story, 2nd apartment from north at east

    Feb 28, 2012 · Apt 18D

    Closed — Violation closed
  • ANon-hazardous

    D26-12.01 adm code paint with light colored paint to the satisfaction of this department walls ceilings and woodwork 2nd sty northeast apt 2c throughout. , section '' ''

    Mar 19, 1986 · Apt 2C

    Closed — Violation dismissed

DOB building violations

The newest 50 of 180 DOB violations. The city keeps the complete history.

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 22, 2025

    Dob violation - dismissed
  • Construction other optional

    The dob hereby orders you to stop all work under job # m00502126 - except to make site safe - due to special inspector alberto roman, pe, surrendered all filing privileges

    Aug 18, 2022

    Dob violation - dismissed
  • Construction other optional

    The dob hereby orders you to stop all work under job #m00502126 - except to make site safe - due to special inspector alberto roman, pe, surrendered all filing privileges

    Aug 18, 2022

    Dob violation - dismissed
  • Plumbing none

    Commissioners request for immediate corrective action i observed in the basement 3 commercial stackable gas dryer vent back pitched observed condition(s) does not comply with section 28-301.1 of the b102 and presents an imminent risk to public safety. correct the situation within 48 hours

    Aug 5, 2022

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 29, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 20, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 20, 2021

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 24, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 24, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 24, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 24, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 24, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 24, 2018

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 16, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 7, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 7, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 21, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 7, 2018

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 25, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 25, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 25, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 25, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 25, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 25, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 25, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 25, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 7, 2016

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 13, 2016

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 4, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 4, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 4, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 4, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 4, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 4, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 18, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 18, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 18, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 18, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 18, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 18, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 18, 2014

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst

    May 30, 2014

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2012 inspection/test

    Mar 31, 2014

    Dob violation - dismissed
  • Facade facade optional

    Cycle 7 unsafe report filed

    Sep 30, 2013

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 24, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 24, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 24, 2013

    Dob violation - resolved
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7b technical report by 08/21/2012

    Aug 30, 2013

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 8, 2013

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 8, 2013

    Dob violation - dismissed

ECB violations

The newest 50 of 149 ECB violations. The city keeps the complete history.

  • Class - 2

    I observed a sidewalk shed constructed at all expos contrary to code. multiple locations at all expos with pipe header across provided pathway set below 8ft min height requirement contrary to code 3307.6.4.7 .t

    Nov 18, 2025 · Penalty $2,430

    Resolve
  • Class - 2

    During the inspection, i observed that the sidewalk shed (sws) at exposure #1 (lasalle street) was not built or maintained according to code. the steel pipe/columns was out of plumb, horizontal bracings were m

    Jul 23, 2025

    Resolve
  • Class - 2

    I observed a work/storage zone installed in street at expos 1 contrary to code 3307.4.7. storage work zones adjacent from a sidewalk shed shall be provided with a solid 4ft barrier with mesh or netting on top

    Jul 14, 2025 · Penalty $2,500

    Resolve
  • Class - 2

    I observed a sidewalk shed installed at expos 1,2&4 not maintained according to code 3307.6.5 . multiple unprotected bolts along the pedestrian pathway under shed contrary to code 3307.6.5.6 sharp edges . sever

    Jul 14, 2025 · Penalty $2,400

    Resolve
  • Class - 2

    I observed at sidewalk shed installed at expos 1,2&4 contrary to code. multiple locations with a horizontal pipe across the pedestrian pathway set at height below 8ft minimum at expos 1 & 4 contrary to code 330

    Jul 14, 2025 · Penalty $2,400

    Resolve
  • Class - 2

    Facade work, active site rigger foreman present upon inspection was found tree not protected on exposure 1,4 ,protection of trees meeting the requirements of the departments parks and recreation and shall be pr

    Jun 20, 2025 · Penalty $2,500

    Resolve
  • Class - 2

    Work not conforming provided drawings., observed outrigger system stand beam erected on corner exposure 2 & 4 at roof level and noted it erected without styrofoam as showing on drawings cd5 pg 8 of 19 contrary

    Jun 20, 2025

    Resolve
  • Class - 1

    Facade work, active site rigger forman present upon inspection checked sws and found it contrary to drawings columns on corner exposure 1 and 4 not plumb mudsills not flat on osha planks creating hazards for wo

    Jun 20, 2025 · Penalty $1,250

    Resolve
  • Class - 2

    No facade work observed at time of inspection. observed installed sidewalk shed on west 123rd street with a damaged sidewalk shed parapet information panel. reference 2022 building code (3301.9.2.6), "sidewalk

    Feb 18, 2025 · Penalty $1,250

    Resolve
  • Class - 2

    Observed installed sidewalk shed on west 123rd street. upon inspection, observed missing red light on the sidewalk shed for building's standpipe connection. reference 2022 building code (3303.8.2), "fire depart

    Jan 29, 2025 · Penalty $2,500

    Resolve
  • Class - 2

    Respondent failed to correct violating condition and file for a certificate of correction pursuant to ac 28-204.4 for violation no. 39534534y issued 11/20/2024. at time of inspection, i observed inactive job. i

    Jan 15, 2025 · Penalty $625

    Resolve
  • Class - 1

    21 story alteration facade work active site. observed worker's onsite erecting sidewalk shed/overhead protection at exp#2 by loading docks permit#m01092734. upon inspection of 32 hr training cards. observed 3 w

    Nov 19, 2024 · Penalty $5,000

    Resolve
  • Class - 2

    21 story active site for alteration facade work. observed work contrary to site safety plans details. no/missing or inadequate tree protection exp#1,3,4. observed worker's onsite erecting sidewalk shed/overhead

    Nov 19, 2024

    Resolve
  • Class - 2

    At time of inspection observed active suspended platforms. upon requesting pre-task and daily inspection log for suspended scaffold it was not provided for day of inspection instated cp provided logs dated 11-1

    Nov 18, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    At time of inspection observed active suspended scaffolds. upon revieing manufacture specification for skyclimber platforms notice config. is contrary to specs. config. of 2 platforms are 2-1-3 as per manufactu

    Nov 18, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    At time of inspection observed active suspended scaffolds. upon reviewing cd-5 notice some discrepancies, as per drawings provided a hoist rated capacity of 1000 lbs. should be installed instead 3 1500 lbs. wer

    Nov 18, 2024

    Resolve
  • Class - 2

    Observer active suspended scaffold in use @ expo 1 and 2. use of styrofoam for protection and load distribution for the roof under the suspended scaffold screw jacks. when reviewing dob approved suspended scaff

    Nov 14, 2024

    Resolve
  • Class - 1

    Failure to submit the required parking structure initial observation report for an existing parking structure or a periodic inspection of a parking structure(pips)report documenting the conditions of psid#m0002

    Oct 1, 2024

    Resolve
  • Class - 1

    Atoi, work at apt #9a at 9th fl of premises far beyond the scope of laa #m00920246 - permit states new fixtures on existing roughing at kitchen & bathroom - firestopping not disturbed - however, there is extens

    Nov 15, 2023 · Penalty $2,500

    Resolve
  • Class - 2

    At time of inspection, 4 square feet of missing sheetrock at wall and ceiling at bathroom at apt #7a, repair and/or replace; repair wall andceiling at bathroom at apt #7a

    Nov 15, 2023 · Penalty $312

    Resolve
  • Class - 1

    28-103.13 right of entry, the premises of apt 9f under job #m009890199 at time of inspection, knocked on apt door 9f several times, and during when the work noise stopped, the sound of construction or demolitio

    Oct 10, 2023 · Penalty $625

    Resolve
  • Class - 2

    Failure to distribute or post notice of tenant protection plan. i spoke with tenants from apts 5b and 11h and was informed that were not provided a copy of the "tpp" from the loop- shareholder of apt 9f, upon a

    Oct 10, 2023 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to post or distribute "safe construction bill of rights." i spoke with tenants from apt #5b and 11h and was informed that they were not provided a copy of the "scbor" from the loop - shareholder of apt

    Oct 10, 2023 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to maintain building in code complaint manner i observed in the basement in the laundry room sprinkler heads are less than six feet apart, repair and/replace

    Aug 5, 2022 · Penalty $1,250

    Resolve
  • Class - 1

    I observed in the basement the sprinkler system in the laundry room is tied into domestic water line and not the dedicated fire line in the building. refer to the provision of law bc 903 and to nfpa 13 section

    Aug 5, 2022 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to maintain building in code complaint manner i observed in the basement in the laundry room behind three commercial stackable gas dryers vent is back pitched also there is opening on the vent inside th

    Aug 5, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner. observed cellar level laundry room with (6) clothes dryers present and exhausting to exterior of building however point of discharge is not more than 10' f

    Sep 17, 2021 · Penalty $312

    Resolve
  • Class - 1

    Failure to comply w/commissioner's order contained in summons/v39030116m issued10/8/20 &to file c/c pursuant to28-201.1&1rcny102-01.comply w/commissioner's order &/or file c/c.

    Aug 2, 2021 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to comply w/commissioner's order contained in summons/v39030119h issued10/19/20&to file c/c pursuant to28-201.1&1rcny102-01.no permit or app filed to correct violation condition for work w/o permit comp

    Aug 2, 2021 · Penalty $6,250

    Active
  • Class - 1

    Cease use; 97m07: work done without permit, file application & obtain permit

    Jul 10, 2021

    Resolve
  • Class - 1

    Failure to comply w/commissioner's order contained in summons/v39030116m issued10/8/20 &to file c/c pursuant to28-201.1&1rcny102-01.work w/opermit.comply w/commissioner's order &/or file c/c.

    Jun 8, 2021 · Penalty $6,250

    Resolve
  • Class - 1

    Failure to comply w/commissioner's order contained in summons/v39030119h issued10/19/20&to file c/c pursuant to28-201.1&1rcny102-01.work w/opermit.cert disapproved5/26/21.comply w/commissioner's order &/or file

    Jun 8, 2021 · Penalty $6,250

    Active
  • Class - 1

    Owner failed to ensure that each construction or demolition worker engaged at the site has a sst card.at the time of inspection,i observed marvin f bermudez working at site without a sst card.remedy:comply with

    Apr 29, 2021

    Resolve
  • Class - 1

    Permit holder failed to ensure that each construction or demolition worker enagged at the site has a sst card or a temporary sst card.jose francisco rosario working at the site without a sst card or temporary s

    Apr 29, 2021

    Resolve
  • Class - 1

    Permit holder failed to ensure that each construction or demolition worker working/engaged at the site has a sst card and or temporary sst card.jose ricardo guizer working at site without an sst card and or tem

    Apr 29, 2021

    Resolve
  • Class - 1

    Permit holder failed to ensure that each construction or demolition worker working/engaged at the site has a sst card or temporary sst card.marvin f. bermudez medinus working at site without an sst card or temp

    Apr 29, 2021 · Penalty $1,250

    Resolve
  • Class - 1

    Owner failed to ensure that each construction or demolition worker working/engaged at the site has a sst card.at the time of inspection i observed jose franciso roserio working at site without sst card.rem:comp

    Apr 29, 2021

    Resolve
  • Class - 1

    Owner failed to ensure that each construction or demolition worker working/engaged at the site has a sst card.at the time of inspection i observed jose guizer working at site without sst card.rem:comply with bc

    Apr 29, 2021

    Resolve
  • Class - 1

    Failure to comply w/commissioner's order contained in summons/v39030119h issued10/9/20&to file c/c pursuant to28-201.1&1rcny102-01.no permitor app filed to correct vcondition for work w/o permit.comply w/commis

    Apr 19, 2021 · Penalty $2,500

    Active
  • Class - 1

    Failure to comply w/commissioner's order contained in summons/v39030116m issued10/8/20&to file c/c pursuant to28-201.1&1rcny102-01.no permitor app filed to correct violating condition for work w/o permit.comply

    Apr 19, 2021 · Penalty $6,250

    Resolve
  • Class - 1

    Failure to comply w/the comm's order contained in summons/vio#39030116m issued on 10/08/20 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. no permit or application filed to correct violating

    Mar 2, 2021 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to comply w/the comm's order contained in summons/vio#39030119h issued on 10/09/20 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. no permit or application filed to correct violation

    Mar 2, 2021 · Penalty $2,500

    Active
  • Class - 1

    Failure to comply w/ the commissioner's order contained in summons/vio#39030119h issued on 10/8/2020 and to file a certificate of correctionpursuant to 28-201.1 and 1rcny 102-01. work w/o permit(at apt#8g). rem

    Dec 28, 2020 · Penalty $2,500

    Active
  • Class - 1

    Failure to comply with the commissioner's order contained in summons/violation#39030116m issued on 10/08/20 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.work without a permit el

    Dec 28, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Work without a permit. at time of inspection observed aluminum and glass enclosure has been installed to enclose terrace of apartment 8g thus creating additional interior living space, multiple other terraces o

    Oct 8, 2020 · Penalty $2,500

    Active
  • Class - 2

    Altered/changed building occupied without valid certificate of occupancy as per 28-118.3.1 - 28-118.3.2. building fully occupied residential over commercial, tco #120396071t001 expired 12/22/2011., obtain a val

    Oct 8, 2020 · Penalty $1,250

    Active
  • Class - 2

    Work without a permit plumbing. at time of inspection observed washing machine located on enclosed terrace in apt. #8g. hot and cold 3/4" copper piping has been extended from existing kitchen to terrace as well

    Oct 8, 2020 · Penalty $1,250

    Active
  • Class - 1

    Work without a permit electrical. observed 220 volt electrical receptacle and duplex 120 volt receptacle with associated conduit and wiring installed on wall of enclosed terrace to provide power to washer and d

    Oct 8, 2020 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to maintain bldg walls or appurtenances. as noted: at time of inspection observed several a/c units at exp#1,3,4 missing required a/c brackets. failure to maintain bldg in code compliant manner causes

    Mar 13, 2020 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply with the commissioners order contained in summons/ violation #38259837l issued on 12/01/17 and to file a certificate of ccorrection pursuant to28.201.1 and 1rcny 102-01(d)(2). an acceptible

    Aug 30, 2018 · Penalty $3,125

    Resolve