Violations at 80 La Salle Street
Manhattan, NY 10027 · BBL 1-01978-0001 · Back to the property
HPD housing violations
42 HPD violations, newest first.
- BHazardous
Properly repair with similar material the broken or defective hard wood floor in the 3rd room from north located at apt 17c, 17th story, 1st apartment from north at east
Jan 21, 2025 · Apt 17C
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood base board at all walls in the private hallway located at apt 17c, 17th story, 1st apartment from north at east
Jan 21, 2025 · Apt 17C
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective hardwood floor in the private hallway located at apt 17c, 17th story, 1st apartment from north at east
Jan 21, 2025 · Apt 17C
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective hard wood floor in the kitchen located at apt 17c, 17th story, 1st apartment from north at east
Jan 21, 2025 · Apt 17C
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood base board at south, west and north walls in the 1st room from north located at apt 17c, 17th story, 1st apartment from north at east
Jan 21, 2025 · Apt 17C
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective hard wood floor in the 1st room from north located at apt 17c, 17th story, 1st apartment from north at east
Jan 21, 2025 · Apt 17C
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from north located at apt 17c, 17th story, 1st apartment from north at east
Jan 21, 2025 · Apt 17C
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the foyer located at apt 6a, 6th story, 3rd apartment from south at west
Sep 22, 2024 · Apt 6A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the private hallway located at apt 6a, 6th story, 3rd apartment from south at west
Sep 22, 2024 · Apt 6A
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation at west wall in the kitchen located at apt 6a, 6th story, 3rd apartment from south at west
Sep 22, 2024 · Apt 6A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the kitchen located at apt 6a, 6th story, 3rd apartment from south at west
Sep 22, 2024 · Apt 6A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective hardwood floor in the 3rd room from north located at apt 2g, 2nd story, 1st apartment from west at north
May 18, 2024 · Apt 2G
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 19b, 16th story, 5th apartment from north at east
Apr 30, 2024 · Apt 19B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 12a, 12th story, 3rd apartment from south at west , section ''north''
Oct 1, 2021 · Apt 12A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 12a, 12th story, 3rd apartment from south at west , section ''north''
Oct 1, 2021 · Apt 12A
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective glass at south side panel of entrance door to the building , 1st story
Feb 13, 2021
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of house hold items furniture at public hall, 12th story
Dec 3, 2020
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 7b, 7th story, 4th apartment from south at west
May 6, 2020 · Apt 7B
Closed — Violation closed - CImmediately hazardous
Arrange and make self-closing the doors ...... in the entrance located at apt 18d, 18th story, 2nd apartment from north at east
Jan 9, 2020 · Apt 18D
Open — Violation will be reinspected - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 18d, 18th story, 2nd apartment from north at east
Jan 9, 2020 · Apt 18D
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Jan 9, 2020
Open — Violation will be reinspected - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing at public hall, 1st story
Jan 9, 2020
Open — Violation will be reinspected - BHazardous
Remove all encumbrances consisting of house hold items furniture at public hall, 18th story
Oct 10, 2019
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of house hold items furniture at public hall, 1st story
Oct 10, 2019
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Oct 10, 2019
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Oct 10, 2019
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing at public hall, 1st story
Oct 10, 2019
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Oct 10, 2019
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Oct 10, 2019
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Oct 10, 2019
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing at public hall, 1st story
Oct 10, 2019
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Mar 17, 2019
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Mar 17, 2019
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Mar 17, 2019
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Mar 17, 2019
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Mar 17, 2019
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Mar 17, 2019
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Mar 17, 2019
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. , 1st story
Oct 21, 2015
Closed — Violation closed - BHazardous
Abate the nuisance consisting of bedbugs in the entire apartment located at apt 18a, 18th story, 1st apartment from west at north , section at north
Nov 9, 2012 · Apt 18A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 4th room from north located at apt 18d, 18th story, 2nd apartment from north at east
Feb 28, 2012 · Apt 18D
Closed — Violation closed - ANon-hazardous
D26-12.01 adm code paint with light colored paint to the satisfaction of this department walls ceilings and woodwork 2nd sty northeast apt 2c throughout. , section '' ''
Mar 19, 1986 · Apt 2C
Closed — Violation dismissed
DOB building violations
The newest 50 of 180 DOB violations. The city keeps the complete history.
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 22, 2025
Dob violation - dismissed - Construction other optional
The dob hereby orders you to stop all work under job # m00502126 - except to make site safe - due to special inspector alberto roman, pe, surrendered all filing privileges
Aug 18, 2022
Dob violation - dismissed - Construction other optional
The dob hereby orders you to stop all work under job #m00502126 - except to make site safe - due to special inspector alberto roman, pe, surrendered all filing privileges
Aug 18, 2022
Dob violation - dismissed - Plumbing none
Commissioners request for immediate corrective action i observed in the basement 3 commercial stackable gas dryer vent back pitched observed condition(s) does not comply with section 28-301.1 of the b102 and presents an imminent risk to public safety. correct the situation within 48 hours
Aug 5, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 29, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 20, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 20, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 24, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 24, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 24, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 24, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 24, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 24, 2018
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 16, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 7, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 7, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 21, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 7, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 25, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 25, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 25, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 25, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 25, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 25, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 25, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 25, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 7, 2016
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 13, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 4, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 4, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 4, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 4, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 4, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 4, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 18, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 18, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 18, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 18, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 18, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 18, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 18, 2014
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Sep 30, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 24, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 24, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 24, 2013
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7b technical report by 08/21/2012
Aug 30, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 8, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 8, 2013
Dob violation - dismissed
ECB violations
The newest 50 of 149 ECB violations. The city keeps the complete history.
- Class - 2
I observed a sidewalk shed constructed at all expos contrary to code. multiple locations at all expos with pipe header across provided pathway set below 8ft min height requirement contrary to code 3307.6.4.7 .t
Nov 18, 2025 · Penalty $2,430
Resolve - Class - 2
During the inspection, i observed that the sidewalk shed (sws) at exposure #1 (lasalle street) was not built or maintained according to code. the steel pipe/columns was out of plumb, horizontal bracings were m
Jul 23, 2025
Resolve - Class - 2
I observed a work/storage zone installed in street at expos 1 contrary to code 3307.4.7. storage work zones adjacent from a sidewalk shed shall be provided with a solid 4ft barrier with mesh or netting on top
Jul 14, 2025 · Penalty $2,500
Resolve - Class - 2
I observed a sidewalk shed installed at expos 1,2&4 not maintained according to code 3307.6.5 . multiple unprotected bolts along the pedestrian pathway under shed contrary to code 3307.6.5.6 sharp edges . sever
Jul 14, 2025 · Penalty $2,400
Resolve - Class - 2
I observed at sidewalk shed installed at expos 1,2&4 contrary to code. multiple locations with a horizontal pipe across the pedestrian pathway set at height below 8ft minimum at expos 1 & 4 contrary to code 330
Jul 14, 2025 · Penalty $2,400
Resolve - Class - 2
Facade work, active site rigger foreman present upon inspection was found tree not protected on exposure 1,4 ,protection of trees meeting the requirements of the departments parks and recreation and shall be pr
Jun 20, 2025 · Penalty $2,500
Resolve - Class - 2
Work not conforming provided drawings., observed outrigger system stand beam erected on corner exposure 2 & 4 at roof level and noted it erected without styrofoam as showing on drawings cd5 pg 8 of 19 contrary
Jun 20, 2025
Resolve - Class - 1
Facade work, active site rigger forman present upon inspection checked sws and found it contrary to drawings columns on corner exposure 1 and 4 not plumb mudsills not flat on osha planks creating hazards for wo
Jun 20, 2025 · Penalty $1,250
Resolve - Class - 2
No facade work observed at time of inspection. observed installed sidewalk shed on west 123rd street with a damaged sidewalk shed parapet information panel. reference 2022 building code (3301.9.2.6), "sidewalk
Feb 18, 2025 · Penalty $1,250
Resolve - Class - 2
Observed installed sidewalk shed on west 123rd street. upon inspection, observed missing red light on the sidewalk shed for building's standpipe connection. reference 2022 building code (3303.8.2), "fire depart
Jan 29, 2025 · Penalty $2,500
Resolve - Class - 2
Respondent failed to correct violating condition and file for a certificate of correction pursuant to ac 28-204.4 for violation no. 39534534y issued 11/20/2024. at time of inspection, i observed inactive job. i
Jan 15, 2025 · Penalty $625
Resolve - Class - 1
21 story alteration facade work active site. observed worker's onsite erecting sidewalk shed/overhead protection at exp#2 by loading docks permit#m01092734. upon inspection of 32 hr training cards. observed 3 w
Nov 19, 2024 · Penalty $5,000
Resolve - Class - 2
21 story active site for alteration facade work. observed work contrary to site safety plans details. no/missing or inadequate tree protection exp#1,3,4. observed worker's onsite erecting sidewalk shed/overhead
Nov 19, 2024
Resolve - Class - 2
At time of inspection observed active suspended platforms. upon requesting pre-task and daily inspection log for suspended scaffold it was not provided for day of inspection instated cp provided logs dated 11-1
Nov 18, 2024 · Penalty $1,250
Resolve - Class - 2
At time of inspection observed active suspended scaffolds. upon revieing manufacture specification for skyclimber platforms notice config. is contrary to specs. config. of 2 platforms are 2-1-3 as per manufactu
Nov 18, 2024 · Penalty $1,250
Resolve - Class - 2
At time of inspection observed active suspended scaffolds. upon reviewing cd-5 notice some discrepancies, as per drawings provided a hoist rated capacity of 1000 lbs. should be installed instead 3 1500 lbs. wer
Nov 18, 2024
Resolve - Class - 2
Observer active suspended scaffold in use @ expo 1 and 2. use of styrofoam for protection and load distribution for the roof under the suspended scaffold screw jacks. when reviewing dob approved suspended scaff
Nov 14, 2024
Resolve - Class - 1
Failure to submit the required parking structure initial observation report for an existing parking structure or a periodic inspection of a parking structure(pips)report documenting the conditions of psid#m0002
Oct 1, 2024
Resolve - Class - 1
Atoi, work at apt #9a at 9th fl of premises far beyond the scope of laa #m00920246 - permit states new fixtures on existing roughing at kitchen & bathroom - firestopping not disturbed - however, there is extens
Nov 15, 2023 · Penalty $2,500
Resolve - Class - 2
At time of inspection, 4 square feet of missing sheetrock at wall and ceiling at bathroom at apt #7a, repair and/or replace; repair wall andceiling at bathroom at apt #7a
Nov 15, 2023 · Penalty $312
Resolve - Class - 1
28-103.13 right of entry, the premises of apt 9f under job #m009890199 at time of inspection, knocked on apt door 9f several times, and during when the work noise stopped, the sound of construction or demolitio
Oct 10, 2023 · Penalty $625
Resolve - Class - 2
Failure to distribute or post notice of tenant protection plan. i spoke with tenants from apts 5b and 11h and was informed that were not provided a copy of the "tpp" from the loop- shareholder of apt 9f, upon a
Oct 10, 2023 · Penalty $1,250
Resolve - Class - 2
Failure to post or distribute "safe construction bill of rights." i spoke with tenants from apt #5b and 11h and was informed that they were not provided a copy of the "scbor" from the loop - shareholder of apt
Oct 10, 2023 · Penalty $1,250
Resolve - Class - 1
Failure to maintain building in code complaint manner i observed in the basement in the laundry room sprinkler heads are less than six feet apart, repair and/replace
Aug 5, 2022 · Penalty $1,250
Resolve - Class - 1
I observed in the basement the sprinkler system in the laundry room is tied into domestic water line and not the dedicated fire line in the building. refer to the provision of law bc 903 and to nfpa 13 section
Aug 5, 2022 · Penalty $2,500
Resolve - Class - 1
Failure to maintain building in code complaint manner i observed in the basement in the laundry room behind three commercial stackable gas dryers vent is back pitched also there is opening on the vent inside th
Aug 5, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to maintain building in code compliant manner. observed cellar level laundry room with (6) clothes dryers present and exhausting to exterior of building however point of discharge is not more than 10' f
Sep 17, 2021 · Penalty $312
Resolve - Class - 1
Failure to comply w/commissioner's order contained in summons/v39030116m issued10/8/20 &to file c/c pursuant to28-201.1&1rcny102-01.comply w/commissioner's order &/or file c/c.
Aug 2, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to comply w/commissioner's order contained in summons/v39030119h issued10/19/20&to file c/c pursuant to28-201.1&1rcny102-01.no permit or app filed to correct violation condition for work w/o permit comp
Aug 2, 2021 · Penalty $6,250
Active - Class - 1
Cease use; 97m07: work done without permit, file application & obtain permit
Jul 10, 2021
Resolve - Class - 1
Failure to comply w/commissioner's order contained in summons/v39030116m issued10/8/20 &to file c/c pursuant to28-201.1&1rcny102-01.work w/opermit.comply w/commissioner's order &/or file c/c.
Jun 8, 2021 · Penalty $6,250
Resolve - Class - 1
Failure to comply w/commissioner's order contained in summons/v39030119h issued10/19/20&to file c/c pursuant to28-201.1&1rcny102-01.work w/opermit.cert disapproved5/26/21.comply w/commissioner's order &/or file
Jun 8, 2021 · Penalty $6,250
Active - Class - 1
Owner failed to ensure that each construction or demolition worker engaged at the site has a sst card.at the time of inspection,i observed marvin f bermudez working at site without a sst card.remedy:comply with
Apr 29, 2021
Resolve - Class - 1
Permit holder failed to ensure that each construction or demolition worker enagged at the site has a sst card or a temporary sst card.jose francisco rosario working at the site without a sst card or temporary s
Apr 29, 2021
Resolve - Class - 1
Permit holder failed to ensure that each construction or demolition worker working/engaged at the site has a sst card and or temporary sst card.jose ricardo guizer working at site without an sst card and or tem
Apr 29, 2021
Resolve - Class - 1
Permit holder failed to ensure that each construction or demolition worker working/engaged at the site has a sst card or temporary sst card.marvin f. bermudez medinus working at site without an sst card or temp
Apr 29, 2021 · Penalty $1,250
Resolve - Class - 1
Owner failed to ensure that each construction or demolition worker working/engaged at the site has a sst card.at the time of inspection i observed jose franciso roserio working at site without sst card.rem:comp
Apr 29, 2021
Resolve - Class - 1
Owner failed to ensure that each construction or demolition worker working/engaged at the site has a sst card.at the time of inspection i observed jose guizer working at site without sst card.rem:comply with bc
Apr 29, 2021
Resolve - Class - 1
Failure to comply w/commissioner's order contained in summons/v39030119h issued10/9/20&to file c/c pursuant to28-201.1&1rcny102-01.no permitor app filed to correct vcondition for work w/o permit.comply w/commis
Apr 19, 2021 · Penalty $2,500
Active - Class - 1
Failure to comply w/commissioner's order contained in summons/v39030116m issued10/8/20&to file c/c pursuant to28-201.1&1rcny102-01.no permitor app filed to correct violating condition for work w/o permit.comply
Apr 19, 2021 · Penalty $6,250
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#39030116m issued on 10/08/20 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. no permit or application filed to correct violating
Mar 2, 2021 · Penalty $1,250
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#39030119h issued on 10/09/20 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. no permit or application filed to correct violation
Mar 2, 2021 · Penalty $2,500
Active - Class - 1
Failure to comply w/ the commissioner's order contained in summons/vio#39030119h issued on 10/8/2020 and to file a certificate of correctionpursuant to 28-201.1 and 1rcny 102-01. work w/o permit(at apt#8g). rem
Dec 28, 2020 · Penalty $2,500
Active - Class - 1
Failure to comply with the commissioner's order contained in summons/violation#39030116m issued on 10/08/20 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.work without a permit el
Dec 28, 2020 · Penalty $2,500
Resolve - Class - 1
Work without a permit. at time of inspection observed aluminum and glass enclosure has been installed to enclose terrace of apartment 8g thus creating additional interior living space, multiple other terraces o
Oct 8, 2020 · Penalty $2,500
Active - Class - 2
Altered/changed building occupied without valid certificate of occupancy as per 28-118.3.1 - 28-118.3.2. building fully occupied residential over commercial, tco #120396071t001 expired 12/22/2011., obtain a val
Oct 8, 2020 · Penalty $1,250
Active - Class - 2
Work without a permit plumbing. at time of inspection observed washing machine located on enclosed terrace in apt. #8g. hot and cold 3/4" copper piping has been extended from existing kitchen to terrace as well
Oct 8, 2020 · Penalty $1,250
Active - Class - 1
Work without a permit electrical. observed 220 volt electrical receptacle and duplex 120 volt receptacle with associated conduit and wiring installed on wall of enclosed terrace to provide power to washer and d
Oct 8, 2020 · Penalty $2,500
Resolve - Class - 2
Failure to maintain bldg walls or appurtenances. as noted: at time of inspection observed several a/c units at exp#1,3,4 missing required a/c brackets. failure to maintain bldg in code compliant manner causes
Mar 13, 2020 · Penalty $1,250
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/ violation #38259837l issued on 12/01/17 and to file a certificate of ccorrection pursuant to28.201.1 and 1rcny 102-01(d)(2). an acceptible
Aug 30, 2018 · Penalty $3,125
Resolve