80 La Salle Street
Manhattan, NY 10027BBL 1-01978-0001Map
Owner of record: Morningside Hgts Housing Corp
80 La Salle Street is an elevator apartment building built in 1956 in Manhattan, 10027. It has 982 residential units across 21 floors. The owner of record is Morningside Hgts Housing Corp. HPD has recorded 42 housing violations here, most recently on January 21, 2025. 3 of the 42 most recent violations are still open.
- HPD violations
- 42
- DOB violations
- 180
- ECB violations
- 149
- HPD complaints
- 177
Available now in this building
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. The newest 10 per agency here; the full lists are a click away.
HPD housing violations · 42
- BHazardous
Properly repair with similar material the broken or defective hard wood floor in the 3rd room from north located at apt 17c, 17th story, 1st apartment from north at east
Jan 21, 2025 · Apt 17C
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood base board at all walls in the private hallway located at apt 17c, 17th story, 1st apartment from north at east
Jan 21, 2025 · Apt 17C
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective hardwood floor in the private hallway located at apt 17c, 17th story, 1st apartment from north at east
Jan 21, 2025 · Apt 17C
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective hard wood floor in the kitchen located at apt 17c, 17th story, 1st apartment from north at east
Jan 21, 2025 · Apt 17C
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood base board at south, west and north walls in the 1st room from north located at apt 17c, 17th story, 1st apartment from north at east
Jan 21, 2025 · Apt 17C
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective hard wood floor in the 1st room from north located at apt 17c, 17th story, 1st apartment from north at east
Jan 21, 2025 · Apt 17C
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from north located at apt 17c, 17th story, 1st apartment from north at east
Jan 21, 2025 · Apt 17C
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the foyer located at apt 6a, 6th story, 3rd apartment from south at west
Sep 22, 2024 · Apt 6A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the private hallway located at apt 6a, 6th story, 3rd apartment from south at west
Sep 22, 2024 · Apt 6A
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation at west wall in the kitchen located at apt 6a, 6th story, 3rd apartment from south at west
Sep 22, 2024 · Apt 6A
Closed — Violation dismissed
DOB building violations · 180
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 22, 2025
Dob violation - dismissed - Construction other optional
The dob hereby orders you to stop all work under job # m00502126 - except to make site safe - due to special inspector alberto roman, pe, surrendered all filing privileges
Aug 18, 2022
Dob violation - dismissed - Construction other optional
The dob hereby orders you to stop all work under job #m00502126 - except to make site safe - due to special inspector alberto roman, pe, surrendered all filing privileges
Aug 18, 2022
Dob violation - dismissed - Plumbing none
Commissioners request for immediate corrective action i observed in the basement 3 commercial stackable gas dryer vent back pitched observed condition(s) does not comply with section 28-301.1 of the b102 and presents an imminent risk to public safety. correct the situation within 48 hours
Aug 5, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 29, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 20, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 20, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 24, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 24, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 24, 2018
Dob violation - resolved
ECB violations · 149
- Class - 2
I observed a sidewalk shed constructed at all expos contrary to code. multiple locations at all expos with pipe header across provided pathway set below 8ft min height requirement contrary to code 3307.6.4.7 .t
Nov 18, 2025 · Penalty $2,430
Resolve - Class - 2
During the inspection, i observed that the sidewalk shed (sws) at exposure #1 (lasalle street) was not built or maintained according to code. the steel pipe/columns was out of plumb, horizontal bracings were m
Jul 23, 2025
Resolve - Class - 2
I observed a work/storage zone installed in street at expos 1 contrary to code 3307.4.7. storage work zones adjacent from a sidewalk shed shall be provided with a solid 4ft barrier with mesh or netting on top
Jul 14, 2025 · Penalty $2,500
Resolve - Class - 2
I observed a sidewalk shed installed at expos 1,2&4 not maintained according to code 3307.6.5 . multiple unprotected bolts along the pedestrian pathway under shed contrary to code 3307.6.5.6 sharp edges . sever
Jul 14, 2025 · Penalty $2,400
Resolve - Class - 2
I observed at sidewalk shed installed at expos 1,2&4 contrary to code. multiple locations with a horizontal pipe across the pedestrian pathway set at height below 8ft minimum at expos 1 & 4 contrary to code 330
Jul 14, 2025 · Penalty $2,400
Resolve - Class - 2
Facade work, active site rigger foreman present upon inspection was found tree not protected on exposure 1,4 ,protection of trees meeting the requirements of the departments parks and recreation and shall be pr
Jun 20, 2025 · Penalty $2,500
Resolve - Class - 2
Work not conforming provided drawings., observed outrigger system stand beam erected on corner exposure 2 & 4 at roof level and noted it erected without styrofoam as showing on drawings cd5 pg 8 of 19 contrary
Jun 20, 2025
Resolve - Class - 1
Facade work, active site rigger forman present upon inspection checked sws and found it contrary to drawings columns on corner exposure 1 and 4 not plumb mudsills not flat on osha planks creating hazards for wo
Jun 20, 2025 · Penalty $1,250
Resolve - Class - 2
No facade work observed at time of inspection. observed installed sidewalk shed on west 123rd street with a damaged sidewalk shed parapet information panel. reference 2022 building code (3301.9.2.6), "sidewalk
Feb 18, 2025 · Penalty $1,250
Resolve - Class - 2
Observed installed sidewalk shed on west 123rd street. upon inspection, observed missing red light on the sidewalk shed for building's standpipe connection. reference 2022 building code (3303.8.2), "fire depart
Jan 29, 2025 · Penalty $2,500
Resolve
Complaints
- Heat/hot water
Entire building
Oct 20, 2026 · Apt BLDG
Close - Electric
No lighting
Feb 20, 2026 · Apt BLDG
Close - Unsanitary condition
Mold
Jul 17, 2025 · Apt 21G
Close - Door/window
Window frame
Jul 8, 2025 · Apt 21C
Close - General
Ventilation system
Jul 8, 2025 · Apt 21C
Close - Appliance
Electric/gas range
Jun 23, 2025 · Apt 21C
Close - Safety
Window guard broken/missing
Apr 30, 2025 · Apt 5C
Close - Water leak
Slow leak
Jan 16, 2025 · Apt 17C
Close - Plumbing
Water supply
Nov 13, 2024 · Apt 15F
Close - Plumbing
Bathtub/shower
Sep 9, 2024 · Apt 6A
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Aug 27, 2026 | Non-market transfer | Coops - elevator apartments | — |
| Aug 18, 2026 | $310,000 | Coops - elevator apartments | — |
| Aug 18, 2026 | $855,000 | Coops - elevator apartments | — |
| Aug 18, 2026 | $495,000 | Coops - elevator apartments | — |
| Aug 7, 2026 | Non-market transfer | Coops - elevator apartments | — |
| Jul 29, 2026 | Non-market transfer | Coops - elevator apartments | — |
| Jul 27, 2026 | $300,000 | Coops - elevator apartments | — |
| Jul 22, 2026 | $510,000 | Coops - elevator apartments | — |
| Jul 8, 2026 | $312,500 | Coops - elevator apartments | — |
| Jul 8, 2026 | Non-market transfer | Coops - elevator apartments | — |
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1956
- Floors
- 21
- Residential units
- 982
- Building area
- 1,288,976 ft²
- Lot area
- 375,650 ft²
- Zoning
- R7-2
- Community board
- 109
- Council district
- 7
- Block / lot
- 1978 / 1
- Assessed value
- $73,171,800
- Landmark / historic district
- No
HPD registration #137335, last renewed Sep 21, 2026.
Questions about 80 La Salle Street
Who owns 80 La Salle Street?
The owner of record in NYC Department of City Planning PLUTO data is Morningside Hgts Housing Corp.
Does 80 La Salle Street have violations?
Yes. NYC HPD has recorded 42 housing violations at this property.
Is 80 La Salle Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 80 La Salle Street built?
City records list 1956 as the year it was built.
How many apartments are in 80 La Salle Street?
It has 982 residential units and 994 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.





