421 West 125 Street
Manhattan, NY 10027BBL 1-01966-0059Map
Owner of record: Eljamar Rlty Corp
421 West 125 Street is a walk-up apartment building built in 1920 in Manhattan, 10027. It has 28 residential units across 5 floors. The owner of record is Eljamar Rlty Corp. HPD has recorded 325 housing violations here, most recently on October 8, 2026. 21 of the 50 most recent violations are still open. City tax records listed 15 rent-stabilized apartments here in 2024.
- HPD violations
- 325
- DOB violations
- 6
- ECB violations
- 17
- HPD complaints
- 393
Available now in this building
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 325
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 6th room from north located at apt 5, 3rd story, 1st apartment from east at south
Oct 8, 2026 · Apt 5
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective metal top cover at sink in the kitchen located at apt 5, 3rd story, 1st apartment from east at south
Oct 8, 2026 · Apt 5
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water above 130 degrees in the entire apartment located at apt 5, 3rd story, 1st apartment from east at south
Oct 8, 2026 · Apt 5
Open — Nov certified on time - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the private hallway located at apt 5, 3rd story, 1st apartment from east at south
Aug 28, 2026 · Apt 5
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and north wall in the bathroom located at apt 5, 3rd story, 1st apartment from east at south
Aug 28, 2026 · Apt 5
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the bathroom located at apt 5, 3rd story, 1st apartment from east at south
Aug 28, 2026 · Apt 5
Open — Civ14 mailed - ANon-hazardous
Paint metal in accordance with dept. regulation the riser pipe in the 4th room from north located at apt 5, 3rd story, 1st apartment from east at south
Aug 28, 2026 · Apt 5
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and south wall in the 1st room from north located at apt 5, 3rd story, 1st apartment from east at south
Aug 28, 2026 · Apt 5
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 1st room from north located at apt 5, 3rd story, 1st apartment from east at south
Aug 28, 2026 · Apt 5
Open — Civ14 mailed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water temperature exceedingthe limit of 130 degrees fahrenheit in the entire apartment located at apt 5, 3rd story, 1st apartment from east at south
Aug 28, 2026 · Apt 5
Open — Civ14 mailed
Show 40 more ↓
- ANon-hazardous
Paint metal in accordance with dept. regulation riser at north wall in the 4th room from east located at apt 5, 3rd story, 1st apartment from south at west
Aug 24, 2026 · Apt 5
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from east at south located at apt 5, 3rd story, 1st apartment from south at west
Aug 24, 2026 · Apt 5
Open — Invalid certification - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall and ceiling in the bathroom located at apt 5, 3rd story, 1st apartment from south at west
Aug 24, 2026 · Apt 5
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall and ceiling in the bathroom located at apt 5, 3rd story, 1st apartment from south at west
Aug 24, 2026 · Apt 5
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at west wall in the 1st room from east at south located at apt 5, 3rd story, 1st apartment from south at west
Aug 24, 2026 · Apt 5
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from north at east located at apt 5, 3rd story, 1st apartment from east at south
Jul 23, 2026 · Apt 5
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective porcelain glazed finish at bathtub in the bathroom located at apt 5, 3rd story, 1st apartment from east at south
Jul 23, 2026 · Apt 5
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom located at apt 5, 3rd story, 1st apartment from east at south
Jul 23, 2026 · Apt 5
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the bathroom located at apt 5, 3rd story, 1st apartment from east at south
Jul 23, 2026 · Apt 5
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 5, 3rd story, 1st apartment from east at south
Jul 23, 2026 · Apt 5
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 5, 3rd story, 1st apartment from east at south
Jul 23, 2026 · Apt 5
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the riser at west wall in the 4th room from north located at apt 5, 3rd story, 1st apartment from east at south
Jul 23, 2026 · Apt 5
Open — Civ14 mailed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sqft at west wall in the bathroom located at apt 5, 3rd story, 1st apartment from east at south
Feb 11, 2026 · Apt 5
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5, 3rd story, 1st apartment from east at south
Feb 11, 2026 · Apt 5
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sqft at west wall in the bathroom located at apt 5, 3rd story, 1st apartment from east at south original violation 18636478 issued 11-feb-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Feb 11, 2026 · Apt 5
Open — Defect letter issued - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5, 3rd story, 1st apartment from east at south
Feb 5, 2026 · Apt 5
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at east wall at bulkhead at public hall stairs, 5th story
May 19, 2025
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
May 19, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at cellar
Dec 7, 2024
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5, 3rd story, 1st apartment from north at east
Dec 7, 2024 · Apt 5
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective defective hinges in the entrance located at apt apt10, 5th story, 1st apartment from south at west
Nov 5, 2024 · Apt APT10
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft west wall at bathtub in the bathroom located at apt apt10, 5th story, 1st apartment from south at west original violation 17398122 issued 05-nov-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Nov 5, 2024 · Apt APT10
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft west wall at bathtub in the bathroom located at apt apt10, 5th story, 1st apartment from south at west
Nov 5, 2024 · Apt APT10
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls throughout in the 3rd room from north located at apt apt10, 5th story, 1st apartment from south at west
Nov 5, 2024 · Apt APT10
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective vinyl tiles at radiator north wall in the 3rd room from north located at apt apt10, 5th story, 1st apartment from south at west
Nov 5, 2024 · Apt APT10
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls throughout in the 1st room from north located at apt apt10, 5th story, 1st apartment from south at west
Nov 5, 2024 · Apt APT10
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 14, 5th story, 2nd apartment from north at east
Jul 17, 2023 · Apt 14
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector inoperable in the entire apartment located at apt 12, 4th story, 1st apartment from south at west
Jul 17, 2023 · Apt 12
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). inoperable in the entire apartment located at apt 12, 4th story, 1st apartment from south at west
Jul 17, 2023 · Apt 12
Closed — Violation dismissed - ANon-hazardous
Refit door in the entrance located at apt 14, 5th story, 2nd apartment from north at east
Jul 17, 2023 · Apt 14
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 2nd bathroom from north located at apt 4, 2nd story, 1st apartment from south at west
Jul 17, 2023 · Apt 4
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 4, 2nd story, 1st apartment from south at west
Jul 10, 2023 · Apt 4
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 4, 2nd story, 1st apartment from south at west
Jul 10, 2023 · Apt 4
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 2, 2nd story, 2nd apartment from north at east
Jul 10, 2023 · Apt 2
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 11, 4th story, 1st apartment from north at east
Jul 10, 2023 · Apt 11
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 11, 4th story, 1st apartment from north at east
Jul 10, 2023 · Apt 11
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3, 2nd story
Mar 21, 2023 · Apt 3
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls, ceiling and moldings in the private hallway located at apt 3, 2nd story, 1st apartment from north at east
Mar 21, 2023 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of electrical extension cords in the kitchen located at apt 3, 2nd story, 1st apartment from north at east
Mar 21, 2023 · Apt 3
Closed — Violation dismissed
DOB building violations · 6
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2020
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2020
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 13, 2012
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - active
ECB violations · 17
- Class - 1
At the time of inspection i observed in apartment #9,15,17 and the entire hallway all floors. new electrical build out throughout each apartment new outlet switches recessed fixtures branch wiring panel boxes w
Aug 16, 2023 · Penalty $800
Resolve - Class - 2
At the time of inspection in apartment #5 i observed several ungrounded outlets throughout the entire apartment, comply with ec
Aug 16, 2023 · Penalty $2,000
Resolve - Class - 2
Failure to comply w/ the commissioner's order contained in summons/violation#35432180n issued on 9/28/19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. no c/of/c on file. remedy:
Nov 13, 2019 · Penalty $625
Resolve - Class - 2
Failure to notify the department 72 hours prior to the commencement of work, asked the gc for the reference number for the 72 hour notification could not proved it; 3303.10.2, comply with code; comply with not
Nov 8, 2019
Resolve - Class - 1
Tampered with .removwed or defaced a written posted stop work order noted upon inspection observed the full stop work posting removed issued full stopwork order on september 24th due to work without a permit fo
Sep 28, 2019 · Penalty $2,500
Resolve - Class - 2
Work without a permit noted upon inspection observed new electrical work in hallways 1st floor thorugh 5th floor each floor has new by cables and new electrical wires sticking out from the walls and ceiling ele
Sep 24, 2019 · Penalty $625
Resolve - Class - 2
Failure to post or property post permit for work at premises noted conducted a walk through of building from teh first floor through the fifth floor i did not observed permit #122862376 posted at entrance of lo
Sep 24, 2019
Resolve - Class - 2
Failure to distribute or post notcie of safe construction bill of rights note at time of inspection conducted a walk through of teh building i did not observed a safe construction bill of rights posted within a
Sep 24, 2019 · Penalty $1,250
Resolve - Class - 1
Failure to provide of unobstructed exit passageway note upon inspection observed teh fifth floor stairwell leading to the roof being obstructed several metal studs and tracks as well as wood 2x4 both approximat
Sep 24, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to distribute or post notice of tenant protetcion plan.noted at the time of inspection conducted a wlak through of the building i did not observed a tenant protection plan posted in a building i did not
Sep 24, 2019 · Penalty $1,250
Resolve
Show 7 more ↓
- Class - 2
Failure to maintain adequate housekeeping per section requirments noted upon inspection observed excessive construction material in teh hallway of teh 2nd floor observed approximately 12 sheets of plywood 6 she
Sep 24, 2019
Resolve - Class - 2
28-317.3 failure to register cooling tower.rem:comply with code
Sep 21, 2015
Resolve - Class - 2
Electrical work w/o a permit throughout the ground floor hallway lightfixtures. remedy: obtain permit.
Aug 2, 2012 · Penalty $400
Resolve - Class - 1
Use of supported scaffold without a scaffold user certificate. worker on supported scaffold attaching blue tarp has no 4hr user cert. rem:discontinue activity or obtain a supported scaffold user cert. stop work
Mar 21, 2012 · Penalty $1,600
Resolve - Class - 2
Work does not conform to approved construction documents &/or approvedamendments. blue tarp attached to supported scaffold not on approved plan. rem:conform to approved documents or amendments stop work order
Mar 21, 2012
Resolve - Class - 2
Work w/o a permit. work noted: gutted 1st fl store,removed of walls,piles of construction debris stored throughout. sections of fire rated ceiling missing. remedy: stop all work.( ) removal of debris obt
Mar 19, 2012 · Penalty $800
Resolve - Class - 2
Work does not conform to approved plans job #110454268. non-conformingwork noted: removal of section of dumbwaiter shaft at 3rd flr apt #5 remains. bathroom layout in apt 5 is contrary to plans. also removal
Feb 6, 2012
Resolve
Complaints
- Heat/hot water
Apartment only
Oct 23, 2026 · Apt 5
Open - Heat/hot water
Entire building
Oct 23, 2026 · Apt BLDG
Open - Flooring/stairs
Floor
Aug 26, 2026 · Apt 5
Close - Paint/plaster
Wall
Aug 26, 2026 · Apt 5
Close - Unsanitary condition
Mold
Aug 26, 2026 · Apt 5
Close - Water leak
Slow leak
Aug 26, 2026 · Apt 5
Close - Plumbing
Bathtub/shower
Aug 26, 2026 · Apt 5
Close - Paint/plaster
Wall
Aug 26, 2026 · Apt 5
Close - Unsanitary condition
Pests
Aug 26, 2026 · Apt 5
Close - Safety
Smoke detector
Aug 26, 2026 · Apt 5
Close
Show 40 more ↓
- Paint/plaster
Wall
Aug 13, 2026 · Apt 5
Close - Paint/plaster
Wall
Jul 6, 2026 · Apt 5
Close - Heat/hot water
Apartment only
Feb 9, 2026 · Apt 5
Close - Heat/hot water
Apartment only
Jan 30, 2026 · Apt 5
Close - Heat/hot water
Apartment only
Jan 28, 2026 · Apt 5
Close - Heat/hot water
Entire building
Jan 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 2, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 2, 2026 · Apt 2
Close - Safety
Window guard broken/missing
Mar 17, 2025 · Apt BLDG
Close - Safety
Window guard broken/missing
Jan 30, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 24, 2025 · Apt 10
Close - Heat/hot water
Entire building
Jan 23, 2025 · Apt 5
Close - Heat/hot water
Apartment only
Jan 23, 2025 · Apt 10
Close - Heat/hot water
Apartment only
Dec 5, 2024 · Apt 5
Close - Heat/hot water
Entire building
Dec 2, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 1, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 22, 2024 · Apt BLDG
Close - Flooring/stairs
Floor
Nov 4, 2024 · Apt APT10
Close - Unsanitary condition
Mold
Nov 4, 2024 · Apt APT10
Close - Paint/plaster
Ceiling
Nov 4, 2024 · Apt APT10
Close - Paint/plaster
Wall
Nov 4, 2024 · Apt APT10
Close - Flooring/stairs
Floor
Nov 4, 2024 · Apt APT10
Close - Paint/plaster
Wall
Nov 4, 2024 · Apt APT10
Close - Heat/hot water
Entire building
Jan 18, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 16, 2024 · Apt 6
Close - Electric
Wiring
Aug 15, 2023 · Apt 5
Close - Heat/hot water
Entire building
Mar 21, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 20, 2023 · Apt BLDG
Close - Electric
Power outage
Mar 20, 2023 · Apt 3
Close - Heat/hot water
Apartment only
Mar 20, 2023 · Apt 5
Close - Paint/plaster
Ceiling
Mar 1, 2023 · Apt 3
Close - Paint/plaster
Wall
Mar 1, 2023 · Apt 3
Close - Electric
Outlet/switch
Mar 1, 2023 · Apt 3
Close - Unsanitary condition
Pests
Feb 16, 2023 · Apt 5
Close - Unsanitary condition
Pests
Feb 16, 2023 · Apt 5
Close - Plumbing
Radiator
Feb 16, 2023 · Apt 5
Close - Plumbing
Radiator
Feb 16, 2023 · Apt 5
Close - Safety
Smoke detector
Feb 16, 2023 · Apt 5
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1920
- Floors
- 5
- Residential units
- 28
- Building area
- 31,814 ft²
- Lot area
- 8,100 ft²
- Zoning
- R7A
- Community board
- 109
- Council district
- 7
- Block / lot
- 1966 / 59
- Assessed value
- $944,550
- Landmark / historic district
- No
HPD registration #113289, last renewed Sep 17, 2025.
Questions about 421 West 125 Street
Who owns 421 West 125 Street?
The owner of record in NYC Department of City Planning PLUTO data is Eljamar Rlty Corp.
Does 421 West 125 Street have violations?
Yes. NYC HPD has recorded 325 housing violations at this property.
Is 421 West 125 Street rent stabilized?
NYC Department of Finance tax bills listed 15 rent-stabilized units here in 2024 (about 54% of its 28 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 421 West 125 Street built?
City records list 1920 as the year it was built.
How many apartments are in 421 West 125 Street?
It has 28 residential units and 29 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.
