2254 Adam C Powell Blvd
Manhattan, NY 10027BBL 1-01938-0034Map
Owner of record: Hp Acp Housing Development Fund
2254 Adam C Powell Blvd is a walk-up apartment building built in 1910 in Manhattan, 10027. It has 9 residential units across 5 floors. The owner of record is Hp Acp Housing Development Fund. HPD has recorded 306 housing violations here, most recently on August 25, 2026. 8 of the 50 most recent violations are still open. City tax records listed 9 rent-stabilized apartments here in 2024.
- HPD violations
- 306
- DOB violations
- 8
- ECB violations
- 2
- HPD complaints
- 416
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 306
- BHazardous
Properly secure the loose hand rail at south wall at public hall stairs, 1st story
Aug 25, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west
Aug 25, 2026 · Apt 1R
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 2s, 2nd story, 1st apartment from east at south
Aug 25, 2026 · Apt 2S
Open — Civ14 mailed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2s, 2nd story, 1st apartment from east at south
Aug 25, 2026 · Apt 2S
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Aug 25, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective ventilation system in the bathroom located at apt 2s, 2nd story, 1st apartment from east at south
Aug 8, 2026 · Apt 2S
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 2s, 2nd story, 1st apartment from east at south
Aug 8, 2026 · Apt 2S
Open — Invalid certification - BHazardous
Properly repair or replace the broken or defective bell buzzer system from building front to north wall private hallway in the entrance located at apt 2s, 2nd story, 1st apartment from east at south
Aug 8, 2026 · Apt 2S
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective ventilation system at west wall in the bathroom located at apt 4n, 4th story, 1st apartment from west at north
Aug 1, 2026 · Apt 4N
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective door in the 5th room from east located at apt 4s, 4th story, 1st apartment from east at south
Apr 9, 2026 · Apt 4S
Closed — Violation closed
Show 40 more ↓
- ANon-hazardous
Repair the leaky and/or defective faucets at bath tub in the bathroom located at apt 4s, 4th story, 1st apartment from east at south
Apr 9, 2026 · Apt 4S
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4s, 4th story, 1st apartment from east at south
Apr 9, 2026 · Apt 4S
Closed — Violation closed - ANon-hazardous
Properly repair or replace the broken or defective closet door at east wall in the 5th room from east located at apt 4s, 4th story, 1st apartment from east at south
Apr 9, 2026 · Apt 4S
Closed — Violation closed - ANon-hazardous
Properly repair or replace the broken or defective door knob in the 5th room from east located at apt 4s, 4th story, 1st apartment from east at south
Apr 9, 2026 · Apt 4S
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4s, 4th story, 1st apartment from east at south
Mar 9, 2026 · Apt 4S
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4s, 4th story, 1st apartment from east at south
Mar 9, 2026 · Apt 4S
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the private hallway located at apt 4s, 4th story, 1st apartment from east at south
Mar 9, 2026 · Apt 4S
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the bathroom located at apt 4s, 4th story, 1st apartment from east at south
Mar 9, 2026 · Apt 4S
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4s, 4th story, 1st apartment from east at south
Mar 9, 2026 · Apt 4S
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective glass pane at door at west wall at vestibule , 1st story
Feb 28, 2026
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4s, 4th story, 1st apartment from east at south
Feb 28, 2026 · Apt 4S
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4s, 4th story, 1st apartment from east at south
Feb 28, 2026 · Apt 4S
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the bathroom located at apt 4s, 4th story, 1st apartment from east at south
Feb 28, 2026 · Apt 4S
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the private hallway located at apt 4s, 4th story, 1st apartment from east at south
Feb 28, 2026 · Apt 4S
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 4s, 4th story, 1st apartment from east at south
Feb 28, 2026 · Apt 4S
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective glass at vestibule door , 1st story
Oct 5, 2025
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and all walls in the bathroom located at apt 4s, 4th story, 1st apartment from south at west
Oct 5, 2025 · Apt 4S
Closed — Violation dismissed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling and east wall in the bathroom located at apt 4s, 4th story, 1st apartment from south at west
Oct 5, 2025 · Apt 4S
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective shower valve at shower in the bathroom located at apt 4s, 4th story, 1st apartment from south at west
Oct 5, 2025 · Apt 4S
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective bell, intercom and return buzzer at east wall in the kitchen located at apt 4s, 4th story, 1st apartment from south at west
Oct 5, 2025 · Apt 4S
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective glass pane at vestibule door at public hall, 1st story
Oct 1, 2025
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and north wall in the private hallway located at apt 4s, 4th story, 1st apartment from east at south
Sep 15, 2025 · Apt 4S
Closed — Violation dismissed - CImmediately hazardous
Properly secure the loose glass pane at vestibule door , 1st story
Sep 15, 2025
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the private hallway located at apt 4s, 4th story, 1st apartment from east at south
Sep 15, 2025 · Apt 4S
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east, the private hallway , the 4th room from east, the 5th room from east located at apt 2n, 2nd story, 1st apartment from west at north
Aug 19, 2025 · Apt 2N
Closed — Violation closed - BHazardous
Properly secure the loose guard rail at stairs at public hall, 2nd story
Aug 19, 2025
Closed — Violation dismissed - BHazardous
Properly secure the loose handrail at south at public hall stairs, 1st story
Aug 19, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish at bathtub in the bathroom located at apt 2n, 2nd story, 1st apartment from west at north
Aug 19, 2025 · Apt 2N
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective intercommunication system from building entrance to panel at south wall in the private hallway located at apt 2n, 2nd story, 1st apartment from west at north
Aug 19, 2025 · Apt 2N
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 2n, 2nd story, 1st apartment from west at north
Aug 19, 2025 · Apt 2N
Closed — Violation dismissed - BHazardous
Replace with new the missing baseboard radiator cover at east in the 1st room from east located at apt 2n, 2nd story, 1st apartment from west at north
Aug 19, 2025 · Apt 2N
Closed — Violation closed - BHazardous
Provide handrail at front areaway, 1st story
Aug 10, 2025
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west
Aug 10, 2025 · Apt 1R
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west
Aug 10, 2025 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west
Aug 10, 2025 · Apt 1R
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in waste line at washbasin in the bathroom located at apt 5n, 5th story, 1st apartment from west at north
Jul 14, 2025 · Apt 5N
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood subfloor in the kitchen located at apt 5n, 5th story, 1st apartment from west at north
Jul 14, 2025 · Apt 5N
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door in the entrance located at apt 1r, 1st story, 1st apartment from south at west
Jul 14, 2025 · Apt 1R
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective vinyl tile floor in the kitchen located at apt 5n, 5th story, 1st apartment from west at north
Jul 14, 2025 · Apt 5N
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5n, 5th story, 1st apartment from west at north
Jul 14, 2025 · Apt 5N
Closed — Violation dismissed
DOB building violations · 8
- Immediate emergency anythingoptional
Remedy: seal all fire damaged openings to safeguard.the public and property and prevent.unauthorized entry
Oct 10, 2025
Dob violation - dismissed - Construction other optional
Structure rendered non-compliant. at time of inspection responding to a fire observed damaged walls, broken windows, removed fire stoppage throughout building, removed door to roof and open skylight leaving building exposed to all elements. also observed excessive water damage and damaged ceilings at 1fl commercial property.
Oct 9, 2025
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Electric signs none
Es-electric signs none
Jul 27, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 2
- Class - 1
Failure to provide unobstructed exit passageway. at time of inspection, observed tents erected in the rear courtyard at exposure #3 creating an obstruction and limiting fire escape egress. blocked/obstructed eg
Jul 22, 2020 · Penalty $1,250
Resolve - Class - 1
Occupancy contrary to that allowed by the certificate of occupancy or buildings department records. at time of inspection, observed recreational use of rear courtyard at exposure #3, contrary to the c of o on f
Jul 22, 2020 · Penalty $2,500
Resolve
Complaints
- Heat/hot water
Entire building
Aug 28, 2026 · Apt 4N
Close - Heat/hot water
Entire building
Aug 27, 2026 · Apt BLDG
Close - Electric
Power outage
Aug 24, 2026 · Apt BLDG
Close - Safety
Window guard broken/missing
Jul 24, 2026 · Apt 2S
Close - Plumbing
Bathtub/shower
Jul 24, 2026 · Apt 2S
Close - General
Bell/buzzer/intercom
Jul 24, 2026 · Apt 2S
Close - General
Ventilation system
Jul 24, 2026 · Apt 2S
Close - Flooring/stairs
Floor
Jul 24, 2026 · Apt 2S
Close - General
Ventilation system
Jul 10, 2026 · Apt 4N
Close - Heat/hot water
Apartment only
Mar 8, 2026 · Apt 4S
Close
Show 40 more ↓
- Door/window
Door
Mar 8, 2026 · Apt 4S
Close - General
Ventilation system
Mar 8, 2026 · Apt 4S
Close - Flooring/stairs
Floor
Mar 8, 2026 · Apt 4S
Close - Door/window
Door
Feb 28, 2026 · Apt 3S
Open - Door/window
Door frame
Feb 28, 2026 · Apt 3S
Close - Door/window
Door
Feb 28, 2026 · Apt 3S
Close - Paint/plaster
Ceiling
Feb 11, 2026 · Apt 4S
Close - Plumbing
Bathtub/shower
Feb 11, 2026 · Apt 4S
Close - Door/window
Door
Feb 11, 2026 · Apt 4S
Close - Flooring/stairs
Floor
Feb 11, 2026 · Apt 4S
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt 5N
Close - Unsanitary condition
Pests
Feb 6, 2026 · Apt 4N
Close - Heat/hot water
Apartment only
Feb 6, 2026 · Apt 4N
Close - Door/window
Door
Oct 2, 2025 · Apt 4S
Close - Door/window
Window pane
Oct 2, 2025 · Apt 4S
Close - General
Bell/buzzer/intercom
Oct 2, 2025 · Apt 4S
Close - General
Bell/buzzer/intercom
Aug 31, 2025 · Apt 4S
Close - Door/window
Door frame
Aug 31, 2025 · Apt 4S
Close - Door/window
Window pane
Aug 30, 2025 · Apt 2N
Close - Plumbing
Radiator
Aug 13, 2025 · Apt 2N
Close - Paint/plaster
Wall
Aug 13, 2025 · Apt 2N
Close - General
Bell/buzzer/intercom
Aug 6, 2025 · Apt 4S
Close - Safety
Carbon monoxide detector
Jun 4, 2025 · Apt 5S
Close - Safety
Smoke detector
Jun 4, 2025 · Apt 5S
Close - Unsanitary condition
Pests
Jun 4, 2025 · Apt 5S
Close - Door/window
Door
Jun 4, 2025 · Apt 5S
Close - Paint/plaster
Wall
Jun 4, 2025 · Apt 3S
Close - Unsanitary condition
Pests
Jun 4, 2025 · Apt 2N
Close - Safety
Fire escape
Jun 4, 2025 · Apt BLDG
Close - Door/window
Door
Jun 4, 2025 · Apt BLDG
Close - Door/window
Door frame
Jun 4, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jun 4, 2025 · Apt BLDG
Close - Flooring/stairs
Floor
Jun 4, 2025 · Apt BLDG
Close - Unsanitary condition
Mold
Jun 4, 2025 · Apt BLDG
Close - Unsanitary condition
Mold
Jun 4, 2025 · Apt BLDG
Close - Unsanitary condition
Mold
Jun 4, 2025 · Apt 5S
Close - Unsanitary condition
Pests
Jun 4, 2025 · Apt 5S
Close - Plumbing
Basin/sink
Jun 4, 2025 · Apt 4N
Close - Safety
Carbon monoxide detector
Jun 4, 2025 · Apt 4N
Close - Safety
Smoke detector
Jun 4, 2025 · Apt 4N
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1910
- Floors
- 5
- Residential units
- 9
- Building area
- 8,854 ft²
- Lot area
- 2,500 ft²
- Zoning
- R7-2
- Community board
- 110
- Council district
- 9
- Block / lot
- 1938 / 34
- Assessed value
- $400,050
- Landmark / historic district
- No
HPD registration #123524, last renewed Feb 2, 2026.
Questions about 2254 Adam C Powell Blvd
Who owns 2254 Adam C Powell Blvd?
The owner of record in NYC Department of City Planning PLUTO data is Hp Acp Housing Development Fund.
Does 2254 Adam C Powell Blvd have violations?
Yes. NYC HPD has recorded 306 housing violations at this property.
Is 2254 Adam C Powell Blvd rent stabilized?
NYC Department of Finance tax bills listed 9 rent-stabilized units here in 2024 (about 100% of its 9 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2254 Adam C Powell Blvd built?
City records list 1910 as the year it was built.
How many apartments are in 2254 Adam C Powell Blvd?
It has 9 residential units and 10 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.