2228 Adam C Powell Blvd
Manhattan, NY 10027BBL 1-01937-0031Map
Owner of record: Lenox Powell Housing Associates LLC
2228 Adam C Powell Blvd is a walk-up apartment building built in 1910 in Manhattan, 10027. It has 22 residential units across 6 floors. The owner of record is Lenox Powell Housing Associates LLC. HPD has recorded 135 housing violations here, most recently on April 29, 2026. 14 of the 50 most recent violations are still open. City tax records listed 22 rent-stabilized apartments here in 2024.
- HPD violations
- 135
- DOB violations
- 21
- ECB violations
- 10
- HPD complaints
- 228
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 135
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective lock and assembly in the entrance located at apt 3a, 3rd story, 1st apartment from west at north
Apr 2, 2026 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective wood door in the 1st room from east located at apt 3a, 3rd story, 1st apartment from west at north
Apr 2, 2026 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of 4th sprinkler cap from east painted shut at ceiling. at public hall, 1st story
Mar 11, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at hopper door at public hall, 1st story
Mar 11, 2026
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing safety caps/covers at electrical outlet at north wall at public hall, 1st story
Mar 11, 2026
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items at 4th story balcony, east stack at building front at 1st fire escape from north at west
Mar 11, 2026
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective concrete balcony slab at north wall building entrance
Mar 3, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door leading to south yard at cellar
Mar 3, 2026
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of couch blocking fire escape window gate in the 3rd room from east at south located at apt 3a, 3rd story, 1st apartment from west at north
Mar 3, 2026 · Apt 3A
Closed — Violation closed
Show 40 more ↓
- BHazardous
M/d law abate the nuisance consisting of couch blocking fire escape window gate in the 1st room from east at north located at apt 4c, 4th story, 1st apartment from east at south
Mar 3, 2026 · Apt 4C
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of electric motorcycle in the private hallway located at apt 6c, 6th story, 1st apartment from east at south
Mar 3, 2026 · Apt 6C
Open — First no access to re- inspect violation - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective fire door (hinges) at 1st public hall bulkhead from east
Mar 3, 2026
Closed — Violation closed - BHazardous
Provide adequate lighting at north and south at fire passage way
Mar 3, 2026
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of drop ladder extented to ground at fire escape at east
Mar 3, 2026
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of flower pots at 2nd fire escape from east, 3rd story
Mar 3, 2026
Closed — Violation closed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures electrical outlet at south wall in the 3rd room from east at north located at apt 5a, 5th story, 1st apartment from east at south
Aug 8, 2024 · Apt 5A
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures electrical outlet at north wall in the private hallway located at apt 5a, 5th story, 1st apartment from east at south
Aug 8, 2024 · Apt 5A
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures electrical outlets at east and west walls in the kitchen located at apt 5a, 5th story, 1st apartment from east at south
Aug 8, 2024 · Apt 5A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east and south walls in the 3rd room from east at south located at apt 5a, 5th story, 1st apartment from east at south
Aug 8, 2024 · Apt 5A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5a, 5th story, 1st apartment from east at south
Aug 8, 2024 · Apt 5A
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north wall in the private hallway located at apt 3a, 3rd story, 1st apartment from west at north
Jun 21, 2024 · Apt 3A
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the 1st room from north at west located at apt 3a, 3rd story, 1st apartment from west at north
Jun 21, 2024 · Apt 3A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective g.f.c.i outlet at east wall in the bathroom located at apt 3a, 3rd story, 1st apartment from west at north
Jun 21, 2024 · Apt 3A
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3a, 3rd story, 1st apartment from west at north
Jun 21, 2024 · Apt 3A
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3a, 3rd story, 1st apartment from west at north
Jun 21, 2024 · Apt 3A
Closed — Violation closed - ANon-hazardous
Properly repair or replace the broken or defective counter top at sink in the kitchen located at apt 3a, 3rd story, 1st apartment from west at north
Jun 21, 2024 · Apt 3A
Open — Not complied with - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electric wires at ceiling, at public hall, 3rd story
May 6, 2024
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective counter balance lower sash window intermediate landing, at public hall stairs, 5th story
May 6, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4c, 4th story, apartment at south
May 6, 2024 · Apt 4C
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at compactor hopper, at public hall, 5th story
May 6, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door leading to south court yard at public hall, 1st story
May 6, 2024
Closed — Violation closed - ANon-hazardous
Cleanse to the satisfaction of this department the hallway at public hall, 5th story
Jul 18, 2023
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the hallway on all six floors of building
Jul 18, 2023 · Apt BLDG
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective trash room at public hall, 1st story
Jul 18, 2023
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 15, 2023
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Sep 14, 2022 · Apt 1A
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). inoperative in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Sep 14, 2022 · Apt 1A
Open — Invalid certification - BHazardous
Repair or replace the smoke detector inoperative in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Sep 14, 2022 · Apt 1A
Open — Invalid certification - BHazardous
Replace with new the broken or defective ceramic tiles at floor in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Sep 14, 2022 · Apt 1A
Open — Invalid certification - BHazardous
Repair the broken or defective connection at drain pipe at washbasin in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Sep 14, 2022 · Apt 1A
Open — Invalid certification - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Sep 14, 2022 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... approximately 30 sq.ft. at east wall, west wall, south wall, and ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Sep 14, 2022 · Apt 1A
Open — Notice of issuance sent to tenant - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wires at north wall in the 3rd room from east at south located at apt 1a, 1st story, 1st apartment from west at north
Sep 14, 2022 · Apt 1A
Open — Invalid certification - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wires at north wall in the 3rd room from east at south located at apt 1a, 1st story, 1st apartment from west at north
Sep 14, 2022 · Apt 1A
Open — Invalid certification - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 1st room from east at south located at apt 6c, 6th story, 1st apartment from east at south
Jul 21, 2022 · Apt 6C
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective hopper door to trash chute at public hall, 3rd story
Jul 7, 2022
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceilings and walls in the entire apartment located at apt 4c, 4th story, 1st apartment from east at south
Jul 7, 2022 · Apt 4C
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective electrical outlet at north wall in the 1st room from east located at apt 4c, 4th story, 1st apartment from east at south
Jul 7, 2022 · Apt 4C
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective cabinet door to sink in the kitchen located at apt 3a, 3rd story, 1st apartment from west at north
Jul 7, 2022 · Apt 3A
Closed — Violation dismissed
DOB building violations · 21
- Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 9, 2017
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 30, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 2, 2015
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 29, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2010 inspection/test
Dec 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 19, 2011
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 21, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed
Show 11 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Unsafe buildings none
Ub-unsafe buildings none
Feb 27, 1996
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 13, 1994
Vp*-violation unserved ecb- dismissed
ECB violations · 10
- Class - 3
Safe valve leaking and need to put drain pipe to ground.
Jan 27, 2022 · Penalty $500
Active - Class - 1
Door restrictor is not working. cease use. repair/adjust for proper operation. re-inspection is required. cat1 tag in elevator machine room expired. perform cat1 test and provide cat1 tag. found one fuse used j
Jun 10, 2021 · Penalty $1,280
Resolve - Class - 1
(cease use)05.a.10,39.o.02,59.i.10,41.m.07,70.o.02,68.b.07: (05,a,10)cease use item.door zone restrictor has been tampered with/disabled and rendered inoperative this is a safety device to ensure elevator passa
Nov 21, 2018 · Penalty $3,125
Resolve - Class - 2
Failure to maintain bldg in code compliant manner. at the time of inspection it was observed that ceiling under filre escape at entry level was in the state of disrepair was open to the element. remedy: repair
Jun 1, 2017 · Penalty $250
Resolve - Class - 1
Failure to maintain building in code compliant manner. noted: at frontfacade,exposure 1.second story,fire escape balcony-underneath cover ing is cracked and dislodging. rem:repair and/or replace make safe.
Jun 29, 2016 · Penalty $1,000
Resolve - Class - 1
Cu-01x10; 10d06,15m07,17d06,39o02,39m07,40#07,70o02. 01x-stops switch inoperative repair call (212)393-2531 dob to lift cease use. 17d-0p 4th flr, lobby, basement., secure. 10d-play in sill secure; 39m-top of
Oct 5, 2015 · Penalty $1,000
Resolve - Class - 1
01l10,67l10,05l10,08j01. cease use item #01 only. stop switch #67- phone. #08- flr stops. #05- zone restriction.
Oct 28, 2013 · Penalty $1,000
Resolve - Non-hazardous
No tenant saftey plan (2)interior demolation of fire rated walls.ceiling and interior partions (3)suspended ceilings (4)new bathroom & kitcens location: apartements 1,14,18,19,20,entire remedy:(a)stop all work.
Mar 25, 1992
Resolve - Hazardous
Failure to maintain. noted:1)the masonary fire rated enclosure in boiler room is broken,missing and defective creating a hazardous condition(2) fpsc door in boiler room is missing (3)steel decking and masonary
Mar 25, 1992
Resolve - Non-hazardous
Boilers
Jan 6, 1989 · Penalty $150
Resolve
Complaints
- Heat/hot water
Entire building
Dec 25, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 21, 2024 · Apt BLDG
Close - Paint/plaster
Wall
Oct 31, 2024 · Apt 6A
Close - Unsanitary condition
Garbage/recycling storage
Oct 12, 2024 · Apt BLDG
Close - Paint/plaster
Wall
Sep 19, 2024 · Apt 4C
Close - Water leak
Damp spot
Jun 4, 2024 · Apt 5A
Close - Heat/hot water
Apartment only
Jan 22, 2024 · Apt 5A
Close - Heat/hot water
Entire building
Jul 16, 2023 · Apt 5A
Close - Unsanitary condition
Garbage/recycling storage
Jul 6, 2023 · Apt 5A
Close - Electric
Lighting
Jul 6, 2023 · Apt 5A
Close
Show 40 more ↓
- Door/window
Window pane
Oct 24, 2022 · Apt 5A
Close - Elevator
Maintenance
Oct 24, 2022 · Apt 5A
Close - Electric
No lighting
Oct 24, 2022 · Apt 5A
Close - Paint/plaster
Wall
Oct 24, 2022 · Apt 5A
Close - Paint/plaster
Wall
Oct 24, 2022 · Apt 5A
Close - Paint/plaster
Wall
Oct 20, 2022 · Apt 5A
Close - Elevator
Maintenance
Oct 20, 2022 · Apt 5A
Close - Flooring/stairs
Floor
Sep 5, 2022 · Apt 1A
Close - Electric
Wiring
Sep 5, 2022 · Apt 1A
Close - Appliance
Electric/gas range
Sep 5, 2022 · Apt 1A
Close - Appliance
Electric/gas range
Sep 5, 2022 · Apt 1A
Close - Appliance
Electric/gas range
Sep 5, 2022 · Apt 1A
Close - Unsanitary condition
Mold
Sep 5, 2022 · Apt 1A
Close - Plumbing
Basin/sink
Sep 5, 2022 · Apt 1A
Close - Plumbing
Toilet
Sep 5, 2022 · Apt 1A
Close - Flooring/stairs
Floor
Sep 5, 2022 · Apt 1A
Close - Electric
No lighting
Sep 5, 2022 · Apt 1A
Close - Unsanitary condition
Garbage/recycling storage
Aug 30, 2022 · Apt 5A
Close - General
Janitor/super
Aug 30, 2022 · Apt 5A
Close - General
Signage missing
Aug 30, 2022 · Apt 5A
Close - General
Janitor/super
Aug 22, 2022 · Apt 5A
Close - Safety
Fire escape
Jul 22, 2022 · Apt BLDG
Close - Unsanitary condition
Mold
Jun 21, 2022 · Apt 5A
Close - Door/window
Door
May 6, 2022 · Apt 5A
Close - Door/window
Window frame
May 6, 2022 · Apt 5A
Close - Flooring/stairs
Floor
May 6, 2022 · Apt 5A
Close - Heat/hot water
Entire building
Mar 31, 2022 · Apt 5A
Close - Heat/hot water
Apartment only
Mar 30, 2022 · Apt 6A
Close - Heat/hot water
Apartment only
Mar 30, 2022 · Apt 6B
Close - Heat/hot water
Entire building
Mar 30, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 29, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 28, 2022 · Apt BLDG
Close - Elevator
Maintenance
Mar 24, 2022 · Apt 5A
Close - Unsanitary condition
Garbage/recycling storage
Mar 24, 2022 · Apt 5A
Close - Heat/hot water
Entire building
Mar 24, 2022 · Apt 5A
Close - Heat/hot water
Apartment only
Jan 20, 2022 · Apt 6B
Close - Unsanitary condition
Pests
Jan 12, 2022 · Apt 4C
Close - Heat/hot water
Apartment only
Jan 12, 2022 · Apt 6A
Close - Heat/hot water
Entire building
Jan 11, 2022 · Apt BLDG
Close - Plumbing
Water supply
Jan 7, 2022 · Apt 6B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C4)
- Year built
- 1910
- Floors
- 6
- Residential units
- 22
- Building area
- 20,462 ft²
- Lot area
- 5,000 ft²
- Zoning
- R7-2
- Community board
- 110
- Council district
- 9
- Block / lot
- 1937 / 31
- Assessed value
- $1,319,850
- Landmark / historic district
- No
HPD registration #120722, last renewed Oct 8, 2025.
Questions about 2228 Adam C Powell Blvd
Who owns 2228 Adam C Powell Blvd?
The owner of record in NYC Department of City Planning PLUTO data is Lenox Powell Housing Associates LLC.
Does 2228 Adam C Powell Blvd have violations?
Yes. NYC HPD has recorded 135 housing violations at this property.
Is 2228 Adam C Powell Blvd rent stabilized?
NYC Department of Finance tax bills listed 22 rent-stabilized units here in 2024 (about 100% of its 22 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2228 Adam C Powell Blvd built?
City records list 1910 as the year it was built.
How many apartments are in 2228 Adam C Powell Blvd?
It has 22 residential units and 24 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.