225 West 123 Street
Manhattan, NY 10027BBL 1-01929-0017Map
Owner of record: Adc/Ennis Francis II Housing Dev Fund Co INC.
225 West 123 Street is an elevator apartment building built in 2012 in Manhattan, 10027. It has 60 residential units across 8 floors. The owner of record is Adc/Ennis Francis II Housing Dev Fund Co INC.. HPD has recorded 356 housing violations here, most recently on August 17, 2026. 10 of the 50 most recent violations are still open. City tax records listed 60 rent-stabilized apartments here in 2024.
- HPD violations
- 356
- DOB violations
- 11
- ECB violations
- 28
- HPD complaints
- 610
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 356
- BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sqft at ceiling and walls in the bathroom located at apt 6a, 6th story, 1st apartment from west at north
Aug 17, 2026 · Apt 6A
Open — Violation will be reinspected - BHazardous
Properly repair with similar material the broken or defective wood base cabinet at south wall in the kitchen located at apt 6a, 6th story, 1st apartment from west at north
Aug 17, 2026 · Apt 6A
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6a, 6th story, 1st apartment from west at north
Aug 17, 2026 · Apt 6A
Open — Nov certified on time - ANon-hazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 6a, 6th story, 1st apartment from west at north
Aug 17, 2026 · Apt 6A
Open — Civ14 mailed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 6g, 6th story, 3rd apartment from east at south
May 26, 2026 · Apt 6G
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 6g, 6th story, 3rd apartment from east at south
May 26, 2026 · Apt 6G
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 6g, 6th story, 3rd apartment from east at south
May 26, 2026 · Apt 6G
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at east fire door at public hall, 2nd story
May 19, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective intercomm connection from entrance door to building. to intercomm panel at north wall in the foyer located at apt 6g, 6th story, 4th apartment from east at south
May 9, 2026 · Apt 6G
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical outlets at north and south walls. in the kitchen located at apt 6g, 6th story, 4th apartment from east at south
May 9, 2026 · Apt 6G
Open — Nov sent out
Show 40 more ↓
- BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the loose garbage at 1st compactor closet from north, 1st story
Apr 10, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at east fire door at public hall, 2nd story
Apr 6, 2026
Closed — Violation closed - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Mar 31, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective door and drawer at base cabinet at south wall in the kitchen located at apt 1c, 1st story, 2nd apartment from west at north
Mar 17, 2026 · Apt 1C
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at cieling at public hall, 1st story
Jan 30, 2026
Closed — Violation closed - ANon-hazardous
Replace with new the missing acoustic ceiling tiles at ceiling at public hall, 1st story
Jan 30, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story
Jan 30, 2026
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story
Jan 30, 2026
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of at ceiling at public hall, 1st story
Jan 29, 2026
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story
Jan 29, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story
Jan 29, 2026
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak fire retardant material at ceiling at public hall, 1st story
Jan 29, 2026
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Jan 29, 2026
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st bathroom from east located at apt 2d, 2nd story, 4th apartment from west at north
Jan 29, 2026 · Apt 2D
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 6g, 6th story, 3rd apartment from east at south
Jan 29, 2026 · Apt 6G
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2d, 2nd story, 4th apartment from west at north
Jan 29, 2026 · Apt 2D
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2d, 2nd story, 4th apartment from west at north
Jan 29, 2026 · Apt 2D
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st bathroom from east located at apt 2d, 2nd story, 4th apartment from west at north
Jan 29, 2026 · Apt 2D
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Jan 27, 2026
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 8g, 8th story, 2nd apartment from east at south
Jan 27, 2026 · Apt 8G
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 2d, 2nd story, 4th apartment from west at north
Jan 27, 2026 · Apt 2D
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak above ceiling in the bathroom located at apt 2d, 2nd story, 4th apartment from west at north
Jan 27, 2026 · Apt 2D
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4d, 4th story, 4th apartment from west at north
Dec 11, 2025 · Apt 4D
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Dec 11, 2025
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 1h , 1st story, 3rd apartment from east at south
Dec 11, 2025 · Apt 1H
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 4d, 4th story, 4th apartment from west at north
Dec 11, 2025 · Apt 4D
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective sink base cabinet at south wall in the kitchen located at apt 4d, 4th story, 4th apartment from west at north
Dec 11, 2025 · Apt 4D
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 7th story
Oct 23, 2025
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 7th story
Oct 23, 2025
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at public hall, 7th story
Oct 22, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at west fire door at public hall, 1st story
Oct 22, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 7th story
Oct 22, 2025
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 2d, 2nd story, 4th apartment from west at north
Oct 16, 2025 · Apt 2D
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2d, 2nd story, 4th apartment from west at north
Oct 16, 2025 · Apt 2D
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective lower sink cabinet at south wall. in the kitchen located at apt 1c, 1st story, 2nd apartment from west at north
Sep 4, 2025 · Apt 1C
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective door and drawer at lower cabinet on north wall in the kitchen located at apt 1c, 1st story, 2nd apartment from west at north
Sep 4, 2025 · Apt 1C
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east located at apt 1c, 1st story, 2nd apartment from west at north
Sep 4, 2025 · Apt 1C
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish at bathtub in the bathroom located at apt 1c, 1st story, 2nd apartment from west at north
Sep 4, 2025 · Apt 1C
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entire apartment located at apt 6g, 6th story, 3rd apartment from east at south
Jun 6, 2025 · Apt 6G
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 2nd story, 1st apartment from west at north
May 30, 2025 · Apt 2A
Closed — Violation closed
DOB building violations · 11
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 12, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 12, 2018
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 15, 2017
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - dismissed
Show 1 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 3, 2014
Dob violation - dismissed
ECB violations · 28
- Class - 1
Failure to maintain building in code compliant manner. service elevator equipment as per bc3001.2 & 27-987. upon inspection, the device is found to be out of service, creating a hazardous condition per 1rcny 11
Nov 12, 2025 · Penalty $6,250
Active - Class - 1
Cease use item: brake monitor switch cam broken. . remedy: to restore service, email the d.o.b. [email protected]. for a reinspection.class 2 items: in-car communication inoperative. check top of car inspec
Mar 25, 2025 · Penalty $6,250
Active - Class - 2
Class 2: phone inoperative connect service to 24 hr emergency operator. car door misaligned adjust to meet clearances. clean garbage from pit. no access to motor room.
Jun 24, 2024 · Penalty $625
Active - Class - 2
Class 2: phone inoperative connect service to 24 hr emergency operator. car door misaligned causing scrapping adjust to remove. counterweight rollers squaking repair to remove noise. cellar hall button has "doo
Jun 24, 2024 · Penalty $625
Active - Class - 2
Failure to submit an acceptable required cycle 9a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#917281.rem:submit acceptable required t
Dec 9, 2022 · Penalty $1,250
Active - Class - 2
Failure to maintain building exterior walls/facade & appurtenances.observed vertical crack on 5th floor exp #1 southeast elevation.remedy:maintain building exterior walls facade & appurtenances.repair defects &
Nov 5, 2022 · Penalty $6,250
Active - Class - 2
Failure to comply with commissioner's order contained in summons/violation #35250200y issue on 2/15/18,& to file a cert. of correction pursuant to 28.201.1 &1rcny 102-01(d)(2).an acceptible cert. has not yet be
Dec 17, 2018 · Penalty $1,250
Resolve - Class - 3
Failure to maintain bldg in code compliant manner noted: in apt #8c observed the ventilation system/exhaust system in bathroom not working. rmdy: repair and replace maintain the ventilation system.
Feb 15, 2018 · Penalty $200
Active - Class - 2
2x10)2 way outside communication inoperative.
Dec 1, 2017 · Penalty $1,250
Resolve - Class - 2
2x10)2 way outside communication inoperative.
Dec 1, 2017 · Penalty $1,250
Resolve
Show 18 more ↓
- Class - 1
Cu-06n09,39m07,41i10. 06n09-tape on station any roller to make up gate switch. 39m-bulb missing for car topl 41i-repair lock.
Aug 8, 2017 · Penalty $1,000
Resolve - Class - 2
Bc3301.7 design drawing required by the provision of chapter 33 of nycbldg code. noted:at time of inspection of 8sty new building under con-struction has electrical hoist hook up to supported pipe scaffold at
Sep 24, 2014
Resolve - Class - 2
Failure to safeguard all persons and property affected by constructionoperations. noted: at time of inspection of 8story new bldg under con struction has open live electrical breaker boxes with floor ()wires
Sep 24, 2014 · Penalty $1,200
Resolve - Class - 1
28-104.2.fail to provide approved new bldg plans @job site @time of insp.no workers who were asked could provide required approved plans fornb11008634.full swo-issued pursuant to 28-207.2 & posted @site.note:un
Sep 13, 2014 · Penalty $1,600
Resolve - Class - 2
Failure to safeguard all person during construction operations. numerous rebars were observed not capped at rear yard. rmdy: cap all rebars throughout entire site.
Sep 13, 2014 · Penalty $1,200
Resolve - Class - 2
Failure to maintain adequate housekeeping per sections requirement an excessive amount of debris material and garbage including buckets,ply wood,cmu's,stones for facade,gravel,scaffolding,bricks,ladders etc are
Sep 13, 2014
Resolve - Class - 2
3301.2 entrance gates in construction were not closed thus construction site was not completely enclosed leaving access to site to public. rmdy:keep construction fence gates closed at all times except when in
Sep 13, 2014
Resolve - Class - 2
3301.2 failure to safeguard all person/workers during construction operations.bucket were observed on top of untied down scaffolding planks at grade level exp1. rmdy: remove all material and/or equipment (tools
Sep 13, 2014
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirement. note: at the time of my inspection construction site excessive debris on flrs 4,5,6 and roof level makes it very unsafe for workers on site.
Mar 19, 2013 · Penalty $400
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements. noted: at flrs 8,7,6,5,4, construction debris has been piled in s/w room. at 3rd flr debris is piled at s/e room. no metal containers observed
Mar 12, 2013 · Penalty $400
Resolve - Class - 1
Failure to institute/maintain safety measures for temporary construction. noted: elevator shaft at flrs 8,7,6,5,4 and 3 are missing a toeboard. remedy: provide toeboards.
Mar 12, 2013 · Penalty $1,000
Resolve - Class - 2
Bc3301/7 design drawing required by the provision of chapter 33 of nycbldg code.noted:at new bldg under construction at roof level exposure1material hoist erected (electric) operated by generator has no design
Dec 31, 2012 · Penalty $400
Resolve - Class - 2
Sec. 3309.6;1814.3 failure to monitor adjoining structure for movementin all directions during excavation related activity. noted: upon inspection no montoring of cracks on rear of building new cracks at bottom
Jul 24, 2012 · Penalty $800
Resolve - Class - 2
Sec. 3309.4;27-1032 failure to(preserve)& protect adjoining structuresaffected by excavation activity. noted: upon inspection cracks at lower floors at exterior of building (rear) not monitored due to construct
Jul 24, 2012
Resolve - Class - 1
Bc3309.4 failure to safeguard public & adjoining & property during construction operations noted defects at adjacent property 237 w 123 st rear exposure #3 stress cracks at 1st 2nd & 3rd fl sheared bricks adjac
Jul 18, 2012 · Penalty $8,000
Resolve - Class - 2
Failure to safeguard all persons and property affected by constructionoperation. during inspection oxygen & acetylene tanks are found to be unbraced or stayed from movement also form work guardrails are missing
Apr 12, 2012 · Penalty $1,000
Resolve - Class - 1
Failure to provide required lot-line. construction fence (excavation) adequate construction fence is missing at exposures 2, 3 & 4. exp 3 has a pedestrian walk space where only netting is provided. remedy stop
Feb 24, 2012 · Penalty $1,600
Resolve - Class - 1
Failure to provide guard rails around open accessible sides of excavation. guard rails are missing at exp 2& 4 for excavation. remedy complyw/ violation.
Feb 24, 2012 · Penalty $1,600
Resolve
Complaints
- Water leak
Slow leak
Sep 26, 2026 · Apt 5D
Open - Plumbing
Basin/sink
Aug 13, 2026 · Apt 6A
Close - Unsanitary condition
Mold
Aug 13, 2026 · Apt 6A
Close - General
Cabinet
Aug 13, 2026 · Apt 6A
Close - Water leak
Slow leak
Jul 16, 2026 · Apt 5E
Close - General
Bell/buzzer/intercom
Jul 1, 2026 · Apt 8D
Close - Appliance
Refrigerator
Jun 5, 2026 · Apt 4D
Close - Safety
Fire escape
May 25, 2026 · Apt BLDG
Close - General
Bell/buzzer/intercom
May 25, 2026 · Apt 6G
Close - Unsanitary condition
Garbage/recycling storage
May 25, 2026 · Apt BLDG
Close
Show 40 more ↓
- General
Bell/buzzer/intercom
May 24, 2026 · Apt 6G
Close - Electric
Power outage
May 22, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
May 22, 2026 · Apt BLDG
Close - Safety
Fire escape
May 22, 2026 · Apt BLDG
Close - Paint/plaster
Ceiling
May 16, 2026 · Apt 6G
Close - General
Bell/buzzer/intercom
May 9, 2026 · Apt BUZZER
Close - Safety
Fire escape
May 9, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
May 9, 2026 · Apt BLDG
Close - Door/window
Door frame
May 6, 2026 · Apt 6G
Close - Water leak
Slow leak
May 6, 2026 · Apt 6G
Close - Water leak
Damp spot
May 6, 2026 · Apt 6G
Close - Water leak
Damp spot
May 6, 2026 · Apt 6G
Close - Door/window
Door
May 6, 2026 · Apt 6G
Close - Door/window
Door
May 6, 2026 · Apt 6G
Close - Electric
Outlet/switch
May 6, 2026 · Apt 6G
Close - Electric
Outlet/switch
May 6, 2026 · Apt 6G
Close - Electric
Outlet/switch
May 6, 2026 · Apt 6G
Close - Water leak
Damp spot
May 6, 2026 · Apt 6G
Close - Paint/plaster
Wall
May 6, 2026 · Apt 6G
Close - Paint/plaster
Ceiling
May 6, 2026 · Apt 6G
Close - General
Bell/buzzer/intercom
May 6, 2026 · Apt 6G
Close - General
Bell/buzzer/intercom
May 6, 2026 · Apt 6G
Close - Plumbing
Basin/sink
Apr 20, 2026 · Apt 3A
Close - Paint/plaster
Wall
Apr 4, 2026 · Apt 6G
Close - General
Bell/buzzer/intercom
Apr 4, 2026 · Apt 6G
Close - Unsanitary condition
Pests
Apr 4, 2026 · Apt 6G
Close - Door/window
Door
Apr 4, 2026 · Apt 6G
Close - General
Bell/buzzer/intercom
Apr 4, 2026 · Apt 6G
Close - General
Bell/buzzer/intercom
Apr 4, 2026 · Apt 6G
Close - Unsanitary condition
Garbage/recycling storage
Apr 4, 2026 · Apt 6G
Close - Door/window
Door
Apr 4, 2026 · Apt 6G
Close - Unsanitary condition
Mold
Apr 4, 2026 · Apt 6G
Close - Electric
Wiring
Mar 2, 2026 · Apt LOBBY
Close - Appliance
Electric/gas range
Feb 19, 2026 · Apt 5E
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Water leak
Heavy flow
Jan 29, 2026 · Apt 6G
Close - Heat/hot water
Entire building
Jan 29, 2026 · Apt BLDG
Close - Paint/plaster
Ceiling
Jan 29, 2026 · Apt 6G
Close - Electric
Wiring
Jan 29, 2026 · Apt 6G
Close - Heat/hot water
Entire building
Jan 28, 2026 · Apt 6G
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D3)
- Year built
- 2012
- Floors
- 8
- Residential units
- 60
- Building area
- 98,955 ft²
- Lot area
- 18,500 ft²
- Zoning
- R7A
- Community board
- 110
- Council district
- 9
- Block / lot
- 1929 / 17
- Assessed value
- $10,233,450
- Landmark / historic district
- No
HPD registration #143981, last renewed Aug 31, 2025.
Questions about 225 West 123 Street
Who owns 225 West 123 Street?
The owner of record in NYC Department of City Planning PLUTO data is Adc/Ennis Francis II Housing Dev Fund Co INC..
Does 225 West 123 Street have violations?
Yes. NYC HPD has recorded 356 housing violations at this property.
Is 225 West 123 Street rent stabilized?
NYC Department of Finance tax bills listed 60 rent-stabilized units here in 2024 (about 100% of its 60 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 225 West 123 Street built?
City records list 2012 as the year it was built.
How many apartments are in 225 West 123 Street?
It has 60 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.