2014 Adam C Powell Blvd
Manhattan, NY 10027BBL 1-01926-0033Map
Owner of record: Gloria Homes Apts. L.p.
2014 Adam C Powell Blvd is an elevator apartment building built in 1910 in Manhattan, 10027. It has 14 residential units across 5 floors. The owner of record is Gloria Homes Apts. L.p.. HPD has recorded 55 housing violations here, most recently on October 27, 2025. 14 of the 50 most recent violations are still open. City tax records listed 14 rent-stabilized apartments here in 2023.
- HPD violations
- 55
- DOB violations
- 10
- ECB violations
- 0
- HPD complaints
- 102
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 55
- BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq ft at ceiling in the bathroom located at apt 5b, 5th story, 1st apartment from west at north
Oct 27, 2025 · Apt 5B
Open — Defect letter issued - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Aug 30, 2025
Open — First no access to re- inspect violation - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 4, 2025
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of rodents , rats at front areaway
Mar 27, 2024
Open — First no access to re- inspect violation - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tiles at north wall of shower compartment in the bathroom located at apt 2a, 2nd story, 2nd apartment from west at north
May 2, 2023 · Apt 2A
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 15, 2023
Closed — Violation dismissed - ANon-hazardous
Repair leaky water closet flush pipe connection ... in the 2nd bathroom from east located at apt 3a, 3rd story, 2nd apartment from west at north
Mar 14, 2023 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3a, 3rd story, 2nd apartment from west at north
Mar 14, 2023 · Apt 3A
Open — Defect letter issued - BHazardous
Properly repair the broken or defective light fixture at ceiling in the 1st room from east located at apt 3a, 3rd story, 2nd apartment from west at north
Mar 14, 2023 · Apt 3A
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing frame at public hall, 1st story
Oct 20, 2022
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Replace with new the broken or defective glass pane at building entrance door
Oct 14, 2022
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5a, 5th story, 2nd apartment from south at west
Sep 9, 2022 · Apt 5A
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective wood base cabinet underneath the sink in the kitchen located at apt 5a, 5th story, 2nd apartment from south at west
Sep 9, 2022 · Apt 5A
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5a, 5th story, 2nd apartment from south at west
Sep 9, 2022 · Apt 5A
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5a, 5th story, 2nd apartment from west at north
Jul 28, 2022 · Apt 5A
Open — First no access to re- inspect violation - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3c, 3rd story, 1st apartment from north at east
Jul 28, 2022 · Apt 3C
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls in the entire apartment located at apt 5b, 5th story, 1st apartment from north at east
Jul 28, 2022 · Apt 5B
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 5b, 5th story, 1st apartment from north at east
Jul 28, 2022 · Apt 5B
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective door at closet at east wall in the foyer located at apt 5b, 5th story, 1st apartment from north at east
Jul 28, 2022 · Apt 5B
Closed — Violation closed - BHazardous
Properly repair the broken or defective light fixure at ceiling in the private hallway located at apt 5a, 5th story, 2nd apartment from west at north
Jul 28, 2022 · Apt 5A
Open — First no access to re- inspect violation - ANon-hazardous
Properly repair the broken or defective door and drawer at base cabinet in the kitchen located at apt 5a, 5th story, 2nd apartment from west at north
Jul 28, 2022 · Apt 5A
Open — First no access to re- inspect violation - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3c, 3rd story, 1st apartment from north at east
Jul 28, 2022 · Apt 3C
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at window sillls(3) in the entire apartment located at apt 5b, 5th story, 1st apartment from north at east
Jul 28, 2022 · Apt 5B
Closed — Violation closed - BHazardous
Properly repair the broken or defective ventilation system at west wall in the bathroom located at apt 5b, 5th story, 1st apartment from north at east
Jul 28, 2022 · Apt 5B
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 15, 2022
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice located at apt 5b, 5th story, 1st apartment from west at north
Aug 6, 2021 · Apt 5B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches located at apt 5b, 5th story, 1st apartment from west at north
Aug 6, 2021 · Apt 5B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective grout around bathtub tiles in the bathroom located at apt 5b, 5th story, 1st apartment from west at north
Aug 6, 2021 · Apt 5B
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 5b, 5th story, 1st apartment from west at north
Aug 6, 2021 · Apt 5B
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective mechanical ventelation system in the bathroom located at apt 5b, 5th story, 1st apartment from west at north
Aug 6, 2021 · Apt 5B
Closed — Violation dismissed - CImmediately hazardous
Properly repair the broken or defective lock at entrance door to the building , 1st story
Mar 29, 2021
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5a, 5th story, 2nd apartment from east at south
Dec 5, 2019 · Apt 5A
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5a, 5th story, 2nd apartment from east at south
Dec 5, 2019 · Apt 5A
Open — First no access to re- inspect violation - ANon-hazardous
Refit upper and lower window sashes in the bathroom located at apt 5a, 5th story, 2nd apartment from east at south
Dec 5, 2019 · Apt 5A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 1st room from north located at apt 5a, 5th story, 2nd apartment from west at north
Dec 4, 2019 · Apt 5A
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 1st room from north located at apt 5a, 5th story, 2nd apartment from west at north
Dec 4, 2019 · Apt 5A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall in the 1st room from north located at apt 5a, 5th story, 2nd apartment from west at north
Dec 4, 2019 · Apt 5A
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector that is defective located at apt 5a, 5th story, 2nd apartment from west at north
May 10, 2016 · Apt 5A
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). that is defective located at apt 5a, 5th story, 2nd apartment from west at north
May 10, 2016 · Apt 5A
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective mechanical stopper in bathtub in the 2nd bathroom located at apt 5a, 5th story, 2nd apartment from west at north
May 10, 2016 · Apt 5A
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over the ceiling in the private hallway located at apt 5a, 5th story, 2nd apartment from west at north
May 10, 2016 · Apt 5A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and the ceiling in the entire apartment located at apt 5a, 5th story, 2nd apartment from west at north
May 10, 2016 · Apt 5A
Open — First no access to re- inspect violation - BHazardous
M/d law abate the nuisance consisting of a key operated lockset at the door to the fire escape in the 6th room from east located at apt 1a, 1st story, 1st apartment from west at north
Apr 8, 2015 · Apt 1A
Closed — Violation dismissed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ..... in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Apr 8, 2015 · Apt 1A
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
Jun 29, 2013 · Apt 1A
Closed — Violation closed - BHazardous
Properly repair the broken or defective faucet, sink in the kitchen located at apt 5c, 5th story, 1st apartment from north at east
Apr 16, 2013 · Apt 5C
Closed — Violation closed - BHazardous
Properly repair the broken or defective light fixture at ceiling in the private hallway located at apt 5c, 5th story, 1st apartment from north at east
Apr 16, 2013 · Apt 5C
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls, ceiling and counter in the kitchen located at apt 1a, 1st story, 2nd apartment from west at north
Apr 4, 2013 · Apt 1A
Closed — Violation closed - BHazardous
Properly repair the broken or defective electrical outlets at east wall in the 1st room from east located at apt 1a, 1st story, 2nd apartment from west at north
Apr 4, 2013 · Apt 1A
Closed — Violation closed - BHazardous
Properly repair the broken or defective electrical outlets at west wall in the kitchen located at apt 1a, 1st story, 2nd apartment from west at north
Apr 4, 2013 · Apt 1A
Closed — Violation closed
DOB building violations · 10
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Electric
Power outage
Sep 1, 2026 · Apt 2A
Close - Electric
Power outage
Sep 1, 2026 · Apt 3B
Close - Electric
Power outage
Sep 1, 2026 · Apt 3A
Close - Electric
No lighting
Sep 1, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 3, 2026 · Apt 5B
Close - Appliance
Refrigerator
Feb 3, 2026 · Apt 5B
Close - Unsanitary condition
Garbage/recycling storage
Aug 24, 2025 · Apt BLDG
Close - Unsanitary condition
Mold
Aug 6, 2025 · Apt 2A
Close - Unsanitary condition
Garbage/recycling storage
Dec 26, 2023 · Apt 5B
Close - Unsanitary condition
Pests
Dec 26, 2023 · Apt 5B
Close
Show 40 more ↓
- Heat/hot water
Entire building
Dec 12, 2023 · Apt 5B
Close - Appliance
Refrigerator
Dec 12, 2023 · Apt 5B
Close - Heat/hot water
Apartment only
Nov 29, 2023 · Apt 5B
Close - Appliance
Refrigerator
Nov 29, 2023 · Apt 5B
Close - Appliance
Refrigerator
Nov 14, 2023 · Apt 5B
Close - General
Ventilation system
Mar 10, 2023 · Apt 3A
Close - Electric
No lighting
Mar 10, 2023 · Apt 3A
Close - Plumbing
Toilet
Mar 10, 2023 · Apt 3A
Close - Appliance
Electric/gas range
Mar 10, 2023 · Apt 3A
Close - Heat/hot water
Entire building
Oct 19, 2022 · Apt BLDG
Close - Unsanitary condition
Pests
Oct 13, 2022 · Apt 5A
Close - Paint/plaster
Wall
Oct 6, 2022 · Apt 5B
Close - Unsanitary condition
Mold
Oct 6, 2022 · Apt 5B
Close - Appliance
Electric/gas range
Oct 6, 2022 · Apt 5B
Close - General
Cabinet
Aug 12, 2022 · Apt 5A
Close - Plumbing
Toilet
Aug 12, 2022 · Apt 5A
Close - Unsanitary condition
Pests
Aug 12, 2022 · Apt 5A
Close - Unsanitary condition
Pests
Aug 12, 2022 · Apt 5A
Close - General
Ventilation system
Aug 10, 2022 · Apt 5B
Close - Appliance
Refrigerator
Aug 10, 2022 · Apt 5B
Close - Paint/plaster
Window/frame
Jun 7, 2022 · Apt 5B
Close - Paint/plaster
Wall
Jun 7, 2022 · Apt 5B
Close - Paint/plaster
Wall
Jun 7, 2022 · Apt 5B
Close - Unsanitary condition
Mold
Jun 7, 2022 · Apt 5B
Close - Paint/plaster
Window/frame
Jun 7, 2022 · Apt 5B
Close - Paint/plaster
Wall
Jun 7, 2022 · Apt 5B
Close - Unsanitary condition
Mold
Jun 7, 2022 · Apt 5B
Close - Heat/hot water
Entire building
Mar 4, 2022 · Apt 5B
Close - Electric
No lighting
Mar 4, 2022 · Apt 5B
Close - Electric
No lighting
Mar 4, 2022 · Apt 5B
Close - Heat/hot water
Apartment only
Mar 4, 2022 · Apt 5B
Close - Electric
No lighting
Mar 4, 2022 · Apt 5D
Close - Heat/hot water
Apartment only
Mar 4, 2022 · Apt 5D
Close - Unsanitary condition
Mold
Jul 26, 2021 · Apt 5B
Close - Appliance
Refrigerator
Jul 11, 2021 · Apt 5C
Close - Door/window
Door
Apr 8, 2021 · Apt 5B
Close - Door/window
Door
Apr 3, 2021 · Apt 5B
Close - General
Mailbox
Feb 18, 2021 · Apt 5B
Close - Door/window
Door
Feb 18, 2021 · Apt 5B
Close - Heat/hot water
Apartment only
Jan 30, 2021 · Apt 3A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 1910
- Floors
- 5
- Residential units
- 14
- Building area
- 22,810 ft²
- Lot area
- 5,178 ft²
- Zoning
- R7-2
- Community board
- 110
- Council district
- 9
- Block / lot
- 1926 / 33
- Assessed value
- $1,978,200
- Landmark / historic district
- No
HPD registration #117763, last renewed Oct 14, 2025.
Questions about 2014 Adam C Powell Blvd
Who owns 2014 Adam C Powell Blvd?
The owner of record in NYC Department of City Planning PLUTO data is Gloria Homes Apts. L.p..
Does 2014 Adam C Powell Blvd have violations?
Yes. NYC HPD has recorded 55 housing violations at this property.
Is 2014 Adam C Powell Blvd rent stabilized?
NYC Department of Finance tax bills listed 14 rent-stabilized units here in 2023 (about 100% of its 14 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2014 Adam C Powell Blvd built?
City records list 1910 as the year it was built.
How many apartments are in 2014 Adam C Powell Blvd?
It has 14 residential units and 17 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.