roofy

2014 Adam C Powell Blvd

Manhattan, NY 10027BBL 1-01926-0033Map

Owner of record: Gloria Homes Apts. L.p.

2014 Adam C Powell Blvd is an elevator apartment building built in 1910 in Manhattan, 10027. It has 14 residential units across 5 floors. The owner of record is Gloria Homes Apts. L.p.. HPD has recorded 55 housing violations here, most recently on October 27, 2025. 14 of the 50 most recent violations are still open. City tax records listed 14 rent-stabilized apartments here in 2023.

HPD violations
55
DOB violations
10
ECB violations
0
HPD complaints
102

What to know

Concern
7 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Oct 27, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2023
14
About 100% of the building's 14 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 55

  • B

    Trace and repair the source and abate the visible mold condition... greater than 10 sq ft at ceiling in the bathroom located at apt 5b, 5th story, 1st apartment from west at north

    Oct 27, 2025 · Apt 5B

    Open — Defect letter issued
  • B

    Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.

    Aug 30, 2025

    Open — First no access to re- inspect violation
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 4, 2025

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of rodents , rats at front areaway

    Mar 27, 2024

    Open — First no access to re- inspect violation
  • A

    Properly repair with similar material the broken or defective ceramic tiles at north wall of shower compartment in the bathroom located at apt 2a, 2nd story, 2nd apartment from west at north

    May 2, 2023 · Apt 2A

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 15, 2023

    Closed — Violation dismissed
  • A

    Repair leaky water closet flush pipe connection ... in the 2nd bathroom from east located at apt 3a, 3rd story, 2nd apartment from west at north

    Mar 14, 2023 · Apt 3A

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 3a, 3rd story, 2nd apartment from west at north

    Mar 14, 2023 · Apt 3A

    Open — Defect letter issued
  • B

    Properly repair the broken or defective light fixture at ceiling in the 1st room from east located at apt 3a, 3rd story, 2nd apartment from west at north

    Mar 14, 2023 · Apt 3A

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing frame at public hall, 1st story

    Oct 20, 2022

    Closed — Violation dismissed
Show 40 more ↓
  • C

    Replace with new the broken or defective glass pane at building entrance door

    Oct 14, 2022

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 5a, 5th story, 2nd apartment from south at west

    Sep 9, 2022 · Apt 5A

    Open — First no access to re- inspect violation
  • B

    Properly repair with similar material the broken or defective wood base cabinet underneath the sink in the kitchen located at apt 5a, 5th story, 2nd apartment from south at west

    Sep 9, 2022 · Apt 5A

    Open — First no access to re- inspect violation
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 5a, 5th story, 2nd apartment from south at west

    Sep 9, 2022 · Apt 5A

    Open — First no access to re- inspect violation
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 5a, 5th story, 2nd apartment from west at north

    Jul 28, 2022 · Apt 5A

    Open — First no access to re- inspect violation
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3c, 3rd story, 1st apartment from north at east

    Jul 28, 2022 · Apt 3C

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling and all walls in the entire apartment located at apt 5b, 5th story, 1st apartment from north at east

    Jul 28, 2022 · Apt 5B

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 5b, 5th story, 1st apartment from north at east

    Jul 28, 2022 · Apt 5B

    Closed — Violation closed
  • A

    Properly repair the broken or defective door at closet at east wall in the foyer located at apt 5b, 5th story, 1st apartment from north at east

    Jul 28, 2022 · Apt 5B

    Closed — Violation closed
  • B

    Properly repair the broken or defective light fixure at ceiling in the private hallway located at apt 5a, 5th story, 2nd apartment from west at north

    Jul 28, 2022 · Apt 5A

    Open — First no access to re- inspect violation
  • A

    Properly repair the broken or defective door and drawer at base cabinet in the kitchen located at apt 5a, 5th story, 2nd apartment from west at north

    Jul 28, 2022 · Apt 5A

    Open — First no access to re- inspect violation
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 3c, 3rd story, 1st apartment from north at east

    Jul 28, 2022 · Apt 3C

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at window sillls(3) in the entire apartment located at apt 5b, 5th story, 1st apartment from north at east

    Jul 28, 2022 · Apt 5B

    Closed — Violation closed
  • B

    Properly repair the broken or defective ventilation system at west wall in the bathroom located at apt 5b, 5th story, 1st apartment from north at east

    Jul 28, 2022 · Apt 5B

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 15, 2022

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice located at apt 5b, 5th story, 1st apartment from west at north

    Aug 6, 2021 · Apt 5B

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches located at apt 5b, 5th story, 1st apartment from west at north

    Aug 6, 2021 · Apt 5B

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective grout around bathtub tiles in the bathroom located at apt 5b, 5th story, 1st apartment from west at north

    Aug 6, 2021 · Apt 5B

    Closed — Violation dismissed
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 5b, 5th story, 1st apartment from west at north

    Aug 6, 2021 · Apt 5B

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective mechanical ventelation system in the bathroom located at apt 5b, 5th story, 1st apartment from west at north

    Aug 6, 2021 · Apt 5B

    Closed — Violation dismissed
  • C

    Properly repair the broken or defective lock at entrance door to the building , 1st story

    Mar 29, 2021

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 5a, 5th story, 2nd apartment from east at south

    Dec 5, 2019 · Apt 5A

    Open — First no access to re- inspect violation
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 5a, 5th story, 2nd apartment from east at south

    Dec 5, 2019 · Apt 5A

    Open — First no access to re- inspect violation
  • A

    Refit upper and lower window sashes in the bathroom located at apt 5a, 5th story, 2nd apartment from east at south

    Dec 5, 2019 · Apt 5A

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 1st room from north located at apt 5a, 5th story, 2nd apartment from west at north

    Dec 4, 2019 · Apt 5A

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 1st room from north located at apt 5a, 5th story, 2nd apartment from west at north

    Dec 4, 2019 · Apt 5A

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the east wall in the 1st room from north located at apt 5a, 5th story, 2nd apartment from west at north

    Dec 4, 2019 · Apt 5A

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector that is defective located at apt 5a, 5th story, 2nd apartment from west at north

    May 10, 2016 · Apt 5A

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). that is defective located at apt 5a, 5th story, 2nd apartment from west at north

    May 10, 2016 · Apt 5A

    Closed — Violation dismissed
  • A

    Properly repair the broken or defective mechanical stopper in bathtub in the 2nd bathroom located at apt 5a, 5th story, 2nd apartment from west at north

    May 10, 2016 · Apt 5A

    Closed — Violation dismissed
  • B

    Repair the roof so that it will not leak over the ceiling in the private hallway located at apt 5a, 5th story, 2nd apartment from west at north

    May 10, 2016 · Apt 5A

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all walls and the ceiling in the entire apartment located at apt 5a, 5th story, 2nd apartment from west at north

    May 10, 2016 · Apt 5A

    Open — First no access to re- inspect violation
  • B

    M/d law abate the nuisance consisting of a key operated lockset at the door to the fire escape in the 6th room from east located at apt 1a, 1st story, 1st apartment from west at north

    Apr 8, 2015 · Apt 1A

    Closed — Violation dismissed
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet ..... in the bathroom located at apt 1a, 1st story, 1st apartment from west at north

    Apr 8, 2015 · Apt 1A

    Closed — Violation dismissed
  • B

    Abate the nuisance consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east

    Jun 29, 2013 · Apt 1A

    Closed — Violation closed
  • B

    Properly repair the broken or defective faucet, sink in the kitchen located at apt 5c, 5th story, 1st apartment from north at east

    Apr 16, 2013 · Apt 5C

    Closed — Violation closed
  • B

    Properly repair the broken or defective light fixture at ceiling in the private hallway located at apt 5c, 5th story, 1st apartment from north at east

    Apr 16, 2013 · Apt 5C

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all walls, ceiling and counter in the kitchen located at apt 1a, 1st story, 2nd apartment from west at north

    Apr 4, 2013 · Apt 1A

    Closed — Violation closed
  • B

    Properly repair the broken or defective electrical outlets at east wall in the 1st room from east located at apt 1a, 1st story, 2nd apartment from west at north

    Apr 4, 2013 · Apt 1A

    Closed — Violation closed
  • B

    Properly repair the broken or defective electrical outlets at west wall in the kitchen located at apt 1a, 1st story, 2nd apartment from west at north

    Apr 4, 2013 · Apt 1A

    Closed — Violation closed

DOB building violations · 10

  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed

ECB violations · 0

No ECB violations on record

Complaints

  • Electric

    Power outage

    Sep 1, 2026 · Apt 2A

    Close
  • Electric

    Power outage

    Sep 1, 2026 · Apt 3B

    Close
  • Electric

    Power outage

    Sep 1, 2026 · Apt 3A

    Close
  • Electric

    No lighting

    Sep 1, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Feb 3, 2026 · Apt 5B

    Close
  • Appliance

    Refrigerator

    Feb 3, 2026 · Apt 5B

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Aug 24, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    Aug 6, 2025 · Apt 2A

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Dec 26, 2023 · Apt 5B

    Close
  • Unsanitary condition

    Pests

    Dec 26, 2023 · Apt 5B

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Dec 12, 2023 · Apt 5B

    Close
  • Appliance

    Refrigerator

    Dec 12, 2023 · Apt 5B

    Close
  • Heat/hot water

    Apartment only

    Nov 29, 2023 · Apt 5B

    Close
  • Appliance

    Refrigerator

    Nov 29, 2023 · Apt 5B

    Close
  • Appliance

    Refrigerator

    Nov 14, 2023 · Apt 5B

    Close
  • General

    Ventilation system

    Mar 10, 2023 · Apt 3A

    Close
  • Electric

    No lighting

    Mar 10, 2023 · Apt 3A

    Close
  • Plumbing

    Toilet

    Mar 10, 2023 · Apt 3A

    Close
  • Appliance

    Electric/gas range

    Mar 10, 2023 · Apt 3A

    Close
  • Heat/hot water

    Entire building

    Oct 19, 2022 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Oct 13, 2022 · Apt 5A

    Close
  • Paint/plaster

    Wall

    Oct 6, 2022 · Apt 5B

    Close
  • Unsanitary condition

    Mold

    Oct 6, 2022 · Apt 5B

    Close
  • Appliance

    Electric/gas range

    Oct 6, 2022 · Apt 5B

    Close
  • General

    Cabinet

    Aug 12, 2022 · Apt 5A

    Close
  • Plumbing

    Toilet

    Aug 12, 2022 · Apt 5A

    Close
  • Unsanitary condition

    Pests

    Aug 12, 2022 · Apt 5A

    Close
  • Unsanitary condition

    Pests

    Aug 12, 2022 · Apt 5A

    Close
  • General

    Ventilation system

    Aug 10, 2022 · Apt 5B

    Close
  • Appliance

    Refrigerator

    Aug 10, 2022 · Apt 5B

    Close
  • Paint/plaster

    Window/frame

    Jun 7, 2022 · Apt 5B

    Close
  • Paint/plaster

    Wall

    Jun 7, 2022 · Apt 5B

    Close
  • Paint/plaster

    Wall

    Jun 7, 2022 · Apt 5B

    Close
  • Unsanitary condition

    Mold

    Jun 7, 2022 · Apt 5B

    Close
  • Paint/plaster

    Window/frame

    Jun 7, 2022 · Apt 5B

    Close
  • Paint/plaster

    Wall

    Jun 7, 2022 · Apt 5B

    Close
  • Unsanitary condition

    Mold

    Jun 7, 2022 · Apt 5B

    Close
  • Heat/hot water

    Entire building

    Mar 4, 2022 · Apt 5B

    Close
  • Electric

    No lighting

    Mar 4, 2022 · Apt 5B

    Close
  • Electric

    No lighting

    Mar 4, 2022 · Apt 5B

    Close
  • Heat/hot water

    Apartment only

    Mar 4, 2022 · Apt 5B

    Close
  • Electric

    No lighting

    Mar 4, 2022 · Apt 5D

    Close
  • Heat/hot water

    Apartment only

    Mar 4, 2022 · Apt 5D

    Close
  • Unsanitary condition

    Mold

    Jul 26, 2021 · Apt 5B

    Close
  • Appliance

    Refrigerator

    Jul 11, 2021 · Apt 5C

    Close
  • Door/window

    Door

    Apr 8, 2021 · Apt 5B

    Close
  • Door/window

    Door

    Apr 3, 2021 · Apt 5B

    Close
  • General

    Mailbox

    Feb 18, 2021 · Apt 5B

    Close
  • Door/window

    Door

    Feb 18, 2021 · Apt 5B

    Close
  • Heat/hot water

    Apartment only

    Jan 30, 2021 · Apt 3A

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D6)
Year built
1910
Floors
5
Residential units
14
Building area
22,810 ft²
Lot area
5,178 ft²
Zoning
R7-2
Community board
110
Council district
9
Block / lot
1926 / 33
Assessed value
$1,978,200
Landmark / historic district
No

HPD registration #117763, last renewed Oct 14, 2025.

Questions about 2014 Adam C Powell Blvd

Who owns 2014 Adam C Powell Blvd?

The owner of record in NYC Department of City Planning PLUTO data is Gloria Homes Apts. L.p..

Does 2014 Adam C Powell Blvd have violations?

Yes. NYC HPD has recorded 55 housing violations at this property.

Is 2014 Adam C Powell Blvd rent stabilized?

NYC Department of Finance tax bills listed 14 rent-stabilized units here in 2023 (about 100% of its 14 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 2014 Adam C Powell Blvd built?

City records list 1910 as the year it was built.

How many apartments are in 2014 Adam C Powell Blvd?

It has 14 residential units and 17 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.