274 West 119 Street
Manhattan, NY 10026BBL 1-01924-0058Map
Owner of record: Grfo 274w119 LLC
274 West 119 Street is a walk-up apartment building built in 1910 in Manhattan, 10026. It has 20 residential units across 5 floors. The owner of record is Grfo 274w119 LLC. HPD has recorded 88 housing violations here, most recently on September 30, 2026. 9 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 88
- DOB violations
- 5
- ECB violations
- 3
- HPD complaints
- 157
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 88
- BHazardous
Properly repair or replace the broken or defective electrical light fixture at ceiling in the bathroom located at apt d, 1st story, 2nd apartment from east at south
Sep 30, 2026 · Apt D
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical outlet at north wall in the 5th room from north located at apt d, 1st story, 2nd apartment from east at south
Sep 30, 2026 · Apt D
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt d, 1st story, 2nd apartment from east at south
Sep 30, 2026 · Apt D
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt d, 1st story, 2nd apartment from east at south
Sep 30, 2026 · Apt D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt d, 1st story, 2nd apartment from east at south
Sep 30, 2026 · Apt D
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt d, 1st story, 2nd apartment from east at south
Sep 30, 2026 · Apt D
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak above ceiling in the bathroom located at apt d, 1st story, 2nd apartment from east at south
Sep 30, 2026 · Apt D
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective wood subflooring under radiator at south wall in the 2nd room from north located at apt 3d, 4th story, 2nd apartment from east at south
Dec 17, 2024 · Apt 3D
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of a key operated lock installed at door leading to fire escape window in the 4th room from north located at apt 1d, 2nd story, 2nd apartment from east at south
Dec 17, 2024 · Apt 1D
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1d, 2nd story, 2nd apartment from east at south
Dec 17, 2024 · Apt 1D
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 1d, 2nd story, 2nd apartment from east at south
Dec 17, 2024 · Apt 1D
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1d, 2nd story, 2nd apartment from east at south
Dec 17, 2024 · Apt 1D
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 2nd room from north located at apt 4c, 4th story, 1st apartment from east at south
Dec 16, 2024 · Apt 4C
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north located at apt 4c, 4th story, 1st apartment from east at south
Dec 16, 2024 · Apt 4C
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective radiator shut off valve at south wall in the 2nd room from north located at apt 4c, 4th story, 1st apartment from east at south
Dec 16, 2024 · Apt 4C
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4c, 4th story, 1st apartment from east at south
Dec 16, 2024 · Apt 4C
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective light fixture at ceiling in the kitchen located at apt 4c, 4th story, 1st apartment from east at south
Dec 16, 2024 · Apt 4C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceilings and all walls in the entire apartment located at apt 3c, 4th story, 1st apartment from east at south
Oct 24, 2024 · Apt 3C
Closed — Violation dismissed - ANon-hazardous
Properly secure the loose hanging escutcheon plate at heat riser ceiling in the 1st room from north located at apt 3c, 4th story, 1st apartment from west at north
Oct 24, 2024 · Apt 3C
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective washbasin in the bathroom located at apt 3c, 4th story, 1st apartment from east at south
Oct 24, 2024 · Apt 3C
Closed — Violation dismissed - BHazardous
Abate the infestation consisting of bedbugs in the entire apartment located at apt 3c, 4th story, 1st apartment from west at north
Oct 24, 2024 · Apt 3C
Closed — Violation dismissed - ANon-hazardous
Refit door. in the 5th room from north located at apt 3c, 4th story, 1st apartment from east at south
Oct 24, 2024 · Apt 3C
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation heat riser in the bathroom located at apt 3c, 4th story, 1st apartment from east at south
Oct 24, 2024 · Apt 3C
Closed — Violation dismissed - ANon-hazardous
Properly secure the loose hanging escutcheon plate at heat riser ceiling in the bathroom located at apt 3c, 4th story, 1st apartment from east at south
Oct 24, 2024 · Apt 3C
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective crack porcelain washbasin in the bathroom located at apt 3c, 4th story, 1st apartment from east at south
Oct 24, 2024 · Apt 3C
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective electrical wall outlet at east wall in the 5th room from north located at apt 3c, 4th story, 1st apartment from east at south
Oct 24, 2024 · Apt 3C
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 3c, 4th story, 1st apartment from east at south
Oct 24, 2024 · Apt 3C
Closed — Violation dismissed - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at in the entrance located at apt 3c, 4th story, 1st apartment from east at south
Oct 24, 2024 · Apt 3C
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor at heat riser. in the 2nd room from east at south located at apt 3c, 4th story, 1st apartment from east at south
Oct 24, 2024 · Apt 3C
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 3c, 4th story, section at south
Oct 24, 2024 · Apt 3C
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective metal nosing floor entrance at ceramic tiles in the kitchen located at apt 3c, 4th story, section at south
Oct 24, 2024 · Apt 3C
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Apr 8, 2024
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2a, 2nd story, 1st apartment from south at west
Apr 8, 2024 · Apt 2A
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latchset at vestibule door , 1st story
Apr 3, 2024
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the bathroom located at apt 3d, 3rd story, 2nd apartment from east at south
Feb 12, 2024 · Apt 3D
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approximately 6 sq.ft at west wall in the bathroom located at apt 3d, 3rd story, 2nd apartment from east at south
Feb 12, 2024 · Apt 3D
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape window in the 4th room from north located at apt 3d, 3rd story, 2nd apartment from east at south
Feb 12, 2024 · Apt 3D
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape window in the 5th room from north located at apt 3c, 3rd story, 1st apartment from east at south
Oct 16, 2023 · Apt 3C
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective buckling wood floor approximately 20 sq.ft in the 2nd room from north located at apt 3c, 3rd story, 1st apartment from east at south
Oct 16, 2023 · Apt 3C
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of protruding nails at wood floor in the 2nd room from north located at apt 3c, 3rd story, 1st apartment from east at south
Oct 16, 2023 · Apt 3C
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3c, 3rd story, 1st apartment from east at south
Oct 16, 2023 · Apt 3C
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing escutchein plate at heat riser ceiling , in the 1st room from north located at apt 3c, 3rd story, 1st apartment from east at south
Aug 17, 2023 · Apt 3C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceilings and all walls in the entire apartment located at apt 3c, 3rd story, 1st apartment from east at south
Aug 17, 2023 · Apt 3C
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3c, 3rd story, 1st apartment from east at south
Aug 17, 2023 · Apt 3C
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3c, 3rd story, 1st apartment from east at south
Aug 17, 2023 · Apt 3C
Closed — Violation closed - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at in the entrance located at apt 3c, 3rd story, 1st apartment from east at south
Aug 17, 2023 · Apt 3C
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective buckling wood floor approx 20 sq ft in the 2nd room from north located at apt 3c, 3rd story, 1st apartment from east at south
Aug 17, 2023 · Apt 3C
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of protruding nails at wood floor. in the 2nd room from north located at apt 3c, 3rd story, 1st apartment from east at south
Aug 17, 2023 · Apt 3C
Closed — Violation closed - BHazardous
Abate the infestation consisting of bedbugs in the entire apartment located at apt 3c, 3rd story, 1st apartment from east at south
Aug 17, 2023 · Apt 3C
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3c, 3rd story, 1st apartment from east at south
Aug 17, 2023 · Apt 3C
Closed — Violation closed
DOB building violations · 5
- Construction other optional
C-construction other optional
Dec 10, 2007
Vw*-violation - work w/o permit dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 3
- Class - 2
Correct all violating conditions, submit a certificate of correction.
Nov 15, 2019
Resolve - Non-hazardous
Failure to maintain interior bldg defects noted: first fl apt 1d having in the bathroom subsided weak fl at bath tub area approx. 2" on length of 2'-0" also crakced wall at doorway. remedy: repair defecting fl.
Nov 27, 2007
Resolve - Non-hazardous
Work w/o a permit: work noted at apt a 1st flr & cellar level having installed a convenience stair case & partitions for use as accessory toapt"a"1st flr front w/ 2 pc bthrm in uncompleted phase, apprx 60% of
Jul 2, 2007
Resolve
Complaints
- Appliance
Refrigerator
Sep 29, 2026 · Apt D
Close - Appliance
Electric/gas range
Sep 29, 2026 · Apt D
Close - Electric
No lighting
Sep 29, 2026 · Apt D
Close - Electric
Outlet/switch
Sep 29, 2026 · Apt D
Close - Safety
Carbon monoxide detector
Sep 29, 2026 · Apt D
Close - Safety
Smoke detector
Sep 29, 2026 · Apt D
Close - Paint/plaster
Wall
Sep 29, 2026 · Apt D
Close - Flooring/stairs
Floor
Sep 29, 2026 · Apt D
Close - Paint/plaster
Ceiling
Sep 29, 2026 · Apt D
Close - Electric
Lighting
Aug 17, 2026 · Apt D
Close
Show 40 more ↓
- Heat/hot water
Entire building
Dec 19, 2025 · Apt BLDG
Close - Unsanitary condition
Pests
Sep 12, 2025 · Apt 3C
Close - Water leak
Heavy flow
Jul 21, 2025 · Apt ABASEM
Close - Flooring/stairs
Floor
Apr 18, 2025 · Apt 3C
Close - Paint/plaster
Wall
Apr 18, 2025 · Apt 3C
Close - Plumbing
Basin/sink
Apr 11, 2025 · Apt 3C
Close - Unsanitary condition
Pests
Apr 11, 2025 · Apt 3C
Close - Water leak
Slow leak
Apr 11, 2025 · Apt 3C
Close - Unsanitary condition
Pests
Apr 11, 2025 · Apt 3C
Close - Appliance
Refrigerator
Apr 11, 2025 · Apt 3C
Close - Plumbing
Radiator
Apr 11, 2025 · Apt 3C
Close - Heat/hot water
Entire building
Jan 21, 2025 · Apt 1B
Close - Plumbing
Toilet
Jan 10, 2025 · Apt 1B
Close - Plumbing
Steam pipe/riser
Dec 11, 2024 · Apt 4C
Close - Electric
Outlet/switch
Oct 28, 2024 · Apt 3C
Close - Electric
Lighting
Oct 28, 2024 · Apt 3C
Close - Door/window
Door
Oct 28, 2024 · Apt 3C
Close - Plumbing
Bathtub/shower
Oct 28, 2024 · Apt 3C
Close - Plumbing
Basin/sink
Oct 28, 2024 · Apt 3C
Close - Plumbing
Basin/sink
Oct 28, 2024 · Apt 3C
Close - Unsanitary condition
Pests
Oct 28, 2024 · Apt 3C
Close - Electric
No lighting
Oct 22, 2024 · Apt 3C
Close - Flooring/stairs
Floor
Oct 22, 2024 · Apt 3C
Close - Door/window
Door
Oct 22, 2024 · Apt 3C
Close - Plumbing
Basin/sink
Oct 22, 2024 · Apt 3C
Close - Unsanitary condition
Pests
Oct 22, 2024 · Apt 3C
Close - Unsanitary condition
Pests
Oct 22, 2024 · Apt 3C
Close - Unsanitary condition
Pests
Sep 23, 2024 · Apt 3C
Close - Heat/hot water
Entire building
May 9, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 20, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 11, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 9, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 9, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 8, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Apr 5, 2024 · Apt 3C
Close - Heat/hot water
Entire building
Apr 3, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 26, 2024 · Apt 3C
Close - Heat/hot water
Entire building
Mar 26, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 19, 2024 · Apt BLDG
Close - Plumbing
Water supply
Oct 30, 2023 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C5)
- Year built
- 1910
- Floors
- 5
- Residential units
- 20
- Building area
- 9,100 ft²
- Lot area
- 2,523 ft²
- Zoning
- R7A
- Community board
- 110
- Council district
- 9
- Block / lot
- 1924 / 58
- Assessed value
- $837,450
- Landmark / historic district
- No
HPD registration #132509, last renewed Aug 23, 2025.
Questions about 274 West 119 Street
Who owns 274 West 119 Street?
The owner of record in NYC Department of City Planning PLUTO data is Grfo 274w119 LLC.
Does 274 West 119 Street have violations?
Yes. NYC HPD has recorded 88 housing violations at this property.
Is 274 West 119 Street rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 30% of its 20 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 274 West 119 Street built?
City records list 1910 as the year it was built.
How many apartments are in 274 West 119 Street?
It has 20 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.