roofy

2245 Adam C Powell Blvd

Manhattan, NY 10027BBL 1-01917-0001Map

Owner of record: Hph Clayton, LLC

2245 Adam C Powell Blvd is a walk-up apartment building built in 1910 in Manhattan, 10027. It has 8 residential units across 5 floors. The owner of record is Hph Clayton, LLC. HPD has recorded 118 housing violations here, most recently on December 5, 2025. 5 of the 50 most recent violations are still open. City tax records listed 8 rent-stabilized apartments here in 2024.

HPD violations
118
DOB violations
8
ECB violations
2
HPD complaints
303

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Dec 5, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
8
About 100% of the building's 8 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 118

  • C

    Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at the boilers and water heaters room at cellar

    Dec 5, 2025

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2w, 2nd story, 1st apartment from south at west

    Dec 5, 2025 · Apt 2W

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective mechanical stopper at the bath tub in the bathroom located at apt 5w, 5th story, 1st apartment from east at south

    Apr 17, 2025 · Apt 5W

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2w, 2nd story, 1st apartment from south at west

    Jan 25, 2025 · Apt 2W

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door to boiler room locked

    Jan 25, 2025

    Closed — Violation dismissed
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 5w, 5th story, 1st apartment from east at south

    Jan 13, 2025 · Apt 5W

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak above 3rd window soffit from east at southwall in the 1st room from east located at apt 5w, 5th story, 1st apartment from south at west

    Oct 8, 2024 · Apt 5W

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color 3rd window soffit from east at southwall in the 1st room from east located at apt 5w, 5th story, 1st apartment from south at west

    Oct 8, 2024 · Apt 5W

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 1, 2024

    Closed — Violation dismissed
  • B

    Repair the roof so that it will not leak above ceiling in the 2nd room from east located at apt 5e, 5th story, 1st apartment from north at east

    Jan 10, 2024 · Apt 5E

    Closed — Violation dismissed
Show 40 more ↓
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east located at apt 5e, 5th story, 1st apartment from north at east

    Jan 10, 2024 · Apt 5E

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective bell and buzzer return system from building entrance to private hall in the private hallway located at apt 2w, 2nd story, 1st apartment from south at west

    Jan 9, 2023 · Apt 2W

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2w, 2nd story, 1st apartment from south at west

    Jan 9, 2023 · Apt 2W

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective fire retarded meterial at ceiling at public hall, 1st story

    Jan 9, 2023

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective mechanical ventilation system in the bathroom located at apt 5w, 5th story, 1st apartment from south at west

    Dec 30, 2022 · Apt 5W

    Closed — Violation dismissed
  • A

    Properly repair the broken or defective balance at lower window sash in the 2nd room from east at north located at apt 5w, 5th story, 1st apartment from south at west

    Dec 30, 2022 · Apt 5W

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective mechanical ventilation system in the kitchen located at apt 5w, 5th story, 1st apartment from south at west

    Dec 30, 2022 · Apt 5W

    Closed — Violation dismissed
  • B

    Provide adequate supply of hot water for the fixtures at sink's faucet in the kitchen located at apt 5w, 5th story, 1st apartment from south at west

    Dec 30, 2022 · Apt 5W

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 15, 2022

    Closed — Violation dismissed
  • B

    Replace the broken or defective porcelain enamel glaze finish at bathtub in the bathroom located at apt 2e, 2nd story, 1st apartment from north at east

    Feb 25, 2021 · Apt 2E

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color closet walls and ceiling in the 1st room from north at west located at apt 5w, 5th story, 1st apartment from south at west

    Feb 24, 2021 · Apt 5W

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from north at west located at apt 5w, 5th story, 1st apartment from south at west

    Feb 24, 2021 · Apt 5W

    Open — Nov sent out
  • B

    Provide adequate supply of hot water for the fixtures at bathtub faucet in the bathroom located at apt 5w, 5th story, 1st apartment from south at west

    Feb 24, 2021 · Apt 5W

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the 1st room from north at west located at apt 5w, 5th story, 1st apartment from south at west

    Feb 24, 2021 · Apt 5W

    Closed — Violation dismissed
  • B

    Repair the roof so that it will not leak evidence of water leak at ceiling in the 1st room from north at west located at apt 5w, 5th story, 1st apartment from south at west

    Feb 24, 2021 · Apt 5W

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... aprox 2 sqft at north closet ceiling in the 1st room from east located at apt 5w, 5th story, 1st apartment from south at west

    Feb 6, 2021 · Apt 5W

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color north closet ceiling and all walls in the 1st room from east located at apt 5w, 5th story, 1st apartment from south at west

    Feb 6, 2021 · Apt 5W

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east located at apt 5w, 5th story, 1st apartment from south at west

    Feb 6, 2021 · Apt 5W

    Closed — Violation dismissed
  • B

    Repair the roof so that it will not leak above the ceiling in the 1st room from east located at apt 5w, 5th story, 1st apartment from south at west

    Feb 6, 2021 · Apt 5W

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective intercom system from building entrance door to apartment in the foyer located at apt 5w, 5th story, 1st apartment from south at west

    Feb 6, 2021 · Apt 5W

    Closed — Violation dismissed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color ...at the ceiling in the 1st room from east located at apt 5w, 5th story, 1st apartment from south at west

    Jan 12, 2021 · Apt 5W

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective stopper at bathtub in the bathroom located at apt 2e, 2nd story, 1st apartment from north at east

    Jan 4, 2021 · Apt 2E

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 5w, 5th story, 1st apartment from south at west

    Dec 23, 2020 · Apt 5W

    Open — Violation will be reinspected
  • A

    Properly repair with similar material the broken or defective grout at the south wall at bathtub in the bathroom located at apt 5w, 5th story, 1st apartment from south at west

    Dec 23, 2020 · Apt 5W

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system .basement locked door at boiler room

    Dec 23, 2020

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 5w, 5th story, 1st apartment from south at west

    Dec 23, 2020 · Apt 5W

    Closed — Violation dismissed
  • A

    Properly repair the broken or defective mechanical air vent at the south wall in the kitchen located at apt 5w, 5th story, 1st apartment from south at west

    Dec 23, 2020 · Apt 5W

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north located at apt 5w, 5th story, 1st apartment from south at west

    Dec 23, 2020 · Apt 5W

    Closed — Violation dismissed
  • B

    Repair the roof so that it will not leak at the ceiling in the 1st room from north located at apt 5w, 5th story, 1st apartment from south at west

    Dec 23, 2020 · Apt 5W

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall inside the closet at north in the 1st room from east located at apt 5w, 5th story, 1st apartment from south at west

    Nov 15, 2020 · Apt 5W

    Open — Violation will be reinspected
  • B

    Remove all encumbrances consisting of bicycle chained to handrail at bulkhead landing at public hall, 5th story

    Nov 15, 2020

    Open — Violation will be reinspected
  • B

    Remove all encumbrances consisting of household items at public hall, 5th story

    Nov 15, 2020

    Open — Violation will be reinspected
  • C

    M/d law abate the nuisance consisting of air conditioner at fire escape window at 3rd and 5th story balcony at building front

    Jun 3, 2020

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at north located at apt 3e, 3rd story, 1st apartment from north at east

    Jan 18, 2020 · Apt 3E

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling. in the 1st room from east at north located at apt 3e, 3rd story, 1st apartment from north at east

    Jan 18, 2020 · Apt 3E

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story

    Jan 18, 2020

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling and north wall at public hall, 1st story

    Jan 18, 2020

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department ceiling and north wall at public hall, 1st story

    Jan 18, 2020

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at north wall in the 1st room from east at north located at apt 2e, 2nd story, 1st apartment from north at east

    Dec 21, 2019 · Apt 2E

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from east at north located at apt 2e, 2nd story, 1st apartment from north at east

    Dec 21, 2019 · Apt 2E

    Closed — Violation closed

DOB building violations · 8

  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1994

    Dob violation - dismissed
  • Unsafe buildings none

    Ub-unsafe buildings none

    Feb 14, 1994

    Dob violation - dismissed
  • Immediate emergency anythingoptional

    Imegncy-immediate emergency anythingoptional

    Apr 9, 1993

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed

ECB violations · 2

  • Class - 1

    Failure to maintain bldg walls or appurtenances: decorative (drivet) cornice approx 8'l x 4'w dislodged & fell onto sidewalk at south elevation of bldg. remainding sections of cornice structural stability in

    Apr 23, 2015 · Penalty $1,000

    Resolve
  • Non-hazardous

    Failure to maintain. cosemtic veneer masonary approx 3/4" wide is pulling away from wall. size is about 10 feet high x 16 feet across. imminant danger of collapse onto sidewalk at first floor south wall

    Mar 28, 1994

    Resolve

Complaints

  • Unsanitary condition

    Garbage/recycling storage

    Jul 3, 2026 · Apt 3W

    Close
  • Heat/hot water

    Apartment only

    Dec 3, 2025 · Apt 2W

    Close
  • Heat/hot water

    Apartment only

    Aug 31, 2025 · Apt 2W

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Aug 28, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 22, 2025 · Apt 2W

    Close
  • Heat/hot water

    Apartment only

    Jan 8, 2025 · Apt 2W

    Close
  • Heat/hot water

    Apartment only

    Dec 5, 2024 · Apt 2W

    Close
  • Plumbing

    Toilet

    Dec 4, 2024 · Apt 5W

    Close
  • Heat/hot water

    Apartment only

    Dec 4, 2024 · Apt 5W

    Close
  • Flooring/stairs

    Floor

    Dec 4, 2024 · Apt 5W

    Close
Show 40 more ↓
  • Door/window

    Door frame

    Dec 4, 2024 · Apt 5W

    Close
  • Plumbing

    Water supply

    Dec 4, 2024 · Apt 5W

    Close
  • Door/window

    Door

    Dec 4, 2024 · Apt 5W

    Close
  • General

    Cabinet

    Dec 4, 2024 · Apt 5W

    Close
  • Heat/hot water

    Apartment only

    Dec 4, 2024 · Apt 5W

    Close
  • Heat/hot water

    Apartment only

    Dec 1, 2024 · Apt 2W

    Close
  • Flooring/stairs

    Floor

    Oct 1, 2024 · Apt 5W

    Close
  • Plumbing

    Bathtub/shower

    Oct 1, 2024 · Apt 5W

    Close
  • Plumbing

    Water supply

    Oct 1, 2024 · Apt 5W

    Close
  • Door/window

    Window frame

    Oct 1, 2024 · Apt 5W

    Close
  • Plumbing

    Water supply

    Oct 1, 2024 · Apt 5W

    Close
  • Paint/plaster

    Ceiling

    Jan 10, 2024 · Apt 5E

    Close
  • Paint/plaster

    Window/frame

    Jan 10, 2024 · Apt 5E

    Close
  • Electric

    Lighting

    Jan 10, 2024 · Apt 5E

    Close
  • Door/window

    Window frame

    Jan 10, 2024 · Apt 5E

    Close
  • Unsanitary condition

    Pests

    Jan 10, 2024 · Apt 5E

    Close
  • Water leak

    Heavy flow

    Jan 10, 2024 · Apt 5E

    Close
  • Plumbing

    Water supply

    Jul 16, 2023 · Apt 5W

    Close
  • Plumbing

    Water supply

    Jul 15, 2023 · Apt 3E

    Close
  • Plumbing

    Water supply

    Jul 10, 2023 · Apt 4E

    Close
  • Plumbing

    Bathtub/shower

    Jul 3, 2023 · Apt 4E

    Close
  • Plumbing

    Water supply

    Apr 29, 2023 · Apt 5W

    Close
  • Door/window

    Door

    Apr 29, 2023 · Apt 5W

    Close
  • Flooring/stairs

    Floor

    Apr 29, 2023 · Apt 5W

    Close
  • Plumbing

    Bathtub/shower

    Apr 29, 2023 · Apt 5W

    Close
  • Flooring/stairs

    Floor

    Apr 29, 2023 · Apt 5W

    Close
  • Water leak

    Heavy flow

    Apr 29, 2023 · Apt 5W

    Close
  • Plumbing

    Radiator

    Dec 27, 2022 · Apt 3W

    Close
  • Unsanitary condition

    Pests

    Dec 27, 2022 · Apt 3W

    Close
  • Door/window

    Window frame

    Dec 24, 2022 · Apt 5W

    Close
  • Heat/hot water

    Apartment only

    Dec 24, 2022 · Apt 5W

    Close
  • Plumbing

    Water supply

    Dec 24, 2022 · Apt 5W

    Close
  • Plumbing

    Radiator

    Nov 29, 2022 · Apt 3W

    Close
  • Unsanitary condition

    Pests

    Nov 29, 2022 · Apt 3W

    Close
  • Plumbing

    Radiator

    Oct 12, 2022 · Apt 2W

    Close
  • Plumbing

    Radiator

    Oct 12, 2022 · Apt 2W

    Close
  • Unsanitary condition

    Pests

    Oct 12, 2022 · Apt 2W

    Close
  • Plumbing

    Radiator

    Aug 23, 2022 · Apt 2W

    Close
  • Plumbing

    Radiator

    Aug 23, 2022 · Apt 2W

    Close
  • Unsanitary condition

    Pests

    Aug 23, 2022 · Apt 2W

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C7)
Year built
1910
Floors
5
Residential units
8
Building area
8,875 ft²
Lot area
1,875 ft²
Zoning
R7-2
Community board
110
Council district
9
Block / lot
1917 / 1
Assessed value
$416,700
Landmark / historic district
No

HPD registration #102991, last renewed Aug 29, 2025.

Questions about 2245 Adam C Powell Blvd

Who owns 2245 Adam C Powell Blvd?

The owner of record in NYC Department of City Planning PLUTO data is Hph Clayton, LLC.

Does 2245 Adam C Powell Blvd have violations?

Yes. NYC HPD has recorded 118 housing violations at this property.

Is 2245 Adam C Powell Blvd rent stabilized?

NYC Department of Finance tax bills listed 8 rent-stabilized units here in 2024 (about 100% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 2245 Adam C Powell Blvd built?

City records list 1910 as the year it was built.

How many apartments are in 2245 Adam C Powell Blvd?

It has 8 residential units and 9 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.