2245 Adam C Powell Blvd
Manhattan, NY 10027BBL 1-01917-0001Map
Owner of record: Hph Clayton, LLC
2245 Adam C Powell Blvd is a walk-up apartment building built in 1910 in Manhattan, 10027. It has 8 residential units across 5 floors. The owner of record is Hph Clayton, LLC. HPD has recorded 118 housing violations here, most recently on December 5, 2025. 5 of the 50 most recent violations are still open. City tax records listed 8 rent-stabilized apartments here in 2024.
- HPD violations
- 118
- DOB violations
- 8
- ECB violations
- 2
- HPD complaints
- 303
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 118
- CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at the boilers and water heaters room at cellar
Dec 5, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2w, 2nd story, 1st apartment from south at west
Dec 5, 2025 · Apt 2W
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective mechanical stopper at the bath tub in the bathroom located at apt 5w, 5th story, 1st apartment from east at south
Apr 17, 2025 · Apt 5W
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2w, 2nd story, 1st apartment from south at west
Jan 25, 2025 · Apt 2W
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door to boiler room locked
Jan 25, 2025
Closed — Violation dismissed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 5w, 5th story, 1st apartment from east at south
Jan 13, 2025 · Apt 5W
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak above 3rd window soffit from east at southwall in the 1st room from east located at apt 5w, 5th story, 1st apartment from south at west
Oct 8, 2024 · Apt 5W
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color 3rd window soffit from east at southwall in the 1st room from east located at apt 5w, 5th story, 1st apartment from south at west
Oct 8, 2024 · Apt 5W
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2024
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak above ceiling in the 2nd room from east located at apt 5e, 5th story, 1st apartment from north at east
Jan 10, 2024 · Apt 5E
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east located at apt 5e, 5th story, 1st apartment from north at east
Jan 10, 2024 · Apt 5E
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective bell and buzzer return system from building entrance to private hall in the private hallway located at apt 2w, 2nd story, 1st apartment from south at west
Jan 9, 2023 · Apt 2W
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2w, 2nd story, 1st apartment from south at west
Jan 9, 2023 · Apt 2W
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retarded meterial at ceiling at public hall, 1st story
Jan 9, 2023
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective mechanical ventilation system in the bathroom located at apt 5w, 5th story, 1st apartment from south at west
Dec 30, 2022 · Apt 5W
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective balance at lower window sash in the 2nd room from east at north located at apt 5w, 5th story, 1st apartment from south at west
Dec 30, 2022 · Apt 5W
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective mechanical ventilation system in the kitchen located at apt 5w, 5th story, 1st apartment from south at west
Dec 30, 2022 · Apt 5W
Closed — Violation dismissed - BHazardous
Provide adequate supply of hot water for the fixtures at sink's faucet in the kitchen located at apt 5w, 5th story, 1st apartment from south at west
Dec 30, 2022 · Apt 5W
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 15, 2022
Closed — Violation dismissed - BHazardous
Replace the broken or defective porcelain enamel glaze finish at bathtub in the bathroom located at apt 2e, 2nd story, 1st apartment from north at east
Feb 25, 2021 · Apt 2E
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color closet walls and ceiling in the 1st room from north at west located at apt 5w, 5th story, 1st apartment from south at west
Feb 24, 2021 · Apt 5W
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north at west located at apt 5w, 5th story, 1st apartment from south at west
Feb 24, 2021 · Apt 5W
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures at bathtub faucet in the bathroom located at apt 5w, 5th story, 1st apartment from south at west
Feb 24, 2021 · Apt 5W
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the 1st room from north at west located at apt 5w, 5th story, 1st apartment from south at west
Feb 24, 2021 · Apt 5W
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak evidence of water leak at ceiling in the 1st room from north at west located at apt 5w, 5th story, 1st apartment from south at west
Feb 24, 2021 · Apt 5W
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... aprox 2 sqft at north closet ceiling in the 1st room from east located at apt 5w, 5th story, 1st apartment from south at west
Feb 6, 2021 · Apt 5W
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north closet ceiling and all walls in the 1st room from east located at apt 5w, 5th story, 1st apartment from south at west
Feb 6, 2021 · Apt 5W
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east located at apt 5w, 5th story, 1st apartment from south at west
Feb 6, 2021 · Apt 5W
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak above the ceiling in the 1st room from east located at apt 5w, 5th story, 1st apartment from south at west
Feb 6, 2021 · Apt 5W
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective intercom system from building entrance door to apartment in the foyer located at apt 5w, 5th story, 1st apartment from south at west
Feb 6, 2021 · Apt 5W
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ...at the ceiling in the 1st room from east located at apt 5w, 5th story, 1st apartment from south at west
Jan 12, 2021 · Apt 5W
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective stopper at bathtub in the bathroom located at apt 2e, 2nd story, 1st apartment from north at east
Jan 4, 2021 · Apt 2E
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 5w, 5th story, 1st apartment from south at west
Dec 23, 2020 · Apt 5W
Open — Violation will be reinspected - ANon-hazardous
Properly repair with similar material the broken or defective grout at the south wall at bathtub in the bathroom located at apt 5w, 5th story, 1st apartment from south at west
Dec 23, 2020 · Apt 5W
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system .basement locked door at boiler room
Dec 23, 2020
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 5w, 5th story, 1st apartment from south at west
Dec 23, 2020 · Apt 5W
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective mechanical air vent at the south wall in the kitchen located at apt 5w, 5th story, 1st apartment from south at west
Dec 23, 2020 · Apt 5W
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north located at apt 5w, 5th story, 1st apartment from south at west
Dec 23, 2020 · Apt 5W
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at the ceiling in the 1st room from north located at apt 5w, 5th story, 1st apartment from south at west
Dec 23, 2020 · Apt 5W
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall inside the closet at north in the 1st room from east located at apt 5w, 5th story, 1st apartment from south at west
Nov 15, 2020 · Apt 5W
Open — Violation will be reinspected - BHazardous
Remove all encumbrances consisting of bicycle chained to handrail at bulkhead landing at public hall, 5th story
Nov 15, 2020
Open — Violation will be reinspected - BHazardous
Remove all encumbrances consisting of household items at public hall, 5th story
Nov 15, 2020
Open — Violation will be reinspected - CImmediately hazardous
M/d law abate the nuisance consisting of air conditioner at fire escape window at 3rd and 5th story balcony at building front
Jun 3, 2020
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at north located at apt 3e, 3rd story, 1st apartment from north at east
Jan 18, 2020 · Apt 3E
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling. in the 1st room from east at north located at apt 3e, 3rd story, 1st apartment from north at east
Jan 18, 2020 · Apt 3E
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story
Jan 18, 2020
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and north wall at public hall, 1st story
Jan 18, 2020
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and north wall at public hall, 1st story
Jan 18, 2020
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall in the 1st room from east at north located at apt 2e, 2nd story, 1st apartment from north at east
Dec 21, 2019 · Apt 2E
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from east at north located at apt 2e, 2nd story, 1st apartment from north at east
Dec 21, 2019 · Apt 2E
Closed — Violation closed
DOB building violations · 8
- Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Unsafe buildings none
Ub-unsafe buildings none
Feb 14, 1994
Dob violation - dismissed - Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Apr 9, 1993
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 2
- Class - 1
Failure to maintain bldg walls or appurtenances: decorative (drivet) cornice approx 8'l x 4'w dislodged & fell onto sidewalk at south elevation of bldg. remainding sections of cornice structural stability in
Apr 23, 2015 · Penalty $1,000
Resolve - Non-hazardous
Failure to maintain. cosemtic veneer masonary approx 3/4" wide is pulling away from wall. size is about 10 feet high x 16 feet across. imminant danger of collapse onto sidewalk at first floor south wall
Mar 28, 1994
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Jul 3, 2026 · Apt 3W
Close - Heat/hot water
Apartment only
Dec 3, 2025 · Apt 2W
Close - Heat/hot water
Apartment only
Aug 31, 2025 · Apt 2W
Close - Unsanitary condition
Garbage/recycling storage
Aug 28, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 22, 2025 · Apt 2W
Close - Heat/hot water
Apartment only
Jan 8, 2025 · Apt 2W
Close - Heat/hot water
Apartment only
Dec 5, 2024 · Apt 2W
Close - Plumbing
Toilet
Dec 4, 2024 · Apt 5W
Close - Heat/hot water
Apartment only
Dec 4, 2024 · Apt 5W
Close - Flooring/stairs
Floor
Dec 4, 2024 · Apt 5W
Close
Show 40 more ↓
- Door/window
Door frame
Dec 4, 2024 · Apt 5W
Close - Plumbing
Water supply
Dec 4, 2024 · Apt 5W
Close - Door/window
Door
Dec 4, 2024 · Apt 5W
Close - General
Cabinet
Dec 4, 2024 · Apt 5W
Close - Heat/hot water
Apartment only
Dec 4, 2024 · Apt 5W
Close - Heat/hot water
Apartment only
Dec 1, 2024 · Apt 2W
Close - Flooring/stairs
Floor
Oct 1, 2024 · Apt 5W
Close - Plumbing
Bathtub/shower
Oct 1, 2024 · Apt 5W
Close - Plumbing
Water supply
Oct 1, 2024 · Apt 5W
Close - Door/window
Window frame
Oct 1, 2024 · Apt 5W
Close - Plumbing
Water supply
Oct 1, 2024 · Apt 5W
Close - Paint/plaster
Ceiling
Jan 10, 2024 · Apt 5E
Close - Paint/plaster
Window/frame
Jan 10, 2024 · Apt 5E
Close - Electric
Lighting
Jan 10, 2024 · Apt 5E
Close - Door/window
Window frame
Jan 10, 2024 · Apt 5E
Close - Unsanitary condition
Pests
Jan 10, 2024 · Apt 5E
Close - Water leak
Heavy flow
Jan 10, 2024 · Apt 5E
Close - Plumbing
Water supply
Jul 16, 2023 · Apt 5W
Close - Plumbing
Water supply
Jul 15, 2023 · Apt 3E
Close - Plumbing
Water supply
Jul 10, 2023 · Apt 4E
Close - Plumbing
Bathtub/shower
Jul 3, 2023 · Apt 4E
Close - Plumbing
Water supply
Apr 29, 2023 · Apt 5W
Close - Door/window
Door
Apr 29, 2023 · Apt 5W
Close - Flooring/stairs
Floor
Apr 29, 2023 · Apt 5W
Close - Plumbing
Bathtub/shower
Apr 29, 2023 · Apt 5W
Close - Flooring/stairs
Floor
Apr 29, 2023 · Apt 5W
Close - Water leak
Heavy flow
Apr 29, 2023 · Apt 5W
Close - Plumbing
Radiator
Dec 27, 2022 · Apt 3W
Close - Unsanitary condition
Pests
Dec 27, 2022 · Apt 3W
Close - Door/window
Window frame
Dec 24, 2022 · Apt 5W
Close - Heat/hot water
Apartment only
Dec 24, 2022 · Apt 5W
Close - Plumbing
Water supply
Dec 24, 2022 · Apt 5W
Close - Plumbing
Radiator
Nov 29, 2022 · Apt 3W
Close - Unsanitary condition
Pests
Nov 29, 2022 · Apt 3W
Close - Plumbing
Radiator
Oct 12, 2022 · Apt 2W
Close - Plumbing
Radiator
Oct 12, 2022 · Apt 2W
Close - Unsanitary condition
Pests
Oct 12, 2022 · Apt 2W
Close - Plumbing
Radiator
Aug 23, 2022 · Apt 2W
Close - Plumbing
Radiator
Aug 23, 2022 · Apt 2W
Close - Unsanitary condition
Pests
Aug 23, 2022 · Apt 2W
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1910
- Floors
- 5
- Residential units
- 8
- Building area
- 8,875 ft²
- Lot area
- 1,875 ft²
- Zoning
- R7-2
- Community board
- 110
- Council district
- 9
- Block / lot
- 1917 / 1
- Assessed value
- $416,700
- Landmark / historic district
- No
HPD registration #102991, last renewed Aug 29, 2025.
Questions about 2245 Adam C Powell Blvd
Who owns 2245 Adam C Powell Blvd?
The owner of record in NYC Department of City Planning PLUTO data is Hph Clayton, LLC.
Does 2245 Adam C Powell Blvd have violations?
Yes. NYC HPD has recorded 118 housing violations at this property.
Is 2245 Adam C Powell Blvd rent stabilized?
NYC Department of Finance tax bills listed 8 rent-stabilized units here in 2024 (about 100% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2245 Adam C Powell Blvd built?
City records list 1910 as the year it was built.
How many apartments are in 2245 Adam C Powell Blvd?
It has 8 residential units and 9 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.