2849 Broadway
Manhattan, NY 10025BBL 1-01894-7501Map
Owner of record: Broadway 111 Street Condominium
2849 Broadway is a condominium built in 1926 in Manhattan, 10025. It has 151 residential units across 16 floors. The owner of record is Broadway 111 Street Condominium. HPD has recorded 54 housing violations here, most recently on September 6, 2023. 3 of the 50 most recent violations are still open. City tax records listed 25 rent-stabilized apartments here in 2024.
- HPD violations
- 54
- DOB violations
- 52
- ECB violations
- 32
- HPD complaints
- 158
Available now in this building
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 54
- CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4g, 4th story, 1st apartment from north at east
Sep 6, 2023 · Apt 4G
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 9c, 9th story, 1st apartment from south at west
Jan 11, 2022 · Apt 9C
Open — Not complied with - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the bathroom located at apt 9c, 9th story, 1st apartment from south at west
Jan 11, 2022 · Apt 9C
Open — Not complied with - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroom located at apt 9c, 9th story, 1st apartment from south at west
Jan 11, 2022 · Apt 9C
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... at west wall approximately 15 sq. ft. and south wall approximately 10 sq. ft. in the bathroom located at apt 9c, 9th story, 1st apartment from south at west
Jan 11, 2022 · Apt 9C
Open — Defect letter issued - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 9c, 9th story, 1st apartment from south at west
Jan 11, 2022 · Apt 9C
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 9c, 9th story, 1st apartment from south at west
Apr 29, 2021 · Apt 9C
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing. in the entire apartment located at apt 9c, 9th story, 1st apartment from south at west
Apr 29, 2021 · Apt 9C
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling. in the bathroom located at apt 9c, 9th story, 1st apartment from south at west
Apr 29, 2021 · Apt 9C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 9c, 9th story, 1st apartment from south at west
Apr 29, 2021 · Apt 9C
Closed — Violation dismissed
Show 40 more ↓
- ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Feb 4, 2019
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Feb 4, 2019
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ... at public hall, 1st story
Feb 4, 2019
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Feb 4, 2019
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Feb 4, 2019
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of vent pipe not seal between kitchen closet and bathroom wall located at apt 7b1, 7th story, 1st apartment from north at east , section at east
Nov 19, 2012 · Apt 7B1
Closed — Violation dismissed - ANon-hazardous
Properly secure the loose washbasin faucet in the bathroom located at apt 7b1, 7th story, 1st apartment from north at east , section at east
Nov 19, 2012 · Apt 7B1
Closed — Violation dismissed - BHazardous
Provide adequate supply of cold water for the fixtures washbasin in the bathroom located at apt 7b1, 7th story, 1st apartment from north at east
Nov 19, 2012 · Apt 7B1
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 7b1, 7th story, 1st apartment from north at east
Nov 19, 2012 · Apt 7B1
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 7b1, 7th story, 1st apartment from north at east
Aug 17, 2012 · Apt 7B1
Closed — Violation closed - BHazardous
Properly repair the broken or defective balance spring at bottom sash window in the 1st room from east located at apt 7e1, 7th story, 1st apartment from west at north , section at west
Apr 27, 2012 · Apt 7E1
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 15b, 15th story, 1st apartment from west at north , section at east
Oct 2, 2011 · Apt 15B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 3rd room from east at north located at apt 15b, 15th story, 1st apartment from west at north , section at east
Oct 2, 2011 · Apt 15B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood arpons at the windows in the 3rd room from east at north located at apt 15b, 15th story, 1st apartment from west at north , section at east
Oct 2, 2011 · Apt 15B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood window frames in the 3rd room from east at north located at apt 15b, 15th story, 1st apartment from west at north , section at east
Oct 2, 2011 · Apt 15B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 3rd room from east at north located at apt 15b, 15th story, 1st apartment from west at north , section at east
Oct 2, 2011 · Apt 15B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 3rd room from east at north located at apt 15b, 15th story, 1st apartment from west at north , section at east
Oct 2, 2011 · Apt 15B
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at the north wall in the 2nd room from east at north located at apt 15b, 15th story, 1st apartment from west at north , section at east
Oct 2, 2011 · Apt 15B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 2nd room from east at north located at apt 15b, 15th story, 1st apartment from west at north , section at east
Oct 2, 2011 · Apt 15B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 2nd room from east at north located at apt 15b, 15th story, 1st apartment from west at north , section at east
Oct 2, 2011 · Apt 15B
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1d, 1st story, 2nd apartment from west at north
May 15, 2009 · Apt 1D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the 1st room from north at west located at apt 1d, 1st story, 2nd apartment from west at north
May 15, 2009 · Apt 1D
Closed — Violation dismissed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate in the entire apartment located at apt 1d, 1st story, 2nd apartment from west at north
May 15, 2009 · Apt 1D
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 7b1, 7th story, 1st apartment from west at north
Jul 9, 2008 · Apt 7B1
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... ceiling (approx 18 sq ft. in the bathroom located at apt 7b1, 7th story, 1st apartment from west at north
Jul 9, 2008 · Apt 7B1
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls & ceiling, in the bathroom located at apt 6e, 6th story, 1st apartment from west at north
Jul 21, 2006 · Apt 6E
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north wall in the kitchen located at apt 7e1, 7th story, 1st apartment from west at north
Aug 30, 2005 · Apt 7E1
Closed — Violation dismissed - BHazardous
Replace with new the missing face plate at electrical outlet at north in the kitchen located at apt 7b1, 7th story, 1st apartment from north at east
Jul 16, 2005 · Apt 7B1
Closed — Violation dismissed - ANon-hazardous
Refit door in the entrance located at apt 7b1, 7th story, 1st apartment from north at east
Jul 16, 2005 · Apt 7B1
Closed — Violation dismissed - BHazardous
Provide an adequate supply of gas to the fixtures stove in the kitchen located at apt 7b1, 7th story, 1st apartment from north at east
Jul 16, 2005 · Apt 7B1
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective door at east closet in the kitchen located at apt 7b1, 7th story, 1st apartment from north at east
Jul 16, 2005 · Apt 7B1
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... ceiling in the 1st room from east at south located at apt 7b1, 7th story, 1st apartment from north at east
Jul 16, 2005 · Apt 7B1
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... ceiling and walls at north and south in the 1st room from east at north located at apt 7b1, 7th story, 1st apartment from north at east
Jul 16, 2005 · Apt 7B1
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective counter balances at north 1 window sashes in the 1st room from east at north located at apt 7b1, 7th story, 1st apartment from north at east
Jul 16, 2005 · Apt 7B1
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective chime at door in the entrance located at apt 7b1, 7th story, 1st apartment from north at east
Jul 16, 2005 · Apt 7B1
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 7b1, 7th story, 1st apartment from north at east
Jul 16, 2005 · Apt 7B1
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the entire apartment located at apt 7b1, 7th story, 1st apartment from north at east
Jul 16, 2005 · Apt 7B1
Closed — Violation dismissed - BHazardous
Provide an adequate supply of gas to the fixtures cooking range at kitchen in the kitchen located at apt 7b1, 7th story, 1st apartment from north at east
Jun 10, 2005 · Apt 7B1
Closed — Violation dismissed - ANon-hazardous
Refit closet door in the kitchen located at apt 7b1, 7th story, 1st apartment from north at east
Jun 10, 2005 · Apt 7B1
Closed — Violation dismissed - CImmediately hazardous
Trace and repair the source and abate the nuisance consisting of mold ... ceiling in the bathroom located at apt 7b1, 7th story, 1st apartment from north at east
Jun 10, 2005 · Apt 7B1
Closed — Violation dismissed
DOB building violations · 52
- Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)
Apr 22, 2023
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)
Aug 21, 2022
Dob violation - active - Failure to correct swarmp conditions (facade) facade required
Cycle 9a failure to correct swarmp conditions
Jul 27, 2022
Dob violation - active - Hazardous condition (facade) facade required
Cycle 9a unsafe report filed
Jun 14, 2022
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)
Jun 20, 2021
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)
Jun 29, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 25, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 25, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 25, 2019
Dob violation - resolved
Show 40 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Oct 25, 2019
Dob violation - resolved - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2018)
Mar 18, 2019
Dob violation - active - Plumbing none
The dob intends to revoke all approvals and permits under plumbing job #123165902 due to suspension of master plumbers license. stop all plumbing work under above mentioned permit and obtain a new master plumber to supersede the plumbing permit
Oct 21, 2018
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2017)
Mar 27, 2018
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 9, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2016)
Feb 16, 2017
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 29, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 29, 2016
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years(2015)
Jun 1, 2016
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 18, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 18, 2016
Dob violation - dismissed - Failure to submit eer none
Failure to submit an energy efficiency report in 2014 per ad. code sec. 28-308.4
Dec 31, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 18, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 18, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 19, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 19, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 19, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 20, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 20, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 20, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 20, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 28, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 28, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 28, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 28, 2009
Dob violation - resolved - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 27, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 27, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 27, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 27, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 3, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 3, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 3, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 3, 2005
Dob violation - resolved - Elevator elevatorrequired
1p14943
Apr 8, 2003
Dob violation - resolved - Elevator elevatorrequired
1p14944
Apr 8, 2003
Dob violation - resolved
ECB violations · 32
- Class - 3
Failure to post exterior building wall certificate as required under 1rcny 103-04.at time of inspection certificate was not posted in the lobby.remedy:post exterior wall condition certificate in lobby/vestibule
Jan 26, 2023
Resolve - Class - 2
3307.6.4.2.2 materials stored ontop of sws atoi of active jobsite observed sws@exp1&2.upon further rev/observation found storage of materials,planks debris&const materials on top of sws&drawings in site doesnt
Apr 18, 2022 · Penalty $2,400
Resolve - Class - 1
No record of daily insp of suspended scf performed by authorized [email protected] my insp of active site,i observed several unsafe&nonconforming conditions related to suspended scfs on roof@expv2:(1)missing shee
Apr 18, 2022 · Penalty $5,000
Resolve - Class - 1
Failure to maintain/display onsite doc required by ch33-noted:atoi of active jobsite,upon requesting to see following docs listed,contractorfailed to provide:(1)suspended scf completion insp letter.(2)daily ins
Apr 18, 2022
Resolve - Class - 2
Work contrary to ssp:atoi of active jobsite,upon reviewing ssp obsaerved following objections:(1)missing adj roof protection@610w111st as per ssp(2)missing adj roof protection@284bway as per ssp(3)tree protecti
Apr 18, 2022 · Penalty $625
Resolve - Class - 1
Work doesnt conform to approved const docs &or approved amendments-cd5:noted,atoi of active jobsite,upon reviewing cd5 for suspended scf,observed following objections:(1)frame setup&drops locations doesnt corre
Apr 18, 2022 · Penalty $2,500
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation #35332712r issued on 06/06/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.rem:comply with commissi
Jul 26, 2018 · Penalty $1,250
Resolve - Class - 2
Work without a permit.noted:alterations to the range to accomidate thepizza ovens was done without permits.permit #120252779 was taken for alteration typw 2 work,which did not include all work conducted.rem:obt
Jun 6, 2018
Resolve - Class - 1
Failure to maintain building in code-compliant manner.noted:famous famigila pizza has not propertly maintained the duct work.a fire was the result of the accumulation of debris and grease within the ductwork.re
Jun 6, 2018 · Penalty $312
Resolve - Class - 1
Unlawfully continued work while on notice of a swo.on 2/8/17@3:00pm&3/2/17@10am and 3/23/17@11:59 am respondent listed above conducted inspections under permit#122-913-053 while swo notice was in effect.swo iss
Apr 19, 2017 · Penalty $4,800
Resolve
Show 22 more ↓
- Class - 1
Failure to maintain bldg in code-compliant manner. re: prohibited material at the time of my inspection 10:10am at above address on 4/4/16 i observed in cellar laundry room 6 commercial dryers that have gas
Apr 4, 2016 · Penalty $1,000
Active - Class - 1
Gas being supplied to bldg w/o inspection and certification by dob. atthe time of inspection 10:10am on 4-4-16 i observed at above address in store front cellar goes being supplied w/o authorizaiton or certifi
Apr 4, 2016
Resolve - Class - 1
Work w/o a permit re: gas piping. on my inspection at the above address at 2/25/16 at 3:30pm on 1st flr store and cellar understore 3 pizza shop on corner.gas pipe was insalled and changed with new pipe and fit
Feb 25, 2016 · Penalty $1,600
Resolve - Class - 1
Failure to new or alter plumbing system tested re: gas. on my inspec tion at the above address at 2/25/16 at 3:30 pm in cellar under store and pizza shop on corner. gas piping and fitting was installed and
Feb 25, 2016 · Penalty $1,000
Resolve - Class - 2
3310.8.3 partial swo issued at 2851 broadway933108.3 it shall be the responsibility of the site safety mgr or coordinator to inspect personally on a regular basis, specific areas & items on the const.or demolit
May 7, 2014 · Penalty $800
Resolve - Class - 1
Licensed rigger failed to ensure scaffold workers met minimum requirements. note: suspended scaffolds have been erected at exp #1 (broadway)& exp #4 (w 111 st) & in use at time of inspection. respondent failed
Dec 19, 2013 · Penalty $400
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments. benchwork is missing tie in as per plan. outrigger on stie on broadway and west 111th street.foreman on site.rmdy:conform to
Sep 25, 2013 · Penalty $250
Resolve - Class - 2
Failure to maintain adequate housekeeping. multiple debris on roof (brick,stone) rmdy: main adequate housekeeping.
Sep 25, 2013 · Penalty $400
Resolve - Class - 2
Rigger failed to name designated foreman. foreman on site mr pablo silva has no dob foreman crd. rmdy: comply with code.
Sep 25, 2013 · Penalty $400
Resolve - Class - 2
Bc3310.3 failur to have site safety plan and program as required.at time of inspection observed one rig on 11th street.conducting facade inspections with engineer.no site safety plan or program onsite.rmdy:
Jul 30, 2013 · Penalty $400
Resolve - Class - 3
B354 32a.15.40.50a.50b 50a remove waste oil from boiler rm 50b clean out door on chimney base hinges broken
May 29, 2009 · Penalty $100
Resolve - Class - 3
B354 32a.15.40.50a.50b.50c. 50a remove waste oil from boiler rm 50b boiler drain back of boiler corroded and leaking 50c clean out door on chimney base hinged
May 19, 2009 · Penalty $100
Resolve - Non-hazardous
Plumbing work without a permit. gas being supplied to building withoutinspection and certification by this department. observed new gas piping and meter bar located in apt. #13c. work was conducted but there
Oct 12, 2004 · Penalty $1,200
Resolve - Unknown
30i,73o. 30i loose plaster holes west wall top of hoistway.
Jan 27, 1996
Resolve - Unknown
05i,06h,19l,30m,31q,32q,35r,28h,15i. 05i south gate + saddle + roller holder 06h roller 30m falia plates 35r old equipment 15i basmt door + frame.
Jan 24, 1996
Resolve - Non-hazardous
02m,06l,11q,15l,18l,26m,35r,46l,47l,50f,58o,59o,74o. 06l exposed wiring.15l latches sliding gibs at bottom,bumpers etc.26m cover for music box.35r old equipment.46l tension.74o door top.
Apr 4, 1995 · Penalty $200
Resolve - Non-hazardous
02m,05i,11q,15l,15i,16m,18l,35r,58o,59o,50y,50y,74y. 05i-north gate . 15-latches,oils at bottom,bumpers etc. 15i-basmt.35r-old equipment.74ycar top.
Apr 4, 1995 · Penalty $200
Resolve - Non-hazardous
05l,03i,#05 gate #03 car enclosure, bottom.
Sep 11, 1991 · Penalty $75
Resolve - Non-hazardous
05l,22d,15l,#05 gate #15 bsmt. floor.
Sep 11, 1991
Resolve - Non-hazardous
08v 52l 25l 10l 21l 57o for new traction drive sheave
Jan 5, 1991 · Penalty $150
Resolve - Non-hazardous
05l 15l 57o for new traction drive sheave 15 bsmt door
Jan 5, 1991 · Penalty $150
Resolve - Non-hazardous
08v 52l 25l 10l 21l 570 for new traction drive sheave
Jan 5, 1991 · Penalty $150
Resolve
Complaints
- Paint/plaster
Wall
Mar 29, 2026 · Apt 6E
Close - Unsanitary condition
Mold
Mar 29, 2026 · Apt 6E
Close - Plumbing
Water supply
Mar 2, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 2, 2025 · Apt BLDG
Close - Unsanitary condition
Pests
Aug 29, 2023 · Apt 4G
Close - Plumbing
Steam pipe/riser
Jan 8, 2022 · Apt 9C
Close - Plumbing
Steam pipe/riser
Jan 7, 2022 · Apt 9C
Close - Paint/plaster
Ceiling
Jan 7, 2022 · Apt 9C
Close - Heat/hot water
Entire building
Dec 31, 2021 · Apt 11F
Close - Heat/hot water
Apartment only
Dec 10, 2021 · Apt 11F
Close
Show 40 more ↓
- Heat/hot water
Entire building
Nov 29, 2021 · Apt 11F
Close - Heat/hot water
Entire building
Nov 20, 2021 · Apt 11F
Close - Paint/plaster
Ceiling
Apr 29, 2021 · Apt 9C
Close - Safety
Smoke detector
Apr 29, 2021 · Apt 9C
Close - Heat/hot water
Entire building
Dec 5, 2020 · Apt 11F
Close - Heat/hot water
Entire building
Jan 17, 2020 · Apt 11F
Close - Heat/hot water
Entire building
Nov 13, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2019 · Apt 11F
Close - Heat/hot water
Entire building
Nov 12, 2018 · Apt 3D
Close - Heat/hot water
Entire building
Apr 4, 2017 · Apt 4F
Close - Plumbing
Water supply
Apr 4, 2017 · Apt 4F
Close - Heating
Heat related
Apr 11, 2013 · Apt 14C
Close - Heating
Heat related
Jan 25, 2013 · Apt NA
Close - Heating
Heat related
Jan 3, 2013 · Apt NA
Close - Plumbing
Water supply
Nov 13, 2012 · Apt 7B1
Close - Plumbing
Radiator
Nov 13, 2012 · Apt 7B1
Close - Plumbing
Radiator
Nov 13, 2012 · Apt 7B1
Close - General
Mold
Nov 13, 2012 · Apt 7B1
Close - Nonconst
Vermin
Nov 13, 2012 · Apt 7B1
Close - Nonconst
Vermin
Nov 13, 2012 · Apt 7B1
Close - General
Mailbox
Nov 13, 2012 · Apt 7B1
Close - Plumbing
Radiator
Nov 13, 2012 · Apt 7B1
Close - Plumbing
Radiator
Nov 13, 2012 · Apt 7B1
Close - Plumbing
Basin/sink
Nov 13, 2012 · Apt 7B1
Close - Plumbing
Bathtub/shower
Nov 13, 2012 · Apt 7B1
Close - General
Mold
Nov 13, 2012 · Apt 7B1
Close - Plumbing
Radiator
Aug 7, 2012 · Apt 7B1
Close - Plumbing
Toilet
Aug 7, 2012 · Apt 7B1
Close - Plumbing
Basin/sink
Aug 7, 2012 · Apt 7B1
Close - Electric
Wiring
Aug 7, 2012 · Apt 7B1
Close - General
Mold
Aug 7, 2012 · Apt 7B1
Close - General
Windows
Aug 7, 2012 · Apt 7B1
Close - General
Windows
Aug 7, 2012 · Apt 7B1
Close - Appliance
Refrigerator
Aug 7, 2012 · Apt 7B1
Close - General
Ventilation system
Aug 7, 2012 · Apt 7B1
Close - General
Cooking gas
Aug 7, 2012 · Apt 7B1
Close - General
Doors
Aug 7, 2012 · Apt 7B1
Close - Nonconst
Vermin
Aug 7, 2012 · Apt 7B1
Close - Nonconst
Vermin
Aug 7, 2012 · Apt 7B1
Close - General
Mold
Aug 7, 2012 · Apt 7B1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 1926
- Floors
- 16
- Residential units
- 151
- Building area
- 174,081 ft²
- Lot area
- 17,661 ft²
- Zoning
- R8
- Community board
- 109
- Council district
- 7
- Block / lot
- 1894 / 7501
- Assessed value
- $18,059,400
- Landmark / historic district
- Morningside Heights Historic District
HPD registration #123845, last renewed Sep 17, 2025.
Questions about 2849 Broadway
Who owns 2849 Broadway?
The owner of record in NYC Department of City Planning PLUTO data is Broadway 111 Street Condominium.
Does 2849 Broadway have violations?
Yes. NYC HPD has recorded 54 housing violations at this property.
Is 2849 Broadway rent stabilized?
NYC Department of Finance tax bills listed 25 rent-stabilized units here in 2024 (about 17% of its 151 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2849 Broadway built?
City records list 1926 as the year it was built.
How many apartments are in 2849 Broadway?
It has 151 residential units and 156 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.
