9 West 107 Street
Manhattan, NY 10025BBL 1-01843-0026Map
Owner of record: 9 West 107 Realty LLC
9 West 107 Street is a walk-up apartment building built in 1940 in Manhattan, 10025. It has 12 residential units across 5 floors. The owner of record is 9 West 107 Realty LLC. HPD has recorded 170 housing violations here, most recently on March 7, 2026. 39 of the 50 most recent violations are still open. City tax records listed 12 rent-stabilized apartments here in 2024.
- HPD violations
- 170
- DOB violations
- 6
- ECB violations
- 9
- HPD complaints
- 197
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 170
- BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 9, 4th story, 1st apartment from east at south
Mar 7, 2026 · Apt 9
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 9, 4th story, 1st apartment from east at south
Mar 7, 2026 · Apt 9
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 9, 4th story, 1st apartment from east at south
Mar 7, 2026 · Apt 9
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the 6th room from north located at apt 9, 4th story, 1st apartment from south at west
Oct 27, 2025 · Apt 9
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the 5th room from north, the bathroom located at apt 9, 4th story, 1st apartment from south at west
Oct 27, 2025 · Apt 9
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 2nd closet from north at east wall wall, east wall in the 2nd room from north located at apt 9, 4th story, 1st apartment from south at west
Oct 27, 2025 · Apt 9
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the baseboard at south wall, baseboard at south wall in the 7th room from north located at apt 9, 4th story, 1st apartment from south at west
Oct 27, 2025 · Apt 9
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 9, 4th story, 1st apartment from south at west
Oct 27, 2025 · Apt 9
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 9, 4th story, 1st apartment from south at west
Oct 27, 2025 · Apt 9
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 9, 4th story, 1st apartment from south at west
Oct 27, 2025 · Apt 9
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north located at apt 9, 4th story, 1st apartment from south at west
Oct 27, 2025 · Apt 9
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective marble saddles at the north and south entrance in the kitchen located at apt 9, 4th story, 1st apartment from south at west
Oct 27, 2025 · Apt 9
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 9, 4th story, 1st apartment from south at west
Oct 27, 2025 · Apt 9
Open — Nov sent out - ANon-hazardous
Properly secure the loose upper escutcheon plate at the east steam riser in the private hallway located at apt 9, 4th story, 1st apartment from south at west
Oct 27, 2025 · Apt 9
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 7th room from north located at apt 9, 4th story, 1st apartment from south at west
Oct 27, 2025 · Apt 9
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st door from north at east wall, 1st door from north at east wall, 1st door from north at east wall, 1st door from north at east wall in the foyer located at apt 9, 4th story, 1st apartment from south at west
Oct 27, 2025 · Apt 9
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, south wall, baseboard at south wall, east wall, south wall, east wall in the 7th room from north located at apt 9, 4th story, 1st apartment from south at west
Oct 27, 2025 · Apt 9
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the baseboard at south wall in the 7th room from north located at apt 9, 4th story, 1st apartment from south at west
Oct 27, 2025 · Apt 9
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... more than 10 square feet at the west wall and the ceiling in the bathroom located at apt 9, 4th story, 1st apartment from south at west
Oct 27, 2025 · Apt 9
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the foyer located at apt 9, 4th story, 1st apartment from south at west
Oct 27, 2025 · Apt 9
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 7th room from north located at apt 9, 4th story, 1st apartment from south at west
Oct 27, 2025 · Apt 9
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the foyer located at apt 9, 4th story, 1st apartment from south at west
Oct 27, 2025 · Apt 9
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the kitchen located at apt 9, 4th story, 1st apartment from south at west
Oct 27, 2025 · Apt 9
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 2nd window frame from south at west wall in the 2nd room from north located at apt 9, 4th story, 1st apartment from south at west
Oct 27, 2025 · Apt 9
Open — Nov sent out - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination at light fixture at ceiling at public hall, 3rd story
Sep 24, 2025
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from north at east wall, 1st door frame from north at east wall in the bathroom located at apt 9, 4th story, 1st apartment from south at west
Aug 29, 2025 · Apt 9
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 1st door frame from east at south wall, east wall, west wall in the 6th room from north located at apt 9, 4th story, 1st apartment from south at west
Aug 29, 2025 · Apt 9
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 7th room from north located at apt 9, 4th story, 1st apartment from south at west
Aug 29, 2025 · Apt 9
Open — Lead docs submitted, acceptable - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, south wall, west wall, 2nd window frame from west at north wall, 1st window frame from east at south wall in the 7th room from north located at apt 9, 4th story, 1st apartment from south at west
Aug 29, 2025 · Apt 9
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door frame, north wall, south wall, east wall, west wall, 1st window frame from west at north wall, 1st window frame from south at west wall in the 1st room from north located at apt 9, 4th story, 1st apartment from south at west
Aug 29, 2025 · Apt 9
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st window frame from south at west wall in the 2nd room from north located at apt 9, 4th story, 1st apartment from south at west
Aug 29, 2025 · Apt 9
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 6th room from north located at apt 9, 4th story, 1st apartment from south at west
Aug 29, 2025 · Apt 9
Open — Lead docs submitted, acceptable - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, north wall, west wall, 1st window frame from east at south wall in the 5th room from north located at apt 9, 4th story, 1st apartment from south at west
Aug 29, 2025 · Apt 9
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall, south wall in the 5th room from north located at apt 9, 4th story, 1st apartment from south at west
Aug 29, 2025 · Apt 9
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall, 1st window frame from west at north wall, ceiling, baseboard at north wall in the 6th room from north located at apt 9, 4th story, 1st apartment from south at west
Aug 29, 2025 · Apt 9
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall in the 7th room from north located at apt 9, 4th story, 1st apartment from south at west
Aug 29, 2025 · Apt 9
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the 7th room from north located at apt 9, 4th story, 1st apartment from south at west
Aug 29, 2025 · Apt 9
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 9, 4th story, 1st apartment from south at west
Aug 29, 2025 · Apt 9
Open — Nov certified late - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the foyer located at apt 9, 4th story, 1st apartment from south at west
Aug 29, 2025 · Apt 9
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from north at east wall door in the 1st room from north located at apt 9, 4th story, 1st apartment from south at west
Aug 29, 2025 · Apt 9
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall, west wall, 2nd window frame from south at west wall, north wall, 1st closet from north at east wall door frame in the 2nd room from north located at apt 9, 4th story, 1st apartment from south at west
Aug 29, 2025 · Apt 9
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 9, 4th story, 1st apartment from south at west
Aug 29, 2025 · Apt 9
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the 6th room from north located at apt 9, 4th story, 1st apartment from south at west
Aug 29, 2025 · Apt 9
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 9, 4th story, 1st apartment from south at west
Aug 29, 2025 · Apt 9
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2023
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 3, 1st story, 2nd apartment from south at west
Jun 9, 2023 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 6, 2nd story, 1st apartment from north at east
Jan 16, 2023 · Apt 6
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 8, 3rd story, 1st apartment from north at east
Jun 28, 2022 · Apt 8
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective wood floor in the 7th room from north located at apt 8, 3rd story, 1st apartment from north at east
Jun 28, 2022 · Apt 8
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective wood floor in the 6th room from north located at apt 8, 3rd story, 1st apartment from north at east
Jun 28, 2022 · Apt 8
Open — First no access to re- inspect violation
DOB building violations · 6
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 12, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 12, 2021
Dob violation - dismissed - Construction other optional
C-construction other optional
Jun 6, 1996
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 9
- Class - 1
Unlawful acts: failure to comply with the commissioners order contained in summons/violations # 35542052x issued on 02/12/2021 and to file a certificate of correction pursuant to 28-201.1, comply with commissio
Feb 23, 2024 · Penalty $6,250
Resolve - Class - 1
Unlawful acts: failure to comply with the commissioners order contained in summons/violations # 35542052x issued on 02/12/2021 and to file a certificate of correction pursuant to 28-201.1, comply with commissio
Dec 21, 2023 · Penalty $2,500
Resolve - Class - 1
28-201.1 inadeuqate tenant protection plan.at the time of inspection observed the submitted tpp lacks specific means and methods under the aformentioned job number.protecting tenants on the fire safety and heal
Feb 12, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to maintain building in code compliant manner.no fire stopping.noted at time of inspection observed work had been performed under the aformentioned job number.the entire ceiling has been removed(fire st
Feb 12, 2021 · Penalty $2,500
Resolve - Class - 2
Failure to comply w/ commissioner's order contained in summons/violation#39030056j issued on 10/8/20 & to file certificate of correction pursuant to 28-201.1 & 1rcny102-01.failure to maintain bldg in code-compl
Dec 29, 2020
Resolve - Class - 1
Observed interior disrepair conditions in front & middle bedrooms wall & ceiling at apt # 8. approx. 3'-0" x 4'-0" section of ceiling fell and remaining ceiling loose with cracks in middle bedroom. also front b
Oct 8, 2020 · Penalty $1,250
Resolve - Class - 2
Work w/out a permit.work noted:@5th fl @ apt #12 removed partitions.build new wood frame.removed(ceiling)installed new(ceiling)repair fl joist @bathrm area.complete approx 50%.rem:stop all work make site safe.
Aug 21, 2015 · Penalty $400
Resolve - Non-hazardous
Work w/o a permit. work noted : remove & replacing rear fire escape. rehab of both 2nd floor aprts. new kithcen, bathrooms. remedy : stop all work file plans obtian all approvals & permit
Mar 16, 2002 · Penalty $500
Resolve - Non-hazardous
Failure to maintain exterior building wall & stoop defect is () rear parapet wall in need of repairs with loose, missing separating and falling bricks (@) front stoop in need of repair sase & steps separating
Nov 3, 1995 · Penalty $1,000
Resolve
Complaints
- Unsanitary condition
Pests
May 26, 2026 · Apt 9
Open - Flooring/stairs
Floor
May 26, 2026 · Apt 9
Open - Door/window
Window pane
May 26, 2026 · Apt 9
Open - Safety
Carbon monoxide detector
May 26, 2026 · Apt 9
Open - Flooring/stairs
Floor
Mar 17, 2026 · Apt 94THFL
Close - Unsanitary condition
Pests
Mar 17, 2026 · Apt 94THFL
Close - Heat/hot water
Entire building
Oct 27, 2025 · Apt 12
Close - Flooring/stairs
Floor
Oct 24, 2025 · Apt 9
Close - Paint/plaster
Wall
Oct 24, 2025 · Apt 9
Close - Unsanitary condition
Mold
Oct 24, 2025 · Apt 9
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Oct 24, 2025 · Apt 9
Close - Flooring/stairs
Floor
Oct 16, 2025 · Apt 9
Close - Unsanitary condition
Pests
Oct 16, 2025 · Apt 9
Close - Paint/plaster
Wall
Oct 16, 2025 · Apt 9
Close - Unsanitary condition
Mold
Oct 16, 2025 · Apt 9
Close - Flooring/stairs
Floor
Oct 16, 2025 · Apt 9
Close - Paint/plaster
Ceiling
Oct 16, 2025 · Apt 9
Close - Paint/plaster
Ceiling
Oct 16, 2025 · Apt 9
Close - Unsanitary condition
Pests
Oct 16, 2025 · Apt 9
Close - Electric
No lighting
Sep 25, 2025 · Apt 3RDFL
Close - Electric
No lighting
Sep 16, 2025 · Apt 3RDFLO
Close - Paint/plaster
Ceiling
Aug 28, 2025 · Apt 9
Close - Paint/plaster
Ceiling
Aug 28, 2025 · Apt 9
Close - Flooring/stairs
Floor
Aug 28, 2025 · Apt 9
Close - Heat/hot water
Entire building
Apr 1, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jan 18, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 2, 2023 · Apt 8
Close - Heat/hot water
Entire building
Jan 16, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 15, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 18, 2022 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
May 3, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 8, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 18, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 13, 2022 · Apt 8
Close - Unsanitary condition
Pests
Jan 26, 2022 · Apt 8
Close - Electric
Wiring
Jan 26, 2022 · Apt 8
Close - Appliance
Electric/gas range
Jan 26, 2022 · Apt 8
Close - Door/window
Window frame
Jan 26, 2022 · Apt 8
Close - Flooring/stairs
Floor
Jan 26, 2022 · Apt 8
Close - Plumbing
Radiator
Jan 26, 2022 · Apt 8
Close - Electric
Wiring
Jan 26, 2022 · Apt 8
Close - Plumbing
Toilet
Jan 26, 2022 · Apt 8
Close - Plumbing
Water supply
Jan 26, 2022 · Apt 8
Close - Flooring/stairs
Floor
Jan 26, 2022 · Apt 8
Close - Flooring/stairs
Floor
Aug 12, 2021 · Apt 8
Close - Flooring/stairs
Floor
Aug 12, 2021 · Apt 8
Close - Electric
Power outage
Feb 19, 2021 · Apt 4
Close - Heat/hot water
Entire building
Feb 19, 2021 · Apt 4
Close - Heat/hot water
Apartment only
Feb 19, 2021 · Apt 8
Close - Heat/hot water
Apartment only
Feb 1, 2021 · Apt 3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C4)
- Year built
- 1940
- Floors
- 5
- Residential units
- 12
- Building area
- 9,710 ft²
- Lot area
- 2,508 ft²
- Zoning
- R7-2
- Community board
- 107
- Council district
- 7
- Block / lot
- 1843 / 26
- Assessed value
- $580,500
- Landmark / historic district
- No
HPD registration #106319, last renewed Nov 19, 2025.
Questions about 9 West 107 Street
Who owns 9 West 107 Street?
The owner of record in NYC Department of City Planning PLUTO data is 9 West 107 Realty LLC.
Does 9 West 107 Street have violations?
Yes. NYC HPD has recorded 170 housing violations at this property.
Is 9 West 107 Street rent stabilized?
NYC Department of Finance tax bills listed 12 rent-stabilized units here in 2024 (about 100% of its 12 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 9 West 107 Street built?
City records list 1940 as the year it was built.
How many apartments are in 9 West 107 Street?
It has 12 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.