roofy

2074 Fredrick Douglass Bl

Manhattan, NY 10026BBL 1-01828-0003Map

Owner of record: 801 Associates,

2074 Fredrick Douglass Bl is a walk-up apartment building built in 1900 in Manhattan, 10026. It has 13 residential units across 5 floors. The owner of record is 801 Associates,. HPD has recorded 48 housing violations here, most recently on July 14, 2020. 3 of the 48 most recent violations are still open.

HPD violations
48
DOB violations
14
ECB violations
2
HPD complaints
67

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Jul 14, 2020

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 48

  • C

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 1c, 1st story, 1st apartment from north at east

    Jul 14, 2020 · Apt 1C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the bathroom located at apt 1c, 1st story, 1st apartment from north at east

    Jul 14, 2020 · Apt 1C

    Closed — Violation dismissed
  • B

    Arrange and make self-closing the doors bulkhead door to roof at public hall, 5th story

    May 16, 2014

    Open — Nov sent out
  • A

    Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor , at public hall, 1st story

    May 16, 2014

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box , at public hall, 1st story

    May 16, 2014

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    May 16, 2014

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective lower window sash spring balance in the bathroom located at apt 3c, 3rd story, 1st apartment from north at east

    Jul 26, 2013 · Apt 3C

    Closed — Violation dismissed
  • B

    Properly secure the loose in-line smoke detector hanging from ceiling in the 1st room from north at east located at apt 3c, 3rd story, 1st apartment from north at east

    Jul 26, 2013 · Apt 3C

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective door in the bathroom located at apt 3c, 3rd story, 1st apartment from north at east

    Jul 26, 2013 · Apt 3C

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective lower windoiw sash spring balance at fire escape window in the 2nd room from north at east located at apt 3c, 3rd story, 1st apartment from north at east

    Jul 26, 2013 · Apt 3C

    Closed — Violation dismissed
Show 38 more ↓
  • C

    Install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12. at public hall, 1st story

    Jul 26, 2013

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 2nd room from north at west, the bathroom , the 1st room from north at east, the 2nd room from north at east located at apt 3c, 3rd story, 1st apartment from north at east

    Mar 8, 2013 · Apt 3C

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 2nd room from north at east located at apt 3c, 3rd story, 1st apartment from north at east

    Nov 10, 2011 · Apt 3C

    Closed — Violation closed
  • B

    Abate the nuisance consisting of mice in the entire apartment located at apt 3c, 3rd story, 1st apartment from north at east

    Nov 10, 2011 · Apt 3C

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the 2nd room from north at west located at apt 3c, 3rd story, 1st apartment from north at east

    Nov 10, 2011 · Apt 3C

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective spring balance lower sash window in the 2nd room from north at east located at apt 3c, 3rd story, 1st apartment from north at east

    Nov 10, 2011 · Apt 3C

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 2nd room from north at east located at apt 3c, 3rd story, 1st apartment from north at east

    Nov 10, 2011 · Apt 3C

    Closed — Violation closed
  • B

    Replace with new the broken or defective base cabinet in the bathroom located at apt 3c, 3rd story, 1st apartment from north at east

    Nov 10, 2011 · Apt 3C

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, south wall in the bathroom located at apt 3c, 3rd story, 1st apartment from north at east

    Nov 10, 2011 · Apt 3C

    Closed — Violation closed
  • B

    Arrange and make self-closing the doors ... in the entrance located at apt 3c, 3rd story, 1st apartment from north at east

    Nov 10, 2011 · Apt 3C

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3c, 3rd story, 1st apartment from north at east

    Nov 10, 2011 · Apt 3C

    Closed — Violation closed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 3c, 3rd story, 1st apartment from north at east

    Nov 10, 2011 · Apt 3C

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3c, 3rd story, 1st apartment from north at east

    Oct 25, 2011 · Apt 3C

    Closed — Violation closed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 3c, 3rd story, 1st apartment from north at east

    Oct 25, 2011 · Apt 3C

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, north wall, south wall in the bathroom located at apt 3c, 3rd story, 1st apartment from north at east

    Oct 25, 2011 · Apt 3C

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 3c, 3rd story, 1st apartment from north at east

    Oct 25, 2011 · Apt 3C

    Closed — Violation closed
  • B

    Replace with new the missing covers for newel post at 2nd and 3rd storys at public hall

    Oct 20, 2011

    Closed — Violation closed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 3c, 3rd story, 1st apartment from north at east

    Oct 20, 2011 · Apt 3C

    Closed — Violation closed
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear center yard

    Oct 20, 2011

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic floor tile missing at public hall, 1st story

    Oct 20, 2011

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 3c, 3rd story, 1st apartment from north at east

    Oct 7, 2011 · Apt 3C

    Closed — Violation closed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 3c, 3rd story, 1st apartment from north at east

    Oct 7, 2011 · Apt 3C

    Closed — Violation closed
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... on the ceiling in the bathroom located at apt 3c, 3rd story, 1st apartment from north at east

    Oct 7, 2011 · Apt 3C

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the bathroom located at apt 3c, 3rd story, 1st apartment from north at east

    Oct 7, 2011 · Apt 3C

    Closed — Violation closed
  • B

    Replace with new the broken or defective mail boxes for all the tenants.

    May 12, 2011

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at lobby, 1st story

    May 12, 2011

    Open — Not complied with
  • B

    Properly repair the broken or defective mailbox for apt 5a at public hall, 1st story

    May 3, 2011

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at south, the bathroom located at apt 3c, 3rd story, 1st apartment from north at east

    Apr 10, 2011 · Apt 3C

    Closed — Violation closed
  • B

    M/d law abate the nuisance consisting of evidence of water leak at ceiling in the bathroom located at apt 3c, 3rd story, 1st apartment from north at east

    Apr 10, 2011 · Apt 3C

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, ceiling in the bathroom located at apt 3c, 3rd story, 1st apartment from north at east

    Apr 10, 2011 · Apt 3C

    Closed — Violation closed
  • B

    Properly secure the loose basbord radiator and its cover in the 1st room from east at north located at apt 3c, 3rd story, 1st apartment from north at east

    Apr 10, 2011 · Apt 3C

    Closed — Violation closed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 3c, 3rd story, 1st apartment from north at east

    Mar 6, 2011 · Apt 3C

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective wood door frame in the bathroom located at apt 2c, 2nd story, 1st apartment from north at east

    Apr 29, 2009 · Apt 2C

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2c, 2nd story, 1st apartment from north at east

    Apr 29, 2009 · Apt 2C

    Closed — Violation closed
  • B

    Properly repair the broken or defective buzzer intercom system at south wall in the 2nd room from east at north located at apt 2c, 2nd story, 1st apartment from north at east

    Apr 29, 2009 · Apt 2C

    Closed — Violation closed
  • A

    D26-11.01, 11.03, 11.05 adm code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the east & west courts east & west air shafts.

    Jun 19, 1979

    Closed — Violation closed
  • A

    D26-11.01, 11.03, 11.05 adm code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the north and south court yards.

    Jun 19, 1979

    Closed — Violation closed
  • A

    D26-11.01, 11.03, 11.05 adm code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yard & air shaft.

    Jun 19, 1979

    Closed — Violation closed

DOB building violations · 14

  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 6, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
Show 4 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed

ECB violations · 2

  • Class - 2

    Failure to comply w/the comm's order to file a cofc w/the dob.noted:respondent failed to correct the violating conditions file a cofc,pursuant to 28-204.2 for nov#348783666.rem:file cofc

    Apr 1, 2011

    Resolve
  • Class - 1

    Failure to main building in code compliant manner.note sidewalk with section in front of store entry door is cracked,missing sagging state of disrepair.temporary walkway is inadequate posing a danger to public

    Jan 5, 2011

    Resolve

Complaints

  • Plumbing

    Basin/sink

    May 21, 2024 · Apt 1A

    Close
  • Paint/plaster

    Wall

    May 21, 2024 · Apt 1A

    Close
  • Flooring/stairs

    Floor

    May 21, 2024 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    May 21, 2024 · Apt 1A

    Close
  • Heat/hot water

    Apartment only

    May 21, 2024 · Apt 1A

    Close
  • General

    Cooking gas

    Feb 25, 2020 · Apt 5A

    Close
  • Heat/hot water

    Apartment only

    Feb 25, 2020 · Apt 5A

    Close
  • Heat/hot water

    Entire building

    Feb 21, 2020 · Apt 3C

    Close
  • Heat/hot water

    Entire building

    Feb 21, 2020 · Apt BLDG

    Close
  • Appliance

    Electric/gas range

    Feb 20, 2020 · Apt 1C

    Close
Show 40 more ↓
  • Heat/hot water

    Apartment only

    Feb 20, 2020 · Apt 1C

    Close
  • Heat/hot water

    Entire building

    Feb 18, 2020 · Apt 3A

    Close
  • General

    Windows

    Jul 22, 2013 · Apt 3C

    Close
  • General

    Doors

    Feb 26, 2013 · Apt 3C

    Close
  • Heating

    Heat related

    Feb 26, 2013 · Apt 3C

    Close
  • Plumbing

    Water supply

    Nov 4, 2011 · Apt 3C

    Close
  • Nonconst

    Vermin

    Nov 4, 2011 · Apt 3C

    Close
  • Plumbing

    Water-leaks

    Nov 4, 2011 · Apt 3C

    Close
  • Paint/plaster

    Ceiling

    Nov 4, 2011 · Apt 3C

    Close
  • General

    Floor

    Nov 4, 2011 · Apt 3C

    Close
  • Paint/plaster

    Wall

    Nov 4, 2011 · Apt 3C

    Close
  • General

    Windows

    Nov 4, 2011 · Apt 3C

    Close
  • General

    Windows

    Nov 4, 2011 · Apt 3C

    Close
  • Appliance

    Electric/gas range

    Oct 21, 2011 · Apt 2C

    Close
  • General

    Doors

    Oct 21, 2011 · Apt 2C

    Close
  • General

    Doors

    Oct 21, 2011 · Apt 2C

    Close
  • General

    Cabinet

    Oct 21, 2011 · Apt 2C

    Close
  • Paint/plaster

    Ceiling

    Oct 5, 2011 · Apt 3C

    Close
  • General

    Mold

    Oct 5, 2011 · Apt 3C

    Close
  • Plumbing

    Water-leaks

    Oct 5, 2011 · Apt 3C

    Close
  • Nonconst

    Smoke detector

    Aug 8, 2011 · Apt 3C

    Close
  • General

    Mailbox

    May 10, 2011 · Apt 4A

    Close
  • General

    Mailbox

    May 5, 2011 · Apt 4A

    Close
  • General

    Mailbox

    Apr 30, 2011 · Apt 4A

    Close
  • General

    Mailbox

    Apr 30, 2011 · Apt 4A

    Close
  • General

    Mailbox

    Apr 20, 2011 · Apt 5A

    Close
  • Heating

    Heat related

    Mar 20, 2011 · Apt 1C

    Close
  • Nonconst

    Smoke detector

    Mar 20, 2011 · Apt 3C

    Close
  • Heating

    Heat related

    Mar 20, 2011 · Apt 3C

    Close
  • Heating

    Heat related

    Mar 20, 2011 · Apt 2C

    Close
  • Heating

    Heat related

    Mar 17, 2011 · Apt 3C

    Close
  • Nonconst

    Smoke detector

    Mar 1, 2011 · Apt 3C

    Close
  • Construction

    Pavement

    Apr 13, 2010 · Apt BLDG

    Close
  • Paint/plaster

    Ceiling

    Nov 28, 2009 · Apt 2C

    Close
  • Plumbing

    Water-leaks

    Nov 28, 2009 · Apt 2C

    Close
  • Plumbing

    Sewer

    Nov 28, 2009 · Apt 2C

    Close
  • Nonconst

    Rubbish

    Sep 14, 2009 · Apt 1C

    Close
  • Nonconst

    Rubbish

    Jul 9, 2009 · Apt 4A

    Close
  • General

    Doors

    Jul 9, 2009 · Apt 4A

    Close
  • Nonconst

    Rubbish

    Jun 18, 2009 · Apt 1C

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C7)
Year built
1900
Floors
5
Residential units
13
Building area
9,362 ft²
Lot area
2,523 ft²
Zoning
R8A
Community board
110
Council district
9
Block / lot
1828 / 3
Assessed value
$1,028,700
Landmark / historic district
No

HPD registration #122530, last renewed Oct 31, 2025.

Questions about 2074 Fredrick Douglass Bl

Who owns 2074 Fredrick Douglass Bl?

The owner of record in NYC Department of City Planning PLUTO data is 801 Associates,.

Does 2074 Fredrick Douglass Bl have violations?

Yes. NYC HPD has recorded 48 housing violations at this property.

Is 2074 Fredrick Douglass Bl rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 2074 Fredrick Douglass Bl built?

City records list 1900 as the year it was built.

How many apartments are in 2074 Fredrick Douglass Bl?

It has 13 residential units and 15 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.