2080 8 Avenue
Manhattan, NY 10026BBL 1-01828-0063Map
Owner of record: Genesis Fslm Partners LLC
2080 8 Avenue is an elevator apartment building built in 2010 in Manhattan, 10026. It has 30 residential units across 11 floors. The owner of record is Genesis Fslm Partners LLC. HPD has recorded 30 housing violations here, most recently on September 26, 2026. 13 of the 30 most recent violations are still open. City tax records listed 30 rent-stabilized apartments here in 2024.
- HPD violations
- 30
- DOB violations
- 20
- ECB violations
- 33
- HPD complaints
- 71
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 30
- BHazardous
Properly repair or replace the broken or defective spring balance at window sash at east wall in the 1st room from north located at apt 2a, 2nd story, 1st apartment from north at east
Sep 26, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall in the 1st room from north located at apt 2a, 2nd story, 1st apartment from north at east
Sep 26, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective ceramic floor tile are defective in the kitchen located at apt 2a, 2nd story, 1st apartment from north at east
Sep 26, 2026 · Apt 2A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department wood base board at eastwall in the 1st room from north at east located at apt 2a, 2nd story, 1st apartment from north at east
Jul 13, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 2a, 2nd story, 1st apartment from north at east
Jul 13, 2026 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door frame in the entrance located at apt 2a, 2nd story, 1st apartment from north at east
Jul 13, 2026 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east
Jul 13, 2026 · Apt 2A
Open — False certification - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from north at east located at apt 2a, 2nd story, 1st apartment from north at east
Jul 13, 2026 · Apt 2A
Open — False certification - BHazardous
Properly repair with similar material the broken or defective caulking around bathtub in the 1st bathroom from north located at apt 2a, 2nd story, 1st apartment from north at east
Jul 13, 2026 · Apt 2A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective caulking around bathtub in the 2nd bathroom from north located at apt 2a, 2nd story, 1st apartment from north at east
Jul 13, 2026 · Apt 2A
Closed — Violation closed
Show 20 more ↓
- BHazardous
Properly repair or replace the broken or defective spring balance at lower sash window at east wall in the 1st room from north at east located at apt 2a, 2nd story, 1st apartment from north at east
Jul 13, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective defective electrical outlet at north and east wall in the 1st room from north located at apt 11c, 11th story, 1st apartment from west at north
Jun 8, 2026 · Apt 11C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 7th story
Jun 8, 2026
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant materials at ceiling at public hall, 7th story
Jun 8, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at vestibule door , 1st story
May 27, 2026
Closed — Violation closed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures throughout in the entire apartment located at apt 4c, 4th story, 2nd apartment from south at west
May 23, 2026 · Apt 4C
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling and in walls in the entire apartment located at apt 4c, 4th story, 1st apartment from south at west
May 3, 2026 · Apt 4C
Open — First no access to re- inspect violation - BHazardous
Remove all obstructions and repair all defects in at wasteline at wash basin in the bathroom located at apt 4c, 4th story, 1st apartment from south at west
May 3, 2026 · Apt 4C
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective base cabinet door at washbasin in the bathroom located at apt 4c, 4th story, 1st apartment from south at west
May 3, 2026 · Apt 4C
Open — Violation will be reinspected - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 4c, 4th story, 1st apartment from south at west
May 3, 2026 · Apt 4C
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at vestibule door at public hall, 1st story
May 3, 2026
Closed — Violation closed - ANon-hazardous
Properly repair or replace the broken or defective latch set at vestibule door at public hall, 1st story
May 3, 2026
Open — Violation will be reinspected - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
May 3, 2026
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 4c, 4th story, 1st apartment from south at west
May 3, 2026 · Apt 4C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling above window , the second window from north at east in the 1st room from north at east located at apt 9a, 9th story
Feb 10, 2023 · Apt 9A
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling above window , the second window from north at east in the 1st room from north at east located at apt 9a, 9th story, 1st apartment from north at east
Feb 10, 2023 · Apt 9A
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 20, 2015
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
Aug 2, 2015
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. at public hall, 1st story
Aug 2, 2015
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st story
Aug 2, 2015
Closed — Violation closed
DOB building violations · 20
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 14, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 13, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 13, 2017
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 22, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 22, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 1, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 1, 2011
Dob violation - resolved - Construction other optional
C-construction other optional
Jun 29, 2009
Dob violation - dismissed
Show 10 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Jun 13, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 33
- Class - 2
Failure to maintain building exteiror walls.facade and appurtenances note at the time of my inspection view at exposure 1 west elevations damaged panel at 3 floor window sill crack at 3 and 3 floor also observe
Mar 19, 2021 · Penalty $1,250
Resolve - Class - 1
Owner failed to repair facade within the recommended time given by qewi.as noted:at the time of inspection defective condition were observedon exposure#1:such as cracks and spalling at several locations in maso
Jan 11, 2021
Resolve - Class - 2
Failure to maintain exterior building walls and appurtenances.as notedat time of inspection i observed on exposure#2 north elevation:horizontal crack in stucco facade at the 11th floor height.rem:maintain exter
Jan 11, 2021 · Penalty $1,250
Resolve - Class - 2
Failed to notify dept prior to use/inst c-hooks. noted: no notification for suspended scaffold c-hook at exposure #3. remedy: notify the dept.
Oct 7, 2010 · Penalty $800
Resolve - Class - 1
Failed to file evidence of disability insurance (1774651) expired at 10/1/10. suspended scaffolds at exposure #3. workers on scaffold partial stop work order for suspended scaffold issued pursuant to 28-207.2 &
Oct 7, 2010 · Penalty $1,250
Resolve - Class - 1
Licensed rigger failed to ensure scaffold worker met minimum requirements. noted: no certificate of fitness for suspended scaffold workers german sari,pedro mejia & otto. workers on suspended scaffold at exposu
Oct 7, 2010 · Penalty $1,600
Resolve - Class - 1
Licensed rigger failed to name designated foreman. noted: no designated foreman at job site at time of inspection. suspended scaffold at exposure #3 partial stop work order issued for suspended scaffold pursuan
Oct 7, 2010 · Penalty $1,600
Resolve - Class - 2
Sec. 3301.2 failure to safeguard public & property affected by construction operations - noted: at north side of building elevation 2 installing stucco insulation ( ) are scattered everywhere.
Sep 3, 2010
Resolve - Class - 1
Use of supported scaffold w.o a scaffold user certificate. observed workers working on a supported scaffold at 11th floor level. upon request 1 worker failed to provide 4hr scaffold user card. remedy: discontin
Aug 26, 2010 · Penalty $8,000
Resolve - Class - 1
Sec 3314.8 misc viol: fail to provide guard rail & toe boards on supported scaffolding. observed approx 10 workers are working on a supported scaffold at 11th floor level. no toe boards have been installed. the
Aug 26, 2010 · Penalty $1,600
Resolve
Show 23 more ↓
- Class - 2
Failure to safeguard all persons & property affected by construction operations. observed a worker using safety strap or fall arrest system on 5th fl at the edge of the building. the safety strap is found damag
Jul 28, 2010 · Penalty $6,000
Resolve - Class - 2
Sec. 3314.4.3 failure to perform daily inspection of supported scaffold in a daily record. approx 100ft scaffold has been installed. as per ss manager no daily record has not been maintained since 7/17/10.
Jul 28, 2010 · Penalty $800
Resolve - Class - 2
Sec. 3301.9.6 failure to post contractors sign. approx 100' high supported scaffold has been erected on the sidewalk shed w/o posting the required sign. remedy: comply with the code.
Jul 28, 2010
Resolve - Class - 2
Failure to post dot permits - upon inspection, construction work in progress. at time of inspection noted all dot permits expired on 07-01-10. remedy: obtain and post updated dot permits.
Jul 6, 2010
Resolve - Class - 2
Work contrary to approved plan - upon inspection, approx. 60 ft high pipe scaffolding erected on top of sidewalk shed deck. as per approved plan of the sidewalk shed no scaffolding exists or allowed on the deck
Jul 6, 2010
Resolve - Class - 2
Failure to maintain adequate housekeeping - upon inspection construction work in progress, the bldg is up to roof. at time of inspection noted debris like pcs of concrete, block and wood accumulated on the flr
Jun 1, 2010
Resolve - Class - 1
Sec. 28-103.8. matters not provided for - upon inspection constructionwork in progress, the bldg up to roof. at time of inspection noted that as per site safety managers log the roof slab has been poured on
Jun 1, 2010 · Penalty $1,600
Resolve - Class - 2
Matters not provided for - inadequate record keeping - upon inspectionnoted: safety straps installed embedded in concrete in all flrs of thebldg. as per dob commissioner notice the installation log for safety
Jun 1, 2010
Resolve - Class - 1
Sec. 3303.4.5. storage of materials at the edge of the bldg - upon inspection noted many palates of concrete block have been stored on 10th and 11th flr of the bldg less than 5' from the edge of the flrs.
Jun 1, 2010 · Penalty $1,600
Resolve - Class - 1
Sec. 3301.2. failure to maintain safety measures - holes on flrs not properly covered - upon inspection noted: approx 15" dia circular holes on 10 and 11th flr of the bldg near exp 4 not properly covered.
Jun 1, 2010 · Penalty $8,000
Resolve - Class - 2
Sec. 3310.3. failure to comply w/site safety plan and program - upon inspection construction work in progress. at time of inspection noted horizontal safety netting has been provided at 9th flr. all stripping
May 24, 2010
Resolve - Class - 2
Sec bc 3301.7 misc viol: fail to provide p.e approved design drawing. as noted: at time of inspection on a active const site bldg up to 9 stories concrete operation improper const site, at fl 7 exp 2 & 3 a wo
Apr 20, 2010 · Penalty $400
Resolve - Class - 2
Work does not conform to approved construction documents/amendments as noted: at time of inspection on a active const site, bldg up to 9 stories at cellar level there is no water valve to hook up fire house o
Apr 20, 2010 · Penalty $250
Resolve - Class - 1
Sec bc 3307.8 misc viol: standard guardrail. noted: provided. at 4th fl elevator shaft two 2 x 4" with a re-shore at center as support (not good) no toe board. remedy: provide guardrail system top med rail & to
Apr 19, 2010 · Penalty $2,400
Resolve - Class - 1
Reshores not secured within 10 ft of edge of bldg. noted: at 5th fl & 6th fl - east/west ends approx 15 reshores have not been secured within 10 ft as required. remedy: secure all reshores forthwith
Apr 19, 2010 · Penalty $2,400
Resolve - Class - 1
Sec 3303.12 misc viol: hoist for readiness not provided. noted: bldg is at the 9th fl (78') forming work at this floor was ongoing no hoist for readiness- hoist work at east end of bldg has began at 1st fl. rem
Apr 19, 2010 · Penalty $1,600
Resolve - Class - 2
Sec. 28-105.12.2. plans/work non-conforming. noted: site safety plan does not indicate excavator of grade level - site safety plans indicate a gate which has not been installed or removed. remedy: conform to
Mar 16, 2010 · Penalty $800
Resolve - Class - 1
Failure to enclose machinery - noted: excavator at entrance of job site exposed to public - partially blocking egress-ingress danger to public. remedy: stop all use of excavator - provide protection as per site
Mar 16, 2010 · Penalty $1,600
Resolve - Class - 1
Failure to safeguard public and property affected by construction operations: noted at front of construction site gate is open - endangeringpublic, excavator is being used while public is walking by,pedestrian
Mar 16, 2010 · Penalty $2,400
Resolve - Class - 1
Failure to have site safety manager or coordinator present as required. as noted: at time of inspection at above active construction site observed work was working on site (chopping concrete) and site safety
Feb 2, 2010 · Penalty $2,400
Resolve - Class - 2
Sec. 3307.4. failure to provide warning lights on barricade as noted: at time of inspection at above active construction excavation in progress observed timber barricade occupied 1 lane of traffic front of site
Jan 12, 2010
Resolve - Class - 2
Failure to notify dob w/i 24-48 hrs of the start of excavation. @ timeof inspection at above active construction site observed site partially excavated and excavation work in progress as per dob record there is
Jan 12, 2010
Resolve - Class - 2
Work does not conform to approved site safety plan. noted: at time of inspection at above active construction site observed excavation in progress. there's no construction fence provided at rear of site as
Jan 12, 2010
Resolve
Complaints
- Door/window
Window frame
Sep 25, 2026 · Apt 2A
Close - Unsanitary condition
Pests
Sep 25, 2026 · Apt 2A
Close - Paint/plaster
Ceiling
Sep 25, 2026 · Apt 2A
Close - Unsanitary condition
Mold
Sep 25, 2026 · Apt 2A
Close - Unsanitary condition
Mold
Jul 6, 2026 · Apt 2A
Close - Door/window
Door frame
Jul 6, 2026 · Apt 2A
Close - Unsanitary condition
Pests
Jul 6, 2026 · Apt 2A
Close - Safety
Carbon monoxide detector
Jul 6, 2026 · Apt 2A
Close - Door/window
Window frame
Jul 6, 2026 · Apt 2A
Close - Water leak
Damp spot
Jul 6, 2026 · Apt 2A
Close
Show 40 more ↓
- Electric
Outlet/switch
Jun 4, 2026 · Apt 11C
Close - Electric
Power outage
May 23, 2026 · Apt 4C
Close - Paint/plaster
Wall
May 23, 2026 · Apt 4C
Close - Plumbing
Bathtub/shower
May 23, 2026 · Apt 4C
Close - Electric
Power outage
May 1, 2026 · Apt APARTM
Close - Plumbing
Basin/sink
May 1, 2026 · Apt APARTM
Close - General
Cabinet
May 1, 2026 · Apt APARTM
Close - Plumbing
Bathtub/shower
May 1, 2026 · Apt APARTM
Close - Electric
Power outage
Apr 23, 2026 · Apt 4C
Close - Plumbing
Bathtub/shower
Apr 23, 2026 · Apt 4C
Close - Plumbing
Basin/sink
Apr 23, 2026 · Apt 4C
Close - Electric
Outlet/switch
Feb 23, 2026 · Apt 11C
Close - General
Cabinet
Feb 23, 2026 · Apt 11C
Close - Heat/hot water
Entire building
Dec 30, 2025 · Apt BLDG
Close - Electric
Power outage
Dec 30, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 30, 2025 · Apt 11C
Close - Heat/hot water
Entire building
Dec 28, 2025 · Apt BLDG
Close - Plumbing
Basin/sink
Sep 16, 2025 · Apt 5B
Close - General
Ventilation system
Sep 16, 2025 · Apt 5B
Close - General
Bell/buzzer/intercom
May 20, 2025 · Apt 1C
Close - Electric
Outlet/switch
May 5, 2025 · Apt 11C
Close - Electric
Power outage
May 5, 2025 · Apt 11C
Close - Door/window
Door
Apr 12, 2025 · Apt 8A
Close - Heat/hot water
Apartment only
Feb 18, 2025 · Apt 1C
Close - Heat/hot water
Entire building
Feb 11, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 10, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 12, 2025 · Apt BLDG
Close - Water leak
Slow leak
Oct 25, 2024 · Apt 14E
Close - Electric
Outlet/switch
Oct 25, 2024 · Apt 14E
Close - Unsanitary condition
Pests
Oct 25, 2024 · Apt 14E
Close - Unsanitary condition
Pests
Oct 25, 2024 · Apt 14E
Close - Electric
Lighting
Oct 25, 2024 · Apt 14E
Close - Plumbing
Bathtub/shower
Oct 25, 2024 · Apt 14E
Close - Electric
Lighting
Oct 25, 2024 · Apt 14E
Close - Electric
Lighting
Oct 25, 2024 · Apt 14E
Close - General
Cabinet
Oct 25, 2024 · Apt 14E
Close - Heat/hot water
Entire building
Oct 16, 2024 · Apt BLDG
Close - Elevator
Maintenance
Jul 1, 2024 · Apt BLDG
Close - Safety
Fire escape
Jul 1, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jul 1, 2024 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2010
- Floors
- 11
- Residential units
- 30
- Building area
- 35,058 ft²
- Lot area
- 4,850 ft²
- Zoning
- R8A
- Community board
- 110
- Council district
- 9
- Block / lot
- 1828 / 63
- Assessed value
- $1,603,350
- Landmark / historic district
- No
HPD registration #143404, last renewed Jul 9, 2026.
Questions about 2080 8 Avenue
Who owns 2080 8 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Genesis Fslm Partners LLC.
Does 2080 8 Avenue have violations?
Yes. NYC HPD has recorded 30 housing violations at this property.
Is 2080 8 Avenue rent stabilized?
NYC Department of Finance tax bills listed 30 rent-stabilized units here in 2024 (about 100% of its 30 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2080 8 Avenue built?
City records list 2010 as the year it was built.
How many apartments are in 2080 8 Avenue?
It has 30 residential units and 31 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.