155 East 96 Street
Manhattan, NY 10128BBL 1-01624-0021Map
Owner of record: 96th Street Realty LLC
155 East 96 Street is an elevator apartment building built in 1910 in Manhattan, 10128. It has 40 residential units across 5 floors. The owner of record is 96th Street Realty LLC. HPD has recorded 16 housing violations here, most recently on February 1, 2022. 4 of the 16 most recent violations are still open. City tax records listed 39 rent-stabilized apartments here in 2024.
- HPD violations
- 16
- DOB violations
- 16
- ECB violations
- 9
- HPD complaints
- 107
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 16
- BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 4g, 4th story, 3rd apartment from west at north
Feb 1, 2022 · Apt 4G
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 4g, 4th story, 3rd apartment from west at north
Feb 1, 2022 · Apt 4G
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective , in the entrance located at apt 4g, 4th story, 3rd apartment from west at north
Feb 1, 2022 · Apt 4G
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Mar 3, 2020
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Mar 3, 2020
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Mar 3, 2020
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Mar 3, 2020
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Mar 3, 2020
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors .. in the entrance located at apt 3h, 3rd story, 1st apartment from north at east
Feb 28, 2020 · Apt 3H
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
Feb 24, 2016
Closed — Violation closed
Show 6 more ↓
- BHazardous
Properly repair the broken or defective counter balance at first window from west at north wall in the 2nd room from east at north located at apt 2h, 2nd story, 1st apartment from north at east
Jan 30, 2013 · Apt 2H
Closed — Violation closed - BHazardous
Properly repair the broken or defective counter balance at first window from west at north wall in the 1st room from east at north located at apt 2h, 2nd story, 1st apartment from north at east
Jan 30, 2013 · Apt 2H
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at north, the private hallway , the 1st room from east at south, the 2nd room from east at north, the foyer located at apt 2h, 2nd story, 1st apartment from north at east
Jan 30, 2013 · Apt 2H
Open — Nov certified late - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at cellar
Dec 7, 2007
Open — Nov certified late - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system , at public hall, 1st story
Dec 7, 2007
Open — Nov certified late - CImmediately hazardous
Provide hot water at all hot water fixtures kitchen and bathroom 3 sty north apt 3g. , section '' ''
Mar 13, 1991 · Apt 3G
Open — Nov certified late
DOB building violations · 16
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 17, 2017
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 11, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 31, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 8, 2011
Dob violation - resolved
Show 6 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Oct 13, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 2, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 5, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 6, 2007
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - dismissed - Elevator elevatorrequired
(51) provide capacity plate inside elevator (1200 lbs)
Feb 21, 1989
Dob violation - resolved
ECB violations · 9
- Class - 1
Cease use, no door zone restrictor, remedy provide and install and contact nycdob for restore to service re-inspection, 2, in car phone not working remedy, repair.
Jun 30, 2020 · Penalty $1,250
Resolve - Non-hazardous
34a/50a 50-installed pressure controls independently with suphon connection for each control and install on 1 1/4 manifold piping
Jul 20, 2005 · Penalty $350
Resolve - Non-hazardous
7-21x11-16l11-55x11. 3-x-11 outside communiction 15-m-7 post certificate in car as per code 27-1004a or 27-1004b 21-x-11 3 floor 16-l-11 slams 1 floor.
Feb 10, 2003
Resolve - Non-hazardous
75u5,35o2,50y14,50f11,15a11,15q3,51j11. 3f002 clean motor room and remove carpet from floor, -15a 4th floor h/d slamming repair same, -15q provide cover lobby interlock
Mar 23, 1999 · Penalty $350
Resolve - Non-hazardous
30o,30#,32#,35p,22o,57o,15f, 32-cover off door 15-door closes 22-clean car top.
Jul 30, 1997
Resolve - Non-hazardous
57o, 35p, 28l, 08v, 25o,. 25 operator & top of car.
Jul 25, 1995
Resolve - Non-hazardous
35p,33p,50o.
Oct 21, 1994 · Penalty $100
Resolve - Non-hazardous
02l,11q,15m,28h,39l,73u. 15 floor #'s.
Feb 8, 1994 · Penalty $100
Resolve - Non-hazardous
73#,74#,22d,31q,15#,73o,35i,28h,62m,74l,73 perform 5yr test properly tag device and file elv3 form 74 basement key cut off is elev install without permit 15 proper push plate 35 walls 62 toe guard 74 work light
Feb 19, 1992 · Penalty $360
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Aug 12, 2026 · Apt BLDG
Close - Electric
Power outage
May 20, 2026 · Apt 1F
Close - Heat/hot water
Apartment only
Jan 24, 2026 · Apt 4G
Close - Heat/hot water
Entire building
Jan 22, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 14, 2023 · Apt 3H
Close - Heat/hot water
Apartment only
Dec 31, 2022 · Apt 3H
Close - Heat/hot water
Apartment only
Dec 22, 2022 · Apt 2C
Close - Heat/hot water
Entire building
Mar 9, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 14, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 3, 2022 · Apt ALL
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Jan 26, 2022 · Apt 4G
Close - Heat/hot water
Apartment only
Jan 14, 2022 · Apt 3H
Close - Heat/hot water
Entire building
Dec 29, 2021 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 19, 2021 · Apt 3H
Close - Paint/plaster
Wall
Dec 6, 2021 · Apt 1F
Close - Unsanitary condition
Pests
Dec 6, 2021 · Apt 1F
Close - Paint/plaster
Ceiling
Dec 6, 2021 · Apt 1F
Close - Heat/hot water
Apartment only
Nov 29, 2021 · Apt 3H
Close - Heat/hot water
Entire building
Nov 19, 2021 · Apt 3H
Close - Heat/hot water
Entire building
Nov 6, 2021 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 4, 2021 · Apt 3H
Close - Heat/hot water
Entire building
Nov 4, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 4, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 7, 2021 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 29, 2021 · Apt 2C
Close - Heat/hot water
Apartment only
Jan 29, 2021 · Apt 2C
Close - Heat/hot water
Apartment only
Jan 23, 2021 · Apt 3H
Close - Heat/hot water
Entire building
Jan 23, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 19, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 8, 2021 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 15, 2020 · Apt 3H
Close - Heat/hot water
Apartment only
Dec 6, 2020 · Apt 3H
Close - Heat/hot water
Entire building
Dec 3, 2020 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 11, 2020 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 29, 2020 · Apt 4G
Close - Heat/hot water
Entire building
Feb 27, 2020 · Apt 3H
Close - Heat/hot water
Entire building
Feb 13, 2020 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 1, 2019 · Apt 3H
Close - Heat/hot water
Entire building
Nov 7, 2019 · Apt 3H
Close - Heat/hot water
Entire building
Nov 3, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 2, 2019 · Apt 3H
Close - Heat/hot water
Entire building
Nov 1, 2019 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 27, 2019 · Apt 3H
Close - Heat/hot water
Apartment only
Feb 24, 2019 · Apt 3H
Close - Heat/hot water
Entire building
Feb 22, 2019 · Apt 3H
Close - Heat/hot water
Entire building
Feb 18, 2019 · Apt 3H
Close - Heat/hot water
Entire building
Nov 4, 2017 · Apt 2G
Close - Heat/hot water
Entire building
Nov 1, 2017 · Apt 3H
Close - Door/window
Door
Sep 8, 2017 · Apt 5J
Close - Heat/hot water
Entire building
Jan 9, 2017 · Apt BLDG
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| May 19, 2026 | $9,375,000 | Rentals - elevator apartments | 40 |
Building details
- Building type
- Elevator apartment building (D3)
- Year built
- 1910
- Floors
- 5
- Residential units
- 40
- Building area
- 37,065 ft²
- Lot area
- 9,486 ft²
- Zoning
- R10A
- Community board
- 111
- Council district
- 8
- Block / lot
- 1624 / 21
- Assessed value
- $2,129,850
- Landmark / historic district
- No
HPD registration #137570, last renewed Jul 15, 2025.
Questions about 155 East 96 Street
Who owns 155 East 96 Street?
The owner of record in NYC Department of City Planning PLUTO data is 96th Street Realty LLC.
Does 155 East 96 Street have violations?
Yes. NYC HPD has recorded 16 housing violations at this property.
Is 155 East 96 Street rent stabilized?
NYC Department of Finance tax bills listed 39 rent-stabilized units here in 2024 (about 98% of its 40 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 155 East 96 Street built?
City records list 1910 as the year it was built.
How many apartments are in 155 East 96 Street?
It has 40 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.