521 East 82 Street
Manhattan, NY 10028BBL 1-01579-0014Map
Owner of record: 521 E 82 Realty LLC
521 East 82 Street is a walk-up apartment building built in 1910 in Manhattan, 10028. It has 20 residential units across 5 floors. The owner of record is 521 E 82 Realty LLC. HPD has recorded 12 housing violations here, most recently on August 26, 2026. 6 of the 12 most recent violations are still open. City tax records listed 9 rent-stabilized apartments here in 2024.
- HPD violations
- 12
- DOB violations
- 2
- ECB violations
- 4
- HPD complaints
- 34
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 12
- BHazardous
Properly secure the loose door knob in the entrance located at apt 3b, 4th story, 2nd apartment from south at west
Aug 26, 2026 · Apt 3B
Open — Civ14 mailed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the 4th room from north located at apt 3b, 4th story, 2nd apartment from south at west
Aug 26, 2026 · Apt 3B
Open — Civ14 mailed - CImmediately hazardous
Repair the broken or defective connection at sink waste drain pipe in the kitchen located at apt 3b, 4th story, 2nd apartment from south at west
Aug 26, 2026 · Apt 3B
Open — Violation will be reinspected - BHazardous
Properly repair or replace the broken or defective eroded wood floor at sink base cabinet in the kitchen located at apt 3b, 4th story, 2nd apartment from south at west
Aug 26, 2026 · Apt 3B
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from north located at apt 3b, 4th story, 2nd apartment from south at west
Aug 26, 2026 · Apt 3B
Open — Nov certified on time - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sqft at ceiling and south wall in the bathroom located at apt 3b, 4th story, 2nd apartment from south at west
Aug 26, 2026 · Apt 3B
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective lock and assembly at vestibule door at public hall, 1st story
Jan 9, 2025
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at ceiling (2 sq. ft.) in the 2nd room from north located at apt 2d, 3rd story, 2nd apartment from north at east
Feb 18, 2021 · Apt 2D
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at apt 2d, 3rd story, 2nd apartment from north at east
Feb 18, 2021 · Apt 2D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north located at apt 2d, 3rd story, 2nd apartment from north at east
Feb 18, 2021 · Apt 2D
Closed — Violation dismissed
Show 2 more ↓
- CImmediately hazardous
M/d law abate the nuisance consisting of concealed ceiling leak at bathroom 3 sty northeast apt 2b er1. , section '' ''
Sep 17, 1987 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color bathroom ceiling at 3 sty northeast apt 2b. , section '' ''
Sep 17, 1987 · Apt 2B
Closed — Violation closed
DOB building violations · 2
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 4
- Non-hazardous
Failure to obtain a permit for temporary construction:-sidewalk shed remedy:obtain a permit
Apr 5, 2001
Resolve - Hazardous
Sidewalk shed does not meet building code specifications.-lights not properly placed.remedy:conform shed to building code specifications.
Apr 5, 2001 · Penalty $2,000
Resolve - Non-hazardous
31a,42c,46a,32,#10a, dirty boiler room clean replace blr casing on leftside of boiler, *leaking in rear by fume pipe
Jan 29, 1993 · Penalty $250
Resolve - Non-hazardous
Failure to maintain front facade. defects noted: 1 point flaking from front brickwork from 2nd story to roof 2 stucco flaking from front facade from ground level, to 2nd story 3 section of sheetrock/plaster is
Jul 31, 1991 · Penalty $285
Resolve
Complaints
- Plumbing
Water supply
Apr 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2024 · Apt 2B
Close - Unsanitary condition
Mold
Jan 19, 2021 · Apt 2D
Close - Heat/hot water
Entire building
Jan 2, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 26, 2020 · Apt BLDG
Close
Show 24 more ↓
- Heat/hot water
Entire building
Dec 19, 2019 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Sep 3, 2019 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 5, 2019 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 2, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 8, 2019 · Apt 1C
Close - Heat/hot water
Entire building
Jan 28, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 28, 2019 · Apt 4D
Close - Heat/hot water
Entire building
Jan 21, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2019 · Apt 2C
Close - Unsanitary condition
Garbage/recycling storage
Jul 10, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 12, 2014 · Apt 4F
Close - Heating
Heat related
Jan 7, 2014 · Apt 2C
Close - Heating
Heat related
Dec 15, 2013 · Apt NA
Close - Heating
Heat related
Jan 4, 2009 · Apt 2C
Close - Heating
Heat related
Jan 1, 2009 · Apt 3
Close - Nonconst
Janitor/super
May 15, 2008 · Apt 2C
Close - Nonconst
Janitor/super
May 15, 2008 · Apt 2C
Close - Heating
Heat related
May 15, 2008 · Apt 2C
Close - Heating
Heat related
Mar 12, 2008 · Apt BLDG
Close - Heating
Heat related
Mar 12, 2008 · Apt 3A
Close - Heating
Heat related
Mar 11, 2008 · Apt 2C
Close - Heating
Heat related
Oct 29, 2006 · Apt 4A
Close - Nonconst
Rubbish
May 10, 2006 · Apt C
Close - Appliance
Air-conditioner
Jun 28, 2004 · Apt 2C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C5)
- Year built
- 1910
- Floors
- 5
- Residential units
- 20
- Building area
- 9,425 ft²
- Lot area
- 2,963 ft²
- Zoning
- R8B
- Community board
- 108
- Council district
- 5
- Block / lot
- 1579 / 14
- Assessed value
- $1,349,100
- Landmark / historic district
- No
HPD registration #130742, last renewed Jul 27, 2026.
Questions about 521 East 82 Street
Who owns 521 East 82 Street?
The owner of record in NYC Department of City Planning PLUTO data is 521 E 82 Realty LLC.
Does 521 East 82 Street have violations?
Yes. NYC HPD has recorded 12 housing violations at this property.
Is 521 East 82 Street rent stabilized?
NYC Department of Finance tax bills listed 9 rent-stabilized units here in 2024 (about 45% of its 20 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 521 East 82 Street built?
City records list 1910 as the year it was built.
How many apartments are in 521 East 82 Street?
It has 20 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.