410 East 52 Street
Manhattan, NY 10022BBL 1-01363-0043Map
Owner of record: Southgate Owners Corp
410 East 52 Street is an elevator apartment building built in 1931 in Manhattan, 10022. It has 151 residential units across 17 floors. The owner of record is Southgate Owners Corp. HPD has recorded 18 housing violations here, most recently on May 26, 2026. 15 of the 18 most recent violations are still open. City tax records listed 1 rent-stabilized apartment here in 2024.
- HPD violations
- 18
- DOB violations
- 60
- ECB violations
- 21
- HPD complaints
- 27
Available now in this building
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 18
- BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
May 26, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 15, 2023
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective electrical outlet at west wall in the 2nd room from east at north located at apt 12d, 12th story, 1st apartment from south at west , section at north
Jun 3, 2019 · Apt 12D
Open — Nov sent out - BHazardous
Properly repair the broken or defective electrical outlet at west wall in the 2nd room from east at south located at apt 12d, 12th story, 1st apartment from south at west , section at north
Jun 3, 2019 · Apt 12D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at east wall in the bathtub in the bathroom located at apt 12d, 12th story, 1st apartment from south at west , section at north
Jun 3, 2019 · Apt 12D
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at east wall apprx 2 square feet in the bathroom located at apt 12d, 12th story, 1st apartment from south at west , section at north
Jun 3, 2019 · Apt 12D
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 12d, 12th story, 1st apartment from south at west , section at north
Jun 3, 2019 · Apt 12D
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... at east wall apprx 2 square feet in the bathroom located at apt 12d, 12th story, 1st apartment from south at west , section at north original violation 13103864 issued 03-jun-19 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jun 3, 2019 · Apt 12D
Open — First no access to re- inspect violation - BHazardous
Replace with new the broken or defective the ceramic towel bar at east wall in the bathroom located at apt 12d, 12th story, 1st apartment from south at west
May 24, 2019 · Apt 12D
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 12d, 12th story, 1st apartment from south at west
May 24, 2019 · Apt 12D
Open — Nov sent out
Show 8 more ↓
- BHazardous
Properly repair the broken or defective electrical outlet at west wall in the 4th room from east at south located at apt 12d, 12th story, 1st apartment from south at west
May 24, 2019 · Apt 12D
Open — Nov sent out - BHazardous
Properly repair the broken or defective electrical outlet at north, east and west walls in the 2nd room from east located at apt 12d, 12th story, 1st apartment from south at west
May 24, 2019 · Apt 12D
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 12d, 12th story, 1st apartment from south at west
May 24, 2019 · Apt 12D
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
May 21, 2019
Open — Invalid certification - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing at public hall, 1st story
May 21, 2019
Open — Invalid certification - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
May 21, 2019
Open — Invalid certification - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
May 21, 2019
Open — Invalid certification - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
May 21, 2019
Open — Invalid certification
DOB building violations · 60
- Construction other optional
Emergency work order.obsrvd@exp 3 1stfl,facade masonry wall blown out due to improper cncrte plcmnt@neighborng constructn site 405e 1st st brck masnry facade wall is prtlly cllpsd,bulgd,crckd,delamntd.ownr to engage nyspe&endrsd cntrctr to immed temp stabilize the cmprmsd facade wall.nyspe to sbmt means&methds for feu
Oct 31, 2025
Dob violation - active - Construction other optional
Failure to maintain.obsrvd@exp3 1stfl facade masonry wall blown out due to improper cncrte plcmnt@neighborng construction site 405 e51 st brck masonry facade wall is prtlly cllpsd,bulgd,crckd&dlmnt.ownr to engage nyspe&endrsd cntrctr to eval the ent bldg&rpair undr prmt.file for prmts by 12/1/25.sgn off rpairs
Oct 31, 2025
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 3, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 17, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 17, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 17, 2019
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed
Show 40 more ↓
- Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - dismissed - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 15, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 15, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 15, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 10, 2015
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 10, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 10, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 10, 2014
Dob violation - resolved - Failure to submit eer none
Failure to submit an energy efficiency report (eer) per ad. code sec. 28-308.4
Dec 31, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 4, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 4, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 4, 2013
Dob violation - resolved - Facade facade optional
Cycle 7 unsafe report filed
Feb 19, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 24, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 24, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 28, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 28, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 28, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 2, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 2, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 2, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 23, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 23, 2008
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 21, 2008
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 10, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 10, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 10, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 22, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 22, 2004
Dob violation - resolved - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Elevator elevatorrequired
1p19248
Aug 23, 2000
Dob violation - resolved - Elevator elevatorrequired
1p19249
Aug 23, 2000
Dob violation - resolved - Elevator elevatorrequired
1p19247
Aug 23, 2000
Dob violation - resolved - Elevator elevatorrequired
1p19249
Nov 24, 1998
Dob violation - resolved - Elevator elevatorrequired
1p19247
Nov 24, 1998
Dob violation - resolved - Elevator elevatorrequired
1p19248
Nov 24, 1998
Dob violation - resolved - Construction other optional
C-construction other optional
May 5, 1992
Dob violation - dismissed
ECB violations · 21
- Class - 1
Partial stop work order for suspended scaffold. issued pursuant to 28-207.2 and posted at premises st:22upos location.note:suspended scaffold in connection w/c-hook and outrigger beams have been erected at exp
Sep 10, 2014
Resolve - Class - 2
Work does not conform to approved construction documents. noted: shed plans are typical, not showing height elevation from 8' to 10' at exp 1 at entrance to bldg and to right of entrance at restaurant entrance
Jul 2, 2013
Resolve - Class - 2
Sidewalk shed does not meet code specification. noted: at exp 1, at either end of shed installation, shed post leaning due to inadequate mudsills under post. remedy: conform shed to code specification.
Jul 2, 2013 · Penalty $2,400
Resolve - Non-hazardous
Failure to submit a fifth round technical report: periodic inspection of exterior walls and appurtenances as required by local law 11 of 1998 and the department of buildings rules and regulations. remedy: file
Jun 25, 2004
Resolve - Non-hazardous
Failure to submit a fifth round technical report : periodic inspectionof exterior walls and appurtenances as required by local law 11 of 1998 and the department of buildings rules and remedy : file the required
Mar 19, 2004
Resolve - Non-hazardous
75u5, 73o2, 57t7, 57x11, 31q3, 25q3, 55m7, 64#15, 3m7, 4m7, 14m7, 57 door 57 switch 3 capacity plate 4 five pin hole keylock 14 post certificate in cat as per rule 274004a or b
Sep 18, 2001
Resolve - Non-hazardous
75u5, 73o2, 31q3, 47i10, 33w6, 4m7, 4q3, 3m7, 14b7, 33 door 4 five pin key lock 4 electric switch 3 capacity plate 14 post certificate in car as per 271004a or b
Sep 18, 2001
Resolve - Non-hazardous
75u5, 22#7, 73o2, 40h#, 31q3, 33w6, 33l11, 3m7, 14m7, 22 as per code and secure 40 overhead 33 doon 33 light 3 capacity plate 14 post certificates in car as per rule 27-1004 a or b
Sep 18, 2001
Resolve - Non-hazardous
Exit door:swing again the flow of egress.noted:cafertia egress thru fare dppr for st. at no. west locationto cafeteria from cellar location:no. west egress door ajacent to 87th street from cellar.
Mar 21, 2000
Resolve - Non-hazardous
46b15,32d9,31q7,2l7. -46 hoist cable shorten, -32 remove or secured old elec. pipe in first floor hoistway, -31 provide covers on elec. box top of car and provide greenfield, -2 alarm bell insufficient.
Oct 1, 1999 · Penalty $350
Resolve
Show 11 more ↓
- Non-hazardous
47b15,28h11.
Oct 1, 1999 · Penalty $350
Resolve - Non-hazardous
X031d10x05l03d x-clean top of car 31-cable to inspection box top of car out of fitting 10-door open button not working 05-car door timing to lane 03-secure car phone box.
Aug 15, 1997 · Penalty $100
Resolve - Non-hazardous
57oxo47h 57-clean pit x-clean top of car 47-governer cable worn.
Aug 15, 1997 · Penalty $100
Resolve - Non-hazardous
46h50y 46-motor cables worn low 50-clean oil around machine.
Aug 15, 1997 · Penalty $100
Resolve - Non-hazardous
73#, 73/ perform 5 year test, properly tag device and file elv-3 form.
Apr 20, 1992
Resolve - Non-hazardous
73#, 73/ perform 5 years test, properly tag device and file elv-3 form
Apr 20, 1992
Resolve - Non-hazardous
73#, 73/perform 5 year test, properly tag device and fire elv-3 form.
Apr 20, 1992
Resolve - Non-hazardous
Altered buidling occupied without a validc c of o under alteraton #1557/86 at 5 floor apt f & g south/east. failure to provide approved plans for alt 1557/86 at premises at time of inspection remedy discontinue
Mar 15, 1990 · Penalty $275
Resolve - Non-hazardous
Altered building occupied without a valid c of o under alteration #1557/86 at 6 floor apt f and g south/east. occupancy contrary to that allow by building dept records alteration 1557/86 states apt at 6 fl
Mar 15, 1990 · Penalty $500
Resolve - Hazardous
Failure to provide toe boards and guard rails at east and north sides{of building roof level.(penthouse) work without a permit. removing &replacing brick wall. remedy: obtain a permit, provide toe boards.
Jan 17, 1990
Resolve - Non-hazardous
Altered building occupied without a valid c of o under alterttion #1557/86. apt 5f, 5g, 6f, 6g remedy: obtain a valid c of o
Jun 15, 1988
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Nov 26, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 4, 2022 · Apt 10D
Close - Heat/hot water
Apartment only
Nov 16, 2019 · Apt 10D
Close - Unsanitary condition
Mold
Aug 13, 2019 · Apt 1CD
Close - Plumbing
Bathtub/shower
May 31, 2019 · Apt 12D
Close - Electric
Outlet/switch
May 31, 2019 · Apt 12D
Close - Paint/plaster
Wall
May 31, 2019 · Apt 12D
Close - Electric
Wiring
May 31, 2019 · Apt 12D
Close - Plumbing
Basin/sink
May 20, 2019 · Apt 12D
Close - Paint/plaster
Wall
May 20, 2019 · Apt 12D
Close
Show 17 more ↓
- Electric
Wiring
May 20, 2019 · Apt 12D
Close - Heat/hot water
Apartment only
May 20, 2019 · Apt 12D
Close - Unsanitary condition
Mold
May 20, 2019 · Apt 12D
Close - Electric
Outlet/switch
May 20, 2019 · Apt 12D
Close - Plumbing
Bathtub/shower
May 20, 2019 · Apt 12D
Close - Heat/hot water
Apartment only
Jan 7, 2018 · Apt 4F
Close - Heat/hot water
Apartment only
Jan 3, 2018 · Apt 4F
Close - Heat/hot water
Apartment only
Jan 8, 2015 · Apt 4F
Close - Heating
Heat related
Oct 12, 2012 · Apt NA
Close - Paint/plaster
Wall
Aug 30, 2010 · Apt 1H
Close - Paint/plaster
Ceiling
Aug 30, 2010 · Apt 1H
Close - Paint/plaster
Ceiling
Jul 12, 2010 · Apt 1H
Close - Plumbing
Water-leaks
Jul 12, 2010 · Apt 1H
Close - Paint/plaster
Ceiling
Jul 12, 2010 · Apt 1H
Close - Paint/plaster
Ceiling
Jul 12, 2010 · Apt 1H
Close - Plumbing
Radiator
Feb 25, 2009 · Apt 12E
Close - Heating
Heat related
Mar 2, 2007 · Apt OO
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Aug 24, 2026 | $580,000 | Coops - elevator apartments | — |
| Aug 10, 2026 | $550,000 | Coops - elevator apartments | — |
| Aug 6, 2026 | Non-market transfer | Coops - elevator apartments | — |
| Aug 6, 2026 | Non-market transfer | Coops - elevator apartments | — |
| Jul 15, 2026 | $875,000 | Coops - elevator apartments | — |
| Jul 9, 2026 | $475,000 | Coops - elevator apartments | — |
| Apr 10, 2026 | $650,000 | Coops - elevator apartments | — |
| Mar 16, 2026 | Non-market transfer | Coops - elevator apartments | — |
| Feb 27, 2026 | $935,000 | Coops - elevator apartments | — |
| Feb 26, 2026 | $575,000 | Coops - elevator apartments | — |
| Dec 16, 2025 | $575,000 | Coops - elevator apartments | — |
| Dec 16, 2025 | $350,000 | Coops - elevator apartments | — |
| Nov 19, 2025 | $695,000 | Coops - elevator apartments | — |
| Oct 6, 2025 | $1,595,000 | Coops - elevator apartments | — |
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1931
- Floors
- 17
- Residential units
- 151
- Building area
- 179,213 ft²
- Lot area
- 13,425 ft²
- Zoning
- R10
- Community board
- 106
- Council district
- 4
- Block / lot
- 1363 / 43
- Assessed value
- $21,188,700
- Landmark / historic district
- No
HPD registration #117967, last renewed Aug 25, 2025.
Questions about 410 East 52 Street
Who owns 410 East 52 Street?
The owner of record in NYC Department of City Planning PLUTO data is Southgate Owners Corp.
Does 410 East 52 Street have violations?
Yes. NYC HPD has recorded 18 housing violations at this property.
Is 410 East 52 Street rent stabilized?
NYC Department of Finance tax bills listed 1 rent-stabilized units here in 2024 (about 1% of its 151 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 410 East 52 Street built?
City records list 1931 as the year it was built.
How many apartments are in 410 East 52 Street?
It has 151 residential units and 152 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.

