23 West 90 Street
Manhattan, NY 10024BBL 1-01204-0021Map
Owner of record: NYC Housing Authority
23 West 90 Street is a walk-up apartment building built in 1910 in Manhattan, 10024. It has 96 residential units across 4 floors. The owner of record is NYC Housing Authority. HPD has recorded 14 housing violations here, most recently on June 16, 2009. 14 of the 14 most recent violations are still open.
- HPD violations
- 14
- DOB violations
- 6
- ECB violations
- 13
- HPD complaints
- 3
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 14
- BHazardous
Repair the leaky and/or defective faucets at wash-basin in the bathroom located at apt 2a, 3rd story, 1st apartment from north at east
Jun 16, 2009 · Apt 2A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the bathroom located at apt 2a, 3rd story, 1st apartment from north at east
Jun 16, 2009 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Properly repair the broken or defective mortise lock in the entrance located at apt 2a, 3rd story, 1st apartment from north at east
Jun 16, 2009 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair the broken or defective door in the 1st room from north at east located at apt 2a, 3rd story, 1st apartment from north at east
Jun 16, 2009 · Apt 2A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east and west walls in the 1st room from north at east located at apt 2a, 3rd story, 1st apartment from north at east
Jun 16, 2009 · Apt 2A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the 3rd room from north located at apt 2a, 3rd story, 1st apartment from north at east
Jun 16, 2009 · Apt 2A
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 2a, 3rd story, 1st apartment from north at east
Jun 16, 2009 · Apt 2A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north and west wall in the bathroom located at apt 1b, 2nd story, 1st apartment from east at south
Jul 18, 2007 · Apt 1B
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 1b, 2nd story, 1st apartment from east at south
Jul 18, 2007 · Apt 1B
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north located at apt 1b, 2nd story, apartment at south
Jul 18, 2007 · Apt 1B
Open — Nov sent out
Show 4 more ↓
- BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimum required
Jun 14, 2006
Open — Nov sent out - BHazardous
Properly repair the broken or defective cabinet draws in the kitchen located at apt 1b, 2nd story, 1st apartment from east at south
Mar 31, 2006 · Apt 1B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the bathroom located at apt 1b, 2nd story, 1st apartment from east at south
Mar 31, 2006 · Apt 1B
Open — Nov sent out - BHazardous
Replace with new the broken or defective vinyl floor tiles in the 1st room from north located at apt 1b, 2nd story, 1st apartment from east at south
Mar 31, 2006 · Apt 1B
Open — Nov sent out
DOB building violations · 6
- Construction other optional
Emergency work ordr.obsrvd bsmnt lvl fl framng in a state of disrepair w/cotton joists,collapsd joists,crckd girders,&rotten subfl.obsrvd minor damage to wood framng@upper floors.ownr to engage nyspe&endrsd cntrctr to immed install temp shorng of bsmnt lvl fl framng&cellar utilities,as req
Apr 10, 2024
Dob violation - dismissed - Construction other optional
Failure to maintain.at time of inspection,obsrvd basement level fl framng in a state of severe dsrepair w/rotten joists,collapsed joists, cracked girders,&rotten subfloor.obsrvd minor damage to wood framng@ upper flrs.ownr to engage nyspe&endrsd cntrctr to eval the entire bldg &repair undr prmt.complete rpair wrk by 6/12/24
Apr 10, 2024
Dob violation - dismissed - Construction other optional
Emergency work order.at time of inspection,obsrvd bsmnt lvl fl framing in a state of severe disrepair w/cotton joists, collapsed joists,crckd girders,&rotten subfl.obsrvd minor damage to wood framng.ownr to engage nyspe&endrsd cntrctr to immed install temp shorng of bsmnt lvl fl framng&cellar utilities, as req
Apr 10, 2024
Dob violation - active - Construction other optional
Failure to maintain.at time of inspection,obsrvd bsmnt level floor framng in a state of severe dsrepair w/rotten joists,collapsed joists, crckd girdersm&rotten subfloor.obsrvd minor damage to wood frame.ownr to engage nyspe&endrsd cntrctr to eval the ent bldg&repair undr prmt complete repair work by 6/12/24
Apr 1, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7a technical report by 02/21/2012
Jan 31, 2013
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed
ECB violations · 13
- Class - 2
Failure to comply with bc-3307.6.3 area to be protected and approved drawing. sidewalk shed at exposure one is missing the extend 5 feet deck additional beyond such length by adjacent property creating hazards
Mar 20, 2026 · Penalty $2,430
Resolve - Class - 2
Observed in basement water leaking from waste line on the floor which is contrary to pc 301.3, repair and/or replace
Feb 13, 2024 · Penalty $625
Resolve - Class - 1
I observed on the ground floor in apt 1a electrical wires been exposed and are in short circuit due to water damage coming from top floor, ceiling is collapsed, comply with ec
Jan 25, 2024 · Penalty $1,600
Resolve - Class - 1
Failure to maintain. noted: vestibule/bsmt hllwy missing flring/rotted due to water damage. flring broken/missing fl tiles. bsmt hllwy walls/ceiling have water damage w/evidence of collapse. 1st fl hllwy fl is
Jan 23, 2024 · Penalty $1,250
Resolve - Class - 2
Extension cord plugged in from the roof ran from building 24 to feed outlets throughout apartment 3a kitchen in building 22. ran from the roof through the hallway to apt. 3a, comply with ec
Oct 18, 2022 · Penalty $800
Resolve - Non-hazardous
Failure to submit a 5th round technical report in compliance w/ code provisions: periodic insp of exterior walls & appurtenances as requiredby ll 11/98 & the dob rules & regulations. remedy: file the required
Aug 31, 2006
Resolve - Non-hazardous
Failure to submit a fifth round technical report in compliance with code provisions:periodic inspection of exterior walls & appurtenances asrequired by local law 11 of 1998 & the dob rules & regulations.
May 26, 2006
Resolve - Non-hazardous
Failure to submit a fifth round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenancesas required by local law 11 of 1998 & the dept of bldgs rules & regul-
Feb 10, 2006
Resolve - Hazardous
Failure to maintian building; defect noted : flooring in apartment bb at first floor rear has excessive rot, lifting, sagging, holes, deteriorated, in danger of collapseling, due to excessive moisture penetrat
Apr 19, 2002
Resolve - Non-hazardous
Failure to provide / maintain fire shopping where required. location ; basement level, ( entire ) remedy : provide and maintian fire stopping
Apr 19, 2002
Resolve
Show 3 more ↓
- Hazardous
No fire proof enclosure fur boiler; noted : entire basement level openno enclosure at boiler remedy : provide fire proof enclosure forthwith
Apr 19, 2002
Resolve - Non-hazardous
Failure to obtain a permit for temporary construction, no permit for temporary construction no permit for obtained for sidewalk shed a sidewalk shed approximately 100'0 erected without first obtaining permits
Aug 31, 1994
Resolve - Non-hazardous
Failure to conduct construction operation in a safety & proper manner failure to maintain accumulation of debri in rear yard. remedy: conduct operation of construction in safely & proper manner & remove debris
Oct 7, 1992
Resolve
Complaints
- Water leak
Heavy flow
Sep 18, 2018 · Apt 2A
Close - Unsanitary condition
Pests
Feb 5, 2015 · Apt BA
Open - Paint/plaster
Radiator
Feb 5, 2015 · Apt BA
Open
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C5)
- Year built
- 1910
- Floors
- 4
- Residential units
- 96
- Building area
- 76,968 ft²
- Lot area
- 29,105 ft²
- Zoning
- R7-2
- Community board
- 107
- Council district
- 6
- Block / lot
- 1204 / 21
- Assessed value
- $8,210,250
- Landmark / historic district
- Upper West Side / Central Park West Historic District
Questions about 23 West 90 Street
Who owns 23 West 90 Street?
The owner of record in NYC Department of City Planning PLUTO data is NYC Housing Authority.
Does 23 West 90 Street have violations?
Yes. NYC HPD has recorded 14 housing violations at this property.
Is 23 West 90 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 23 West 90 Street built?
City records list 1910 as the year it was built.
How many apartments are in 23 West 90 Street?
It has 96 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.