328 East 15 Street
Manhattan, NY 10003BBL 1-00921-0049Map
Owner of record: 15th Associates LLC
328 East 15 Street is a walk-up apartment building built in 1910 in Manhattan, 10003. It has 24 residential units across 6 floors. The owner of record is 15th Associates LLC. HPD has recorded 10 housing violations here, most recently on July 6, 2023. 4 of the 10 most recent violations are still open. City tax records listed 11 rent-stabilized apartments here in 2024.
- HPD violations
- 10
- DOB violations
- 7
- ECB violations
- 25
- HPD complaints
- 22
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 10
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at apt 10, 3rd story, 2nd apartment from south at west
Jul 6, 2023 · Apt 10
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north located at apt 10, 3rd story, 2nd apartment from south at west
Jul 6, 2023 · Apt 10
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 10, 3rd story, 2nd apartment from south at west
Jul 6, 2023 · Apt 10
Closed — Violation dismissed - ANon-hazardous
Refit door in the entrance located at apt 10, 3rd story, 2nd apartment from south at west
Jul 6, 2023 · Apt 10
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 10, 3rd story, 2nd apartment from south at west
Jul 6, 2023 · Apt 10
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 10, 3rd story, 2nd apartment from south at west
Jul 6, 2023 · Apt 10
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of vermin mice & roaches kitchen 3 sty northeast apt 9. , section '' ''
Nov 5, 1992 · Apt 9
Open — Nov sent out - ANon-hazardous
Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration door removed and sealed with cinder block 1st sty public hall to east court.
Dec 24, 1986
Open — Nov sent out - ANon-hazardous
Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration front doors of front east and west apts sealed 3rd to 6th sty at public halls.
Dec 24, 1986
Open — Nov sent out - ANon-hazardous
Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration entrance created at 2nd sty public hall at front and 2nd sty front apts combined into 1.
Dec 24, 1986
Open — Nov sent out
DOB building violations · 7
- Facade safety program facade required
Fisp-facade safety program facade required
Feb 21, 2020
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 16, 2019
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - active - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Construction other optional
C-construction other optional
Jan 23, 1989
Dob violation - dismissed
ECB violations · 25
- Class - 1
Failure to provide unobstructed exit passageway.exit passageway was blocked by eletric scooter locked to the railings on 2nd floor obstructing the egress.remedy:remove obstruction.
May 27, 2022 · Penalty $1,250
Resolve - Class - 1
Failure to maintain bldg in codecompliant manner failure to provide required# of means of egress for every fl per bc1021(2014code);27-366;bc1018.1(2008code) for transient use@apt13 on 4fl level prev v35383159k
Apr 6, 2022
Resolve - Class - 1
Permanent dwelling used/converted for other than permanent residentialpurposes.dob record indicates bldg to be legally approved as classa multiple dwelling.now:apt13 on 4fl level used/converted to transient use
Apr 6, 2022 · Penalty $16,000
Resolve - Class - 1
Failure to maintain bldg in codecompliant manner failure to provide system of automatic sprinkler where required as per bc903.2&27-954 for transient use@apt13 on 4fl prev v35383157r discont illegal occupancy
Apr 6, 2022 · Penalty $3,125
Resolve - Class - 1
Bc907.2.8 failure to maintain bldg in codecompliant manner failure to provide required fire alarm system for transient use@apt13 on 4fl prevv35383156p discont illegal occupancy
Apr 6, 2022 · Penalty $6,250
Resolve - Class - 1
Failure to maintain building in code compliant manner.lack of a automatic sprinkler system where is required as per bc 903.2 and 27-954 for transient use in apartment b(4th floor).rem:discontinue illegal use.
Mar 25, 2022 · Penalty $1,250
Resolve - Class - 1
Failure to maintain building in code compliant manner lack of requirednumber of means of egress for every floor per bc 1018.1(2008 code),27-366;bc 1021(2014 code)for transient use at apartment 13(4th floor)rem:
Mar 25, 2022 · Penalty $2,500
Resolve - Class - 2
Permanent dwelling used/converted for other than permanent.residentialpurposes department of building records indicate building to be legally approved as a class a multiple dwelling.now apartment 13(4th floor)
Mar 25, 2022 · Penalty $1,250
Resolve - Class - 1
Bc 907.2.8 failure to provide a fire alarm system for transient use for apartment 13(4th floor).rem:discontinue illegal use.
Mar 25, 2022 · Penalty $2,500
Resolve - Class - 2
Failure to file acceptable amended cycle6,7c,&8c report indicating correction of unsafe conditions described in initial facades report required by28-302.5 for control#802859.file acceptable report
Oct 8, 2021 · Penalty $1,250
Resolve
Show 15 more ↓
- Class - 2
Failure to submit a required cycle 8b report of critical examination documenting condition of exterior walls & appurtenances required by 28-302.4 for control#802859. agg2 history of noncompliance on 37009265r,
Oct 28, 2019 · Penalty $6,250
Resolve - Class - 1
Faiure to maintain building in code compliant manner.lack of a system of automatic sprinkler where is required as per bc 903.2 and 27-954 for transient use at apt #12c 3rd floor.discontinue illegal occupancy
Jan 30, 2019 · Penalty $625
Resolve - Class - 2
Permanent dwelling used/converted for other than permanent-residential pruposes.dept oif buidling records indicate building to be legally approved as class "a: multi dwelling how apt #12(3) floor used/converted
Jan 30, 2019 · Penalty $1,250
Resolve - Class - 1
907.2.8;failure to provide fire alarm system for transient use at apt#12(3rd floor/class "j:discontinue illegal occupancy
Jan 30, 2019 · Penalty $625
Resolve - Class - 1
Work without a permit.work noted:at apt #12 (3rd floor/erected full height partition wall to create additional bedroom from living room.obtain required permit
Jan 30, 2019
Resolve - Class - 1
Failure to maintain bldg in code complaint manner. lack of required # of means of egress for every floor per bc 1018.1(2008 code;27-366;bc 1021.1(2014 code)for transient use at apt#12 3rd floor. remedy: discont
Jan 30, 2019 · Penalty $625
Resolve - Class - 2
Failure to submit acceptable 7th round report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 for control #702859. agg2 history of noncompliance on 3602356
Mar 7, 2018 · Penalty $3,125
Resolve - Class - 2
Failure to maintain bldg exterior walls/facades and appurtenances. note: exposure 1 north elevation: crack in masonry on the 5th floor northwest end on bldg. exp#4 west elevation; eroding mortar joins at sever
Feb 5, 2018 · Penalty $500
Resolve - Class - 2
Fail to file an acceptable tech report in compliance w/code provisions:nov #36026805r periodic inspection of exterior walls & appurtenances as req by dob.rem:file required report to dob.
Nov 23, 2015 · Penalty $800
Resolve - Class - 2
Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat
Dec 12, 2014
Resolve - Class - 2
Failure to file an acceptable 6th round technical report in compliancew/code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 and the dob's rules and regulations.
Dec 15, 2011
Resolve - Class - 2
Failure to file an acceptable 6th round technical report in compliancew/code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 and the dob rules and regulations.
Jan 25, 2011
Resolve - Class - 2
Fail to maintain bldg walls or appurtenances. flower pots found at various flrs blocking fire egress at front fire escape 2/f & 4/f & 6/f. remedy: remove/replace defects including but not limited to such menti
Jun 21, 2010 · Penalty $250
Resolve - Class - 2
Failure to file an acceptable 6th round technical report in compliancewith code provisions:periodic insp of exterior walls & appurtenaces asrequired by article 28.302 & the dob rules & regulations.rem:file the
Apr 28, 2010 · Penalty $8,000
Resolve - Class - 2
Failure to summit an acceptable 6th round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the d.o.b. rules & regulation
Dec 7, 2008 · Penalty $800
Resolve
Complaints
- Unsanitary condition
Pests
Jan 15, 2026 · Apt 13
Close - Water leak
Heavy flow
Jul 2, 2023 · Apt 10
Close - Paint/plaster
Ceiling
Jul 2, 2023 · Apt 10
Close - Paint/plaster
Ceiling
Jul 2, 2023 · Apt 10
Close - Water leak
Slow leak
Jul 2, 2023 · Apt 10
Close - Heat/hot water
Apartment only
Dec 19, 2018 · Apt B1BAS
Close - Heat/hot water
Apartment only
Dec 29, 2017 · Apt B2
Close - Heat/hot water
Apartment only
Aug 19, 2017 · Apt 12
Close - Heat/hot water
Entire building
Jan 4, 2017 · Apt 24
Close - Heat/hot water
Entire building
Nov 1, 2015 · Apt 2
Close
Show 12 more ↓
- Plumbing
Water-leaks
Jul 15, 2009 · Apt 16
Close - Plumbing
Water supply
Oct 1, 2007 · Apt L1
Close - Appliance
Refrigerator
Aug 23, 2006 · Apt 17
Close - Appliance
Refrigerator
Aug 16, 2006 · Apt 17
Close - Plumbing
Bathtub/shower
Jun 14, 2006 · Apt 17
Close - Nonconst
Carbon monoxide
Jul 8, 2005 · Apt 17
Close - General
Windows
Jul 8, 2005 · Apt 17
Close - General
Floor
Jul 8, 2005 · Apt 17
Close - Nonconst
Vermin
Jul 8, 2005 · Apt 17
Close - Nonconst
Vermin
Jul 8, 2005 · Apt 17
Close - Appliance
Electric/gas range
May 11, 2005 · Apt 17
Close - Heating
Heat related
Jan 7, 2005 · Apt 21
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C4)
- Year built
- 1910
- Floors
- 6
- Residential units
- 24
- Building area
- 11,964 ft²
- Lot area
- 2,665 ft²
- Zoning
- R8A
- Community board
- 106
- Council district
- 2
- Block / lot
- 921 / 49
- Assessed value
- $1,206,450
- Landmark / historic district
- No
HPD registration #114096, last renewed Jul 14, 2026.
Questions about 328 East 15 Street
Who owns 328 East 15 Street?
The owner of record in NYC Department of City Planning PLUTO data is 15th Associates LLC.
Does 328 East 15 Street have violations?
Yes. NYC HPD has recorded 10 housing violations at this property.
Is 328 East 15 Street rent stabilized?
NYC Department of Finance tax bills listed 11 rent-stabilized units here in 2024 (about 46% of its 24 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 328 East 15 Street built?
City records list 1910 as the year it was built.
How many apartments are in 328 East 15 Street?
It has 24 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.