213 East 34 Street
Manhattan, NY 10016BBL 1-00915-0008Map
Owner of record: 213 East 34 LLC
213 East 34 Street is a walk-up apartment building built in 1900 in Manhattan, 10016. It has 6 residential units across 3 floors. The owner of record is 213 East 34 LLC. HPD has recorded 181 housing violations here, most recently on April 29, 2026. 2 of the 50 most recent violations are still open. City tax records listed 5 rent-stabilized apartments here in 2024.
- HPD violations
- 181
- DOB violations
- 6
- ECB violations
- 17
- HPD complaints
- 421
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 181
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Closed — Violation dismissed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Apr 20, 2026
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 3a, 3rd story, 1st apartment from north at east
Apr 10, 2026 · Apt 3A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective 8th wood baluster from north at south at public hall stairs, 1st story
Mar 20, 2026
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 2nd room from north located at apt 3a, 3rd story, 1st apartment from north at east
Mar 20, 2026 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 3a, 3rd story, 1st apartment from north at east
Mar 20, 2026 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ...hinge in the entrance located at apt 3a, 3rd story, 1st apartment from north at east
Mar 13, 2026 · Apt 3A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective ... bell, return buzzer & intercom system from building front entrance door to apartment panel at south wall in the foyer located at apt 3a, 3rd story, 1st apartment from north at east
Mar 13, 2026 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door leading to boiler room at public hall, 1st story
Jan 23, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latchset at building entrance door , 1st story
Jan 23, 2026
Closed — Violation closed
Show 40 more ↓
- CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east
Sep 3, 2025 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east
Sep 3, 2025 · Apt 3A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north at west located at apt 3a, 3rd story, 1st apartment from north at east
Sep 3, 2025 · Apt 3A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east
Sep 3, 2025 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Make safe by properly repairing the structural defect vertical crack with 1/4 in gap from fondation up to 3rd story at southeast section of east exterior wall
Sep 3, 2025
Open — Invalid certification - BHazardous
Properly repair with similar material the broken or defective concrete flashing at 3rd story east exterior wall (tunnel exit)
Sep 3, 2025
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 2nd room from north at west located at apt 3a, 3rd story, 1st apartment from north at east
Sep 3, 2025 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling, baseboard moldings and trims including inside of closets throughtout in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east
Sep 3, 2025 · Apt 3A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective cracked marble saddle at floor in the entrance located at apt 3a, 3rd story, 1st apartment from north at east
Sep 3, 2025 · Apt 3A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north at west located at apt 3a, 3rd story, 1st apartment from north at east
Sep 3, 2025 · Apt 3A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from east located at apt 3a, 3rd story, 1st apartment from north at east
Jun 4, 2025 · Apt 3A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective hardwood flooring in the 1st room from east located at apt 3a, 3rd story, 1st apartment from north at east
Jun 4, 2025 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3a, 3rd story, 1st apartment from north at east
Jun 4, 2025 · Apt 3A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wooden baseboards at east wall in the 1st room from east located at apt 3a, 3rd story, 1st apartment from north at east
Jun 4, 2025 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 4, 2025
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east
Jun 4, 2025 · Apt 3A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 2nd room from north at east located at apt 3a, 3rd story, 1st apartment from north at east
Oct 5, 2024 · Apt 3A
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east
Oct 5, 2024 · Apt 3A
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east
Oct 5, 2024 · Apt 3A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west and east walls in the bathroom located at apt 3a, 3rd story, 1st apartment from north at east
Oct 5, 2024 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of uncovered electrical panel with exposed wires at south wall in the foyer located at apt 3a, 3rd story, 1st apartment from north at east
Oct 5, 2024 · Apt 3A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 3a, 3rd story, 1st apartment from north at east
Oct 5, 2024 · Apt 3A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 3a, 3rd story, 1st apartment from north at east
Oct 5, 2024 · Apt 3A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 3a, 3rd story, 1st apartment from north at east
Sep 11, 2024 · Apt 3A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroom located at apt 3a, 3rd story, 1st apartment from north at east
Sep 11, 2024 · Apt 3A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt 3a, 3rd story, 1st apartment from north at east
Sep 11, 2024 · Apt 3A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective brick and mortal joint at top of building front entrance door
Sep 2, 2024
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective electrical outlet at east wall in the bathroom located at apt 3a, 3rd story, 1st apartment from north at east
Sep 2, 2024 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at west wall in the bathroom located at apt 3a, 3rd story, 1st apartment from north at east
Aug 8, 2024 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation riser pipe at west in the bathroom located at apt 3a, 3rd story, 1st apartment from north at east
Aug 8, 2024 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water exceeding 130 deegres.at all hot water fixtures in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east
May 16, 2024 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
May 5, 2024
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
May 5, 2024 · Apt 3A
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
May 5, 2024 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
May 5, 2024 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
May 5, 2024 · Apt 3A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing the bathtub in the bathroom located at apt 3a, 3rd story, 1st apartment from east at south
May 5, 2024 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective porcelain enamel glaze surface finish on bathtub in the bathroom located at apt 3a, 3rd story, 1st apartment from east at south
Apr 29, 2024 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding 130 degrees at all fixtures in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
Apr 29, 2024 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hot water fixtures in the entire apartment located at apt 3b, 4th story, 1st apartment from west at north
Jan 29, 2024 · Apt 3B
Closed — Violation dismissed
DOB building violations · 6
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 26, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 25, 2012
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed
ECB violations · 17
- Class - 2
Observed at exposure#4 facade in a state of disrepair with cracks in stucco on the corner of exposure#4 and 1 from foundation to parapet andother locations., repair and/or replace; make repairs
Sep 5, 2025
Resolve - Class - 3
A8 electrical work without a permit, for the installation of gfci receptacle in bathroom. apt 3a an application for certificate of electrical inspection is not no file., obtain permit; obtain permit.
Jul 11, 2024 · Penalty $100
Resolve - Class - 2
Observed heat timer model epu shutting off hb smith 19 a s/w 4 boiler before it can make steam pressure to provide adequate heat to the building. heat watch control in fallback mode. correct all violating condi
Jan 30, 2024
Resolve - Class - 2
Violation issued for f.t.m oil boiler smith model19a ser-s/w-4 ser#fa2000-591,520mb btus,clean chimney, service boiler soot present in room,barometric deverter defective.
Dec 11, 2023
Resolve - Class - 2
As per one fuel oil burning, 19a-04-s hb smith cast iron boiler in cellar. boiler blow-down piping leaking-hw coil plate corroded-guard missing from water level glass-insulated panels not onto boiler block-no i
Feb 27, 2023
Resolve - Class - 2
Relief valve must be in vertical position as per manufacturer,gauge glass need to be cleaned or replaced,seal base of chimney soot all around,correct violation & send in certificate of correction
Dec 19, 2022
Resolve - Class - 2
Poor flame from burner ýodor on start¨/heat timer-heat controller is defective; correct violation and submit the certificate of correction
Mar 12, 2021 · Penalty $1,562
Resolve - Class - 1
Failure to maintain building in code compliant manner. noted: at frontfacade exposure #1 defects are bulging in various locations thru out also noted at the east elevation exposure #4 missing stucco cement.rmd
Dec 31, 2013 · Penalty $500
Resolve - Class - 3
Failure to maintain bldg noted:at top of front entrance approx 6'abovegrade,observed brick facade w/minor cracks at several locations.rmdy: repair defects & maintain bldg.
Jan 3, 2013 · Penalty $200
Resolve - Class - 2
Fail to maintain bldg in code-compliant manner.noted:@1st fl bathroom commercial space dry cleaner laundry bathroom sub-floor&substrate water soaked w/loose tiles&partial collapsed toilet.*vacate*1st fl commerc
Jul 12, 2012 · Penalty $250
Resolve
Show 7 more ↓
- Class - 2
Failure to comply w/the commissioner's order to file a c/c w/the dob for nov #34916089r issued on 10.27.11 pursuant to 28-204.4 & 1rcny 102-01. remedy: file a c/c.
Dec 13, 2011 · Penalty $8,000
Resolve - Class - 2
Failure to maintain. defect is: wood center support beam in cellar is rotted and defective at various locations. temporary shoring in place.sections of fire rated ceiling are missing in cellar. remedy: make all
Nov 10, 2011 · Penalty $500
Resolve - Class - 1
Failure to maintain bldg in a code-compliant manner. defects noted: attime of inspection there are rotted/deteriorated joist at various locations of basement where joist enters walls. some vertical supports for
Oct 27, 2011 · Penalty $1,000
Resolve - Class - 3
Work w/o a permit. noted: in the rear yard of drycleaners/laundromat a 2'-0" x 1'-0" section of the rear firewall removed so as to facilitate the exhaust of lint & any other waste. remedy: obtain permit or
Sep 17, 2008 · Penalty $100
Resolve - Hazardous
Failure to maintain: note. approx 6x8 section 7 floor ceiling collapsed. creating an absence of a free rated ceiling, ceilings throughout 8th floor in disrepair, broken and missing sections failing to provide
Jul 28, 2004
Resolve - Non-hazardous
Failure to maintian exterior building walls. (10 section of brick work building at thrid floor front (20 south east corner wall brick work open missing and spalling with cracked & open section of mortar coverin
Feb 14, 2002 · Penalty $800
Resolve - Hazardous
Failure to maintain-exterior building wall defect noted: bulging brickwork at 3 floor in front imminent danger of collapse: area affected approx 20' wide x6' high x 3' to 4' projection from plumb. front entranc
Jul 8, 1994 · Penalty $800
Resolve
Complaints
- Heat/hot water
Entire building
Oct 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 18, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Mar 7, 2026 · Apt BLDG
Close - General
Bell/buzzer/intercom
Mar 7, 2026 · Apt 3A
Close - General
Bell/buzzer/intercom
Mar 6, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Feb 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 18, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Feb 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2026 · Apt BLDG
Close - Door/window
Door
Jan 6, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Dec 24, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 23, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 22, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 15, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 9, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Dec 8, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Dec 8, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 23, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 22, 2025 · Apt 1B
Close - Heat/hot water
Entire building
Nov 15, 2025 · Apt 3B
Close - Heat/hot water
Entire building
Nov 11, 2025 · Apt BLDG
Close - Door/window
Door
Aug 25, 2025 · Apt 3A
Close - Paint/plaster
Wall
Aug 25, 2025 · Apt 3A
Close - Paint/plaster
Wall
Aug 25, 2025 · Apt 3A
Close - Flooring/stairs
Floor
Aug 25, 2025 · Apt 3A
Close - Paint/plaster
Wall
Aug 25, 2025 · Apt 3A
Close - Flooring/stairs
Floor
Aug 25, 2025 · Apt 3A
Close - Flooring/stairs
Floor
Aug 25, 2025 · Apt 3A
Close - Flooring/stairs
Floor
Jul 28, 2025 · Apt 3A
Close - Flooring/stairs
Floor
Jul 28, 2025 · Apt 3A
Close - Unsanitary condition
Pests
Jul 15, 2025 · Apt 3A
Close - Flooring/stairs
Floor
Jul 15, 2025 · Apt 3A
Close - Flooring/stairs
Floor
Jul 15, 2025 · Apt 3A
Close - Flooring/stairs
Floor
Jul 15, 2025 · Apt 3A
Close - Flooring/stairs
Floor
Jul 15, 2025 · Apt 3A
Close - Paint/plaster
Wall
Jun 19, 2025 · Apt 3A
Close - Paint/plaster
Wall
Jun 10, 2025 · Apt 3A
Close - Flooring/stairs
Floor
Jun 10, 2025 · Apt 3A
Close - Flooring/stairs
Floor
Jun 10, 2025 · Apt 3A
Close - Flooring/stairs
Floor
May 29, 2025 · Apt 3A
Close - Unsanitary condition
Garbage/recycling storage
May 29, 2025 · Apt 3A
Close - Unsanitary condition
Pests
May 29, 2025 · Apt 3A
Close - Paint/plaster
Wall
May 29, 2025 · Apt 3A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C4)
- Year built
- 1900
- Floors
- 3
- Residential units
- 6
- Building area
- 3,402 ft²
- Lot area
- 1,852 ft²
- Zoning
- C1-9A
- Community board
- 106
- Council district
- 4
- Block / lot
- 915 / 8
- Assessed value
- $1,187,100
- Landmark / historic district
- No
HPD registration #138514, last renewed Jul 10, 2025.
Questions about 213 East 34 Street
Who owns 213 East 34 Street?
The owner of record in NYC Department of City Planning PLUTO data is 213 East 34 LLC.
Does 213 East 34 Street have violations?
Yes. NYC HPD has recorded 181 housing violations at this property.
Is 213 East 34 Street rent stabilized?
NYC Department of Finance tax bills listed 5 rent-stabilized units here in 2024 (about 83% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 213 East 34 Street built?
City records list 1900 as the year it was built.
How many apartments are in 213 East 34 Street?
It has 6 residential units and 7 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.