roofy

135 East 39 Street

Manhattan, NY 10016BBL 1-00895-0031Map

Owner of record: 13539 Owners Corp

135 East 39 Street is an elevator apartment building built in 1930 in Manhattan, 10016. It has 29 residential units across 6 floors. The owner of record is 13539 Owners Corp. HPD has recorded 35 housing violations here, most recently on August 4, 2022. 26 of the 35 most recent violations are still open.

HPD violations
35
DOB violations
26
ECB violations
5
HPD complaints
17

What to know

Concern
7 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Aug 4, 2022

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 35

  • C

    Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 4e, 4th story, 1st apartment from west at north

    Aug 4, 2022 · Apt 4E

    Open — Nov sent out
  • C

    Remove device preventing door from being self-closing consisting of door holding device (hook) installed at interior of vestibule door at public hall, 1st story

    Aug 4, 2022

    Closed — Violation closed
  • C

    Remove device preventing door from being self-closing consisting of door holding device (hook) installed at interior of building entrance door from street level

    Aug 4, 2022

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Mar 17, 2020

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Mar 17, 2020

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Mar 17, 2020

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Mar 17, 2020

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Mar 17, 2020

    Closed — Violation dismissed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Mar 17, 2020

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at 1st story public hall and outside door of boiler room

    Mar 17, 2020

    Open — Invalid certification
Show 25 more ↓
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 2, 2015

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of concealed water leak at ceiling in the 3rd room from north at east located at apt 1ab, 1st story, 1st apartment from south at west

    Aug 1, 2000 · Apt 1AB

    Open — Nov sent out
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from north at east located at apt 1ab, 1st story, 1st apartment from south at west

    Aug 1, 2000 · Apt 1AB

    Open — Nov sent out
  • B

    Remove the illegal fastening door in the entrance located at apt 1ab, 1st story, 1st apartment from east at south

    Apr 11, 2000 · Apt 1AB

    Open — Nov sent out
  • B

    Properly repair the broken or defective ceiling light in the 1st room from north at west located at apt 1ab, 1st story, 1st apartment from east at south

    Apr 11, 2000 · Apt 1AB

    Open — Nov sent out
  • B

    Properly repair the broken or defective ceiling light in the kitchen located at apt 1ab, 1st story, 1st apartment from east at south

    Apr 11, 2000 · Apt 1AB

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceilings in the entire apartment located at apt 1ab, 1st story, 1st apartment from east at south

    Apr 11, 2000 · Apt 1AB

    Open — Nov sent out
  • B

    Remove the illegal fastening double cylinder lock entrance door 1 sty southwest apt 1ab. , section '' ''

    May 17, 1999 · Apt 1AB

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color walls & ceilings throughout 1 sty southwest apt 1ab. , section '' ''

    May 17, 1999 · Apt 1AB

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling south wall and west wall kitchen 1 sty west apt 1ab. , section '' ''

    Jul 16, 1998 · Apt 1AB

    Open — Nov sent out
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling south room 1 sty west apt 1ab. , section '' ''

    Jul 16, 1998 · Apt 1AB

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls thru out bathroom 1 sty west apt 1ab. , section '' ''

    Jul 16, 1998 · Apt 1AB

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling foyer 1 sty west apt 1ab. , section '' ''

    Jul 16, 1998 · Apt 1AB

    Open — Nov sent out
  • B

    Repair or replace the smoke detector missing 1 sty west apt 1ab borobio. , section '' ''

    Jul 16, 1998 · Apt 1AB

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling 1 sty west apt 1ab thru out. , section '' ''

    Dec 20, 1996 · Apt 1AB

    Open — Nov sent out
  • C

    Remove the illegal fastening key operated double cylinder lock installed at entrance to 1 sty front west apt 1a. located at apt 1a

    Jun 10, 1991 · Apt 1A

    Open — Nov sent out
  • B

    Arrange and make self-closing the doors 3 sty front east apt 3c entrance. , section '' ''

    Jun 10, 1991 · Apt 3C

    Open — Nov sent out
  • B

    Arrange and make self-closing the doors 6 sty northeast apt 6d entrance. located at apt 6d

    Jun 5, 1991 · Apt 6D

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing 1 sty public hall.

    Jun 5, 1991

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing 1 sty public hall and boiler room door.

    Jun 5, 1991

    Open — Nov sent out
  • B

    D26-10.01 adm code & 309 m/d law abate the nuisance consisting of exposed electric wiring ceiling fixture kitchen 5 sty center front apt 5b. located at apt 5b

    Jun 5, 1991 · Apt 5B

    Open — Nov sent out
  • A

    D26-16.01 adm code repair the leaky and/or defective faucets bathtub bathroom 5 sty center front apt 5b. located at apt 5b

    Jun 5, 1991 · Apt 5B

    Open — Nov sent out
  • A

    D26-10.01 adm code properly repair the broken or defective paving center yard.

    Jun 5, 1991

    Open — Nov sent out
  • A

    D26-10.01 adm code repair the broken or defective plastered surfaces and paint in a uniform color kitchen walls and ceiling 1 sty south west apt 1ab. located at apt 1ab

    Nov 16, 1990 · Apt 1AB

    Open — Nov sent out
  • A

    D26-12.01 adm code paint with light colored paint to the satisfaction of this department walls and ceiling throughout 4 sty south at west apt 4b. , section '' ''

    Nov 16, 1990 · Apt 4B

    Open — Nov sent out

DOB building violations · 26

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 5, 2025

    Dob violation - dismissed
  • Elevator elevatorrequired

    Damage to 6th floor hoistway door interlock and car door. oil on brake shoes. must replace and re- inspected by a d.o.b. inspector. cease use

    Dec 16, 2024

    Dob violation - active
  • Construction other optional

    Structural rendered non complaint. at time of inspection observed elevator cabin sliding door partially removed at 6 floor to evacuate individuals from elevator.

    Dec 13, 2024

    Dob violation - active
  • Hazardous condition (facade) facade required

    Cycle 9a unsafe report filed

    Dec 23, 2021

    Dob violation - active
  • Failure to correct swarmp conditions (facade) facade required

    Cycle 9a failure to correct swarmp conditions

    Dec 23, 2021

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2021

    Dob violation - active
  • Elevator elevatorrequired

    Cease use

    Feb 21, 2019

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 27, 2017

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 9, 2017

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 9, 2017

    Dob violation - resolved
Show 16 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 5, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 7, 2016

    Dob violation - active
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst

    May 30, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 9, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 12, 2013

    Dob violation - resolved
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7a technical report by 02/21/2012

    Jan 31, 2013

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 16, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 6, 2008

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 6, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 11, 2007

    Dob violation - resolved
  • Facade facade optional

    Ll1198-local law 11/98 - facade facade optional

    Nov 30, 2007

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 10, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 28, 2005

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Elevator elevatorrequired

    1p16860

    Jun 11, 1999

    Dob violation - active

ECB violations · 5

  • Class - 1

    At time of inspection observed elevator city device # 12043 out of service due to water sewer pipe at cellar elevator motor room leaking from the ceiling onto elevator motor and related electrical devises., rep

    Dec 13, 2024 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to maintain building in code compliant manner lack of a systemof automatic sprinklers were required per bc903.2;27-954.laundry room has more than two gas dryers which requires a sprinkler system.rem:pro

    Sep 28, 2017

    Resolve
  • Class - 1

    Work without a permit.laundry room located in cellar was installed without permits.laundry room has complete piping water supplied waste gaspiping.no record of laundry room on the c of o utility call to local g

    Sep 28, 2017 · Penalty $1,600

    Resolve
  • Non-hazardous

    25d06,38b09,41o02,51d06,58d06.38-counterweights on car top.41-clean selector cable.58-secure nut on brake assembly(plunger).51-antispin-secure as per code.

    Sep 19, 2007 · Penalty $180

    Resolve
  • Non-hazardous

    02x10,25l10,56m07,38o02,71m07,38m07,36m07,84a09.02x10-provide bell when stop switch is pushed.25l10-repair top emergency exit cover.56m07-provide city id tag.38o02-clean car top.71m07-provide guard light bulb

    Apr 17, 2007 · Penalty $350

    Resolve

Complaints

  • Plumbing

    Water supply

    Jul 29, 2025 · Apt 6A

    Close
  • Plumbing

    Water supply

    Nov 8, 2023 · Apt 6A

    Close
  • Plumbing

    Water supply

    Aug 9, 2022 · Apt BASEME

    Close
  • Plumbing

    Water supply

    Aug 5, 2022 · Apt 6D

    Close
  • Plumbing

    Water supply

    Aug 1, 2022 · Apt 4E

    Close
  • Plumbing

    Water supply

    Aug 1, 2022 · Apt 4E

    Close
  • Heat/hot water

    Entire building

    Mar 13, 2020 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Mar 13, 2020 · Apt A

    Close
  • Heating

    Heat related

    Jan 20, 2012 · Apt 12

    Close
  • Paint/plaster

    Ceiling

    Feb 28, 2005 · Apt 2C

    Close
Show 7 more ↓
  • Paint/plaster

    Ceiling

    Feb 28, 2005 · Apt 2C

    Close
  • Paint/plaster

    Ceiling

    Feb 28, 2005 · Apt 2C

    Close
  • Plumbing

    Water-leaks

    Feb 28, 2005 · Apt 2C

    Close
  • Plumbing

    Water-leaks

    Feb 28, 2005 · Apt 2C

    Close
  • Plumbing

    Water-leaks

    Feb 28, 2005 · Apt 2C

    Close
  • Heating

    Heat related

    Nov 2, 2004 · Apt BLDG

    Close
  • Heating

    Heat related

    Oct 23, 2004 · Apt BST

    Close

Sales history

DatePriceTypeUnits
Jun 3, 2026$695,000Coops - elevator apartments—
May 27, 2026$575,000Coops - elevator apartments—
Oct 14, 2025$500,000Coops - elevator apartments—

Building details

Building type
Elevator apartment building (D4)
Year built
1930
Floors
6
Residential units
29
Building area
26,070 ft²
Lot area
6,464 ft²
Zoning
R8B
Community board
106
Council district
4
Block / lot
895 / 31
Assessed value
$4,047,750
Landmark / historic district
No

HPD registration #117364, last renewed Sep 10, 2025.

Questions about 135 East 39 Street

Who owns 135 East 39 Street?

The owner of record in NYC Department of City Planning PLUTO data is 13539 Owners Corp.

Does 135 East 39 Street have violations?

Yes. NYC HPD has recorded 35 housing violations at this property.

Is 135 East 39 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 135 East 39 Street built?

City records list 1930 as the year it was built.

How many apartments are in 135 East 39 Street?

It has 29 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.