roofy

62 7 Avenue

Manhattan, NY 10011BBL 1-00618-0032Map

Owner of record: Checo 200 West 14th LLC

62 7 Avenue is a walk-up apartment building built in 1901 in Manhattan, 10011. It has 12 residential units across 5 floors. The owner of record is Checo 200 West 14th LLC. HPD has recorded 81 housing violations here, most recently on April 29, 2026. 7 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.

HPD violations
81
DOB violations
9
ECB violations
41
HPD complaints
196

What to know

Concern
3 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Apr 29, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
6
About 50% of the building's 12 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 81

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 29, 2026

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 4, 2025

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall

    Jun 4, 2024

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 5n, 4th story, 1st apartment from south at west

    Jun 4, 2024 · Apt 5N

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 5n, 4th story, 1st apartment from south at west

    Jun 4, 2024 · Apt 5N

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic-tiles at west wall in vestibule hall , 1st story

    May 6, 2024

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of garbage bags at public hall, 1st story

    May 6, 2024

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective mable wall tile at west wall in vestibule at public hall, 1st story

    Apr 26, 2024

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 1st story

    Apr 26, 2024

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story

    Apr 26, 2024

    Closed — Violation closed
Show 40 more ↓
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story

    Mar 20, 2024

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story

    Mar 20, 2024

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective located at apt 4e, 4th story, apartment at east

    Mar 1, 2024 · Apt 4E

    Closed — Violation closed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 3e, 3rd story, 1st apartment from north at east

    Mar 1, 2024 · Apt 3E

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls and at the ceiling in the bathroom located at apt 3e, 3rd story, 1st apartment from north at east

    Mar 1, 2024 · Apt 3E

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at the west wall and ceiling in the bathroom located at apt 3e, 3rd story, 1st apartment from north at east

    Mar 1, 2024 · Apt 3E

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing located at apt 3e, 3rd story, 1st apartment from north at east

    Mar 1, 2024 · Apt 3E

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3e, 3rd story, 1st apartment from north at east

    Mar 1, 2024 · Apt 3E

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing located at apt 4e, 4th story, 1st apartment from north at east

    Mar 1, 2024 · Apt 4E

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 2; in the entire apartment located at apt 3e, 3rd story, 1st apartment from north at east

    Mar 1, 2024 · Apt 3E

    Closed — Violation closed
  • C

    Properly secure the loose first tread from bottom up at public hall stairs, 2nd story

    Feb 26, 2024

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges. in the entrance located at apt 5n, 4th story, 1st apartment from south at west

    Feb 26, 2024 · Apt 5N

    Closed — Violation closed
  • B

    Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 3e, 4th story, 1st apartment from north at east

    Jun 16, 2023 · Apt 3E

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 3e, 4th story, 1st apartment from north at east

    Jun 16, 2023 · Apt 3E

    Closed — Violation dismissed
  • B

    Provide an adequate supply of gas to the fixtures . in the kitchen located at apt 3e, 4th story, 1st apartment from north at east

    Jun 16, 2023 · Apt 3E

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of garbage bins at public hall, 1st story

    May 10, 2023

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story

    May 10, 2023

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story

    May 10, 2023

    Closed — Violation closed
  • C

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 5n, 4th story, 1st apartment from south at west

    May 1, 2023 · Apt 5N

    Closed — Violation closed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 3s, 3rd story, 1st apartment from east at south

    May 25, 2022 · Apt 3S

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3s, 3rd story, 1st apartment from east at south

    May 25, 2022 · Apt 3S

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 3s, 3rd story, 1st apartment from east at south

    May 25, 2022 · Apt 3S

    Closed — Violation closed
  • C

    Trace and repair the source and abate the visible mold condition... at ceiling 40 sq ft, north wall 20 sq ft and south wall 15 sq ft in the kitchen located at apt 3s, 3rd story, 1st apartment from east at south

    May 25, 2022 · Apt 3S

    Open — Defect letter issued
  • B

    Remove all encumbrances consisting of garbage bins at public hall, 1st story

    May 25, 2022

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... at north 10 sq ft and east 5 sq ft walls in the 4th room from east at north located at apt 3s, 3rd story, 1st apartment from east at south

    May 25, 2022 · Apt 3S

    Open — Defect letter issued
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east at north located at apt 3s, 3rd story, 1st apartment from east at south

    May 25, 2022 · Apt 3S

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, south and west walls in the 4th room from east at south located at apt 3s, 3rd story, 1st apartment from east at south

    May 25, 2022 · Apt 3S

    Closed — Violation closed
  • C

    Trace and repair the source and abate the visible mold condition... at east 20 sq ft, north 20 sq ft and south 20 sq ft walls in the bathroom located at apt 3s, 3rd story, 1st apartment from east at south

    May 25, 2022 · Apt 3S

    Open — Defect letter issued
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling and north wall in the private hallway located at apt 3s, 3rd story, 1st apartment from east at south

    May 25, 2022 · Apt 3S

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the foyer located at apt 3s, 3rd story, 1st apartment from east at south

    May 25, 2022 · Apt 3S

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the private hallway located at apt 3s, 3rd story, 1st apartment from east at south

    May 25, 2022 · Apt 3S

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... approx 20 sq feet at ceiling in the bathroom located at apt 3s, 3rd story, 1st apartment from east at south

    May 19, 2022 · Apt 3S

    Open — Defect letter issued
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3s, 3rd story, 1st apartment from east at south

    May 19, 2022 · Apt 3S

    Closed — Violation closed
  • C

    Trace and repair the source and abate the visible mold condition... appprox 30 sq at all walls and ceiling in the kitchen located at apt 3s, 3rd story, 1st apartment from east at south

    May 19, 2022 · Apt 3S

    Open — Defect letter issued
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 3s, 3rd story, 1st apartment from east at south

    May 19, 2022 · Apt 3S

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 3s, 3rd story, 1st apartment from east at south

    May 19, 2022 · Apt 3S

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 3s, 3rd story, 1st apartment from east at south

    May 19, 2022 · Apt 3S

    Closed — Violation closed
  • A

    Post and maintain a street number on the front of the dwelling plainly visible from the sidewalk., 1st story

    May 19, 2022

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... approx 25 sq feet at ceiling and north wall in the private hallway located at apt 3s, 3rd story, 1st apartment from east at south

    May 19, 2022 · Apt 3S

    Open — Defect letter issued
  • B

    Properly repair the source and abate the evidence of a water leak at south wall inside closet in the 2nd room from east located at apt 3n, 3rd story, 1st apartment from south at west

    May 13, 2022 · Apt 3N

    Closed — Violation closed

DOB building violations · 9

  • Construction other optional

    Ftc w/commissioner's order#341490 vio#071025pi10201sb dated 07/10/25 requiring owner to provide a corrective action plan by 08/10/25&start bldg repairs under permit by 09/10/2025&compl/signed off by 10/10/2025 as of 11/17/25 a revised cap was not submitted following dob rejection immed comply w/commissioner's order#341490 vio#071025pi10201sb

    Nov 17, 2025

    Dob violation - active
  • Construction other optional

    Corrective action plan req'd-obsvd @ exp 1&2 haz conditions such as spalling/cracked masonry @ mult lications. @ exp1 on top of main entrance obsvd spalled off masonry @ decorative stone loose masonry @ watertable. owner to immed retain a reg design prof to eval entire bld & submit a corrective action plan to [email protected]

    Jul 10, 2025

    Dob violation - active
  • Construction other optional

    Emergency work order req'd-obsvd @ exp1&2 haz conditions such as spalling/cracked masonry @ mult locations. owner to immed provide safety measures to secure/protect public @ exp1 w. 14 st and exp2 7 ave. install s/w full s/w fronage @ 14 st and 7 ave

    Jul 10, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Immediate emergency anythingoptional

    Imegncy-immediate emergency anythingoptional

    Dec 27, 2012

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 28, 2010

    Dob violation - resolved
  • Electric signs none

    Es-electric signs none

    Jul 2, 1990

    Dob violation - dismissed
  • Electric signs none

    Es-electric signs none

    Jul 2, 1990

    Dob violation - dismissed

ECB violations · 41

  • Class - 2

    At time of inspection i observed sidewalk shed installed on exposure #1 and 2 with inoperable light bulbs at underside the shed to bring illumination failure to provide lighting creates unsafe and mugging condi

    Apr 21, 2026 · Penalty $5,000

    Resolve
  • Class - 1

    Failure to comply and maintain as per code specifications. observed supported scaffold with lose netting by adjacent building and missing toe boards on several levels were not complying with the required safety

    Mar 25, 2026 · Penalty $5,000

    Resolve
  • Class - 1

    Failure to comply with commissioner's order vio#111725pi10202zt control #350372 dated 11/17/2025. no compliance on file for corrective action plan. remedy: comply with the commissioner's order.

    Dec 26, 2025 · Penalty $6,250

    Active
  • Class - 1

    Failure to maintain building in a code-compliant manner. bldg is 5 story and basement multiple dwelling with commercial store fronts on the corner lot. and at exposures 1 and 2 hazardous conditions such as spal

    Jul 10, 2025

    Resolve
  • Class - 2

    Illegal use in a commercial district. unlicensed physical treatment establishment a prohibited use per zr 12-10 operating in a c6-3a zoning district. cellar level doing business as "k x y spa" w/ 3 massage room

    Apr 28, 2023

    Resolve
  • Class - 2

    Occupancy contrary to that allowed by the certificate of occupancy#48808. illegal occupancy noted:at the cellar level converted/occupied as "kxy spa" w/ 3 massage rooms,massage tables,oils&towels.(establishment

    Apr 28, 2023

    Resolve
  • Class - 2

    Work w/o a permit. noted: sign 3.5 x 2.5 x 1' wording "best of new york" 12'high on exp#1 & 2 wall w/o permit(permit expired in 2006). remedy: obtain all required permits.

    Mar 2, 2016 · Penalty $400

    Resolve
  • Class - 1

    Failure to maintain bldg in a code-compliant manner.noted:at cornice of east facing elevation(7th avenue)approx 10'x15'section of decorativepressed metal displaced,dislodged & in danger of collapse.rmdy:make sa

    Dec 8, 2012 · Penalty $1,000

    Resolve
  • Class - 2

    Sec 28-201.1 unlawful acts failure to comply w/ an order of the commissioner noted ecb violation #34392473r issued for work w/o a permit on 4/1/03 no cert of correction filed no permits approved or issued for w

    Mar 24, 2009

    Resolve
  • Non-hazardous

    Having awning signage exceeding 12 sq ft. having awning signage with letters higher than 12 in. remove illegal signage

    Jan 23, 2003

    Resolve
Show 31 more ↓
  • Non-hazardous

    Having signage (double or multifaced) projecting more than 18 in across the street line. remedy:remove illegal signage

    Jan 23, 2003

    Resolve
  • Non-hazardous

    Having a ground sign projecting beyond the street line. remedy:remove illegal work.

    Jan 23, 2003

    Resolve
  • Non-hazardous

    Having an illuminatd sign w/out a current permit. remedy:remove illegal work

    Jan 23, 2003

    Resolve
  • Non-hazardous

    Having installed a sign w/out a permit. remedy:remove illegal work.

    Jan 23, 2003

    Resolve
  • Non-hazardous

    Having install awnings w/out a permit. remedy:remove illegal work.

    Jan 23, 2003

    Resolve
  • Non-hazardous

    Having(parallel or wall) signage projecting more than 12in across the street line. remedy:remove illegal signage.

    Jan 23, 2003

    Resolve
  • Non-hazardous

    Having a wall sign projecting beyond wall surface/street line. remedy:remove illegal work.

    Jan 23, 2003

    Resolve
  • Non-hazardous

    Having an illuminated sign w/out a current permit. remedy:remove illegal work

    Jan 23, 2003

    Resolve
  • Non-hazardous

    Having installed signs (20 without a permit.

    Jan 23, 2003

    Resolve
  • Non-hazardous

    Having installed an awning without a permit. remedy: remove illegal work.

    Jan 22, 2003

    Resolve
  • Non-hazardous

    Having (paraller or wall) signage projecting more than 12 in across the street line. remedy: remove illegal signage.

    Jan 22, 2003

    Resolve
  • Non-hazardous

    Having installed signs 4, without a permit. remedy: remove illegal work.

    Jan 22, 2003

    Resolve
  • Non-hazardous

    Having a wall sign projecting more than 12 inches over the sidewalk.

    Jan 22, 2003

    Resolve
  • Non-hazardous

    Having signage (double or multificate) projecting more than 18 in across the street line. remedy: remove illegal signage.

    Jan 22, 2003

    Resolve
  • Non-hazardous

    Having a wall sign projecting beyond wall surface street line. remedy: remove illegal work.

    Jan 22, 2003

    Resolve
  • Non-hazardous

    Having installed a sign without a permit. remedy: remove illegal work.

    Jan 22, 2003

    Resolve
  • Non-hazardous

    Having an illminated sign without a current permit. remedy: remove illegal work.

    Jan 22, 2003

    Resolve
  • Non-hazardous

    Having a wall sign projecting 12 inches over the sidewalk. remedy; remove illegal work.

    Jan 22, 2003

    Resolve
  • Non-hazardous

    Having a wall sign projecting beyond wall surface street line. remedy remove illegal work.

    Jan 22, 2003

    Resolve
  • Non-hazardous

    Having (parallel or wall) signage projecting more than 12 inches across the street line. remedy: remove illegal signage.

    Jan 22, 2003

    Resolve
  • Non-hazardous

    Having a wall sign projecting more than 12 inches over the sidewalk. remedy: remove illegal work.

    Jan 22, 2003

    Resolve
  • Non-hazardous

    Having installed a sign without a permit. remedy: remove illegal work.

    Jan 22, 2003

    Resolve
  • Non-hazardous

    Having flashing signage in a window in a c6-2m district. remedy; remove illegal signage.

    Jan 22, 2003

    Resolve
  • Non-hazardous

    Having installed a sign without a permit. remedy: remove illegal work .

    Jan 22, 2003

    Resolve
  • Hazardous

    Failure to maintian bldg : noted 91) 4 broken panes of glass at sidewalk level. (2) approx 50% of mulliuns + muntins missing from glass storefront creating a very hazardous condition to public ( glass not secon

    Oct 25, 2002 · Penalty $180

    Resolve
  • Non-hazardous

    Failure to maintain exterior building wall noted decorative brown stone facade spalling and chipping location 1fl thru 5fl north wall entire remedy repair defects as per code immediately.

    Feb 25, 1998 · Penalty $350

    Resolve
  • Non-hazardous

    Work without a permit. noted: a wooden frame and plastic enclosure with glass display shelves has been erected creating a hazardous projection on to public space. approx. size 25'x 20'x10' high triangular shape

    Jan 7, 1998

    Resolve
  • Non-hazardous

    Work without a permit completed prior to inspection noted:a woodginderwith steel lolly column supports have been erected at street line.a w-ood(2x4)roof assembly with plywood cover has been erected creating an

    Feb 24, 1995

    Resolve
  • Hazardous

    Failure to maintain defect is noted area way on north side of building approx 80' from cor 14th st & 7th ave retaining wall for basement strair broken missing & defective out of plumb 10' in 10' and out of lin

    Jul 12, 1993 · Penalty $800

    Resolve
  • Hazardous

    Failure to maintain defect is noted stairs leading to basement store located on the north side of 200 w 14 st approx 80' from sw corner of 14 st & 7 ave is broken missing & defective stair is buckling creating

    Jul 12, 1993

    Resolve
  • Non-hazardous

    In that plumbing fixtures and cooking equipment installed in cellar without plans or permits. remedy: obtain necessary permits and plans to leagalize or to remove.

    Sep 16, 1992

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Apr 6, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Feb 9, 2026 · Apt 5E

    Close
  • Heat/hot water

    Entire building

    May 25, 2025 · Apt 3S

    Close
  • Heat/hot water

    Entire building

    Feb 20, 2025 · Apt 3S

    Close
  • Heat/hot water

    Entire building

    Feb 19, 2025 · Apt 3S

    Close
  • Heat/hot water

    Entire building

    Feb 8, 2025 · Apt 3S

    Close
  • Heat/hot water

    Entire building

    Jan 29, 2025 · Apt 3S

    Close
  • Heat/hot water

    Entire building

    Jan 24, 2025 · Apt 3S

    Close
  • Heat/hot water

    Entire building

    Jan 17, 2025 · Apt 3S

    Close
  • Heat/hot water

    Entire building

    Jan 14, 2025 · Apt 3S

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Jan 9, 2025 · Apt 3S

    Close
  • Heat/hot water

    Entire building

    Dec 30, 2024 · Apt 3S

    Close
  • Heat/hot water

    Entire building

    Nov 20, 2024 · Apt 3S

    Close
  • Heat/hot water

    Entire building

    Nov 19, 2024 · Apt 3S

    Close
  • Heat/hot water

    Entire building

    Nov 11, 2024 · Apt 3S

    Close
  • Heat/hot water

    Entire building

    Nov 9, 2024 · Apt 3S

    Close
  • Heat/hot water

    Entire building

    Nov 8, 2024 · Apt 3S

    Close
  • Heat/hot water

    Apartment only

    Nov 2, 2024 · Apt 3S

    Close
  • Heat/hot water

    Entire building

    Nov 2, 2024 · Apt 3S

    Close
  • Heat/hot water

    Entire building

    Oct 27, 2024 · Apt 3S

    Close
  • Heat/hot water

    Entire building

    Oct 25, 2024 · Apt 3S

    Close
  • Heat/hot water

    Entire building

    Oct 18, 2024 · Apt 3S

    Close
  • Heat/hot water

    Entire building

    Oct 14, 2024 · Apt 3S

    Close
  • Heat/hot water

    Entire building

    May 10, 2024 · Apt 3S

    Close
  • Heat/hot water

    Entire building

    May 4, 2024 · Apt 3F

    Close
  • Heat/hot water

    Entire building

    May 3, 2024 · Apt 3S

    Close
  • Heat/hot water

    Entire building

    Apr 25, 2024 · Apt 3S

    Close
  • Heat/hot water

    Entire building

    Apr 17, 2024 · Apt 3S

    Close
  • Heat/hot water

    Entire building

    Apr 17, 2024 · Apt 3S

    Close
  • Heat/hot water

    Entire building

    Apr 13, 2024 · Apt 3S

    Close
  • Heat/hot water

    Entire building

    Apr 13, 2024 · Apt 3S

    Close
  • Heat/hot water

    Entire building

    Apr 11, 2024 · Apt 3S

    Close
  • Heat/hot water

    Entire building

    Apr 1, 2024 · Apt 3S

    Close
  • Heat/hot water

    Apartment only

    Mar 18, 2024 · Apt 3S

    Close
  • Heat/hot water

    Entire building

    Mar 18, 2024 · Apt 3S

    Close
  • Heat/hot water

    Entire building

    Mar 18, 2024 · Apt 3S

    Close
  • Heat/hot water

    Entire building

    Mar 16, 2024 · Apt 3S

    Close
  • Heat/hot water

    Entire building

    Mar 13, 2024 · Apt 3S

    Close
  • Door/window

    Door

    Feb 20, 2024 · Apt 4E

    Close
  • Safety

    Smoke detector

    Feb 20, 2024 · Apt 5N

    Close
  • Safety

    Carbon monoxide detector

    Feb 20, 2024 · Apt 5N

    Close
  • Appliance

    Electric/gas range

    Feb 20, 2024 · Apt 3E

    Close
  • Paint/plaster

    Wall

    Feb 20, 2024 · Apt 3E

    Close
  • Safety

    Carbon monoxide detector

    Feb 20, 2024 · Apt 3E

    Close
  • Safety

    Smoke detector

    Feb 20, 2024 · Apt 3E

    Close
  • Door/window

    Door

    Feb 20, 2024 · Apt 3E

    Close
  • Safety

    Fire escape

    Feb 20, 2024 · Apt 3E

    Close
  • Safety

    Carbon monoxide detector

    Feb 20, 2024 · Apt 4E

    Close
  • Safety

    Smoke detector

    Feb 20, 2024 · Apt 4E

    Close
  • Heat/hot water

    Entire building

    Oct 29, 2023 · Apt 3S

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C7)
Year built
1901
Floors
5
Residential units
12
Building area
12,239 ft²
Lot area
2,600 ft²
Zoning
C6-3A
Community board
102
Council district
3
Block / lot
618 / 32
Assessed value
$2,980,350
Landmark / historic district
No

HPD registration #119153, last renewed Jul 25, 2025.

Questions about 62 7 Avenue

Who owns 62 7 Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Checo 200 West 14th LLC.

Does 62 7 Avenue have violations?

Yes. NYC HPD has recorded 81 housing violations at this property.

Is 62 7 Avenue rent stabilized?

NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 50% of its 12 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 62 7 Avenue built?

City records list 1901 as the year it was built.

How many apartments are in 62 7 Avenue?

It has 12 residential units and 18 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.