290 Elizabeth Street
Manhattan, NY 10012BBL 1-00521-0064Map
Owner of record: 290 Elizabeth St LLC
290 Elizabeth Street is a walk-up apartment building built in 1878 in Manhattan, 10012. It has 6 residential units across 4 floors. The owner of record is 290 Elizabeth St LLC. HPD has recorded 85 housing violations here, most recently on June 17, 2026. 6 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 85
- DOB violations
- 3
- ECB violations
- 1
- HPD complaints
- 156
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 85
- BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the 1st room from east located at apt 3r, 3rd story, 1st apartment from north at east
Jun 17, 2026 · Apt 3R
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardent material at ceiling at public hall, 1st story
Apr 16, 2025
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story
Apr 16, 2025
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling south and west walls in vestibule , 1st story
Apr 11, 2025
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 2nd story
Apr 11, 2025
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water temperature exceeding 130 degress. in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east
Apr 11, 2025 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 2nd story
Apr 11, 2025
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling south and west walls in vestibule , 1st story
Apr 11, 2025
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at shower stall in the bathroom located at apt 3r, 3rd story, 1st apartment from north at east
Apr 11, 2025 · Apt 3R
Closed — Violation closed - ANon-hazardous
Provide place within the building for the storage of waste receptacles and disinfect same regularly.
Apr 10, 2025
Open — Not complied with
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and east wall at public hall, 2nd story
Apr 10, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and east wall at public hall, 2nd story
Apr 10, 2025
Closed — Violation closed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Apr 10, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective masonry joints at south exterior wall at rear yard from fourth story to roof
May 9, 2024
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchen located at apt 3r, 3rd story, 1st apartment from east at south
May 9, 2024 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at south wall and ceiling in the kitchen located at apt 3r, 3rd story, 1st apartment from east at south
May 9, 2024 · Apt 3R
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2024
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling at window frame in the kitchen located at apt 3r, 3rd story, 1st apartment from east at south
Apr 1, 2024 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective crown molding at east wall in the 2nd room from east located at apt 3r, 3rd story, 1st apartment from east at south
Apr 1, 2024 · Apt 3R
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east and west walls at window frame in the kitchen located at apt 3r, 3rd story, 1st apartment from east at south
Apr 1, 2024 · Apt 3R
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of leak at radiator valve at public hall, 1st story
Jan 31, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges. in the entrance located at apt 1f, 2nd story, 1st apartment from north at east
Dec 31, 2023 · Apt 1F
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1f, 2nd story, 1st apartment from north at east
Dec 31, 2023 · Apt 1F
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective mechanical air vent at ceiling. in the bathroom located at apt 3r, 3rd story, 1st apartment from north at east
Dec 31, 2023 · Apt 3R
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of shopping cart at public hall, 1st story
Oct 15, 2023
Closed — Violation dismissed - ANon-hazardous
Post a sign indicating hours of collection and method of collection of waste material where dumbwaiter service is not provided.
Oct 15, 2023
Closed — Violation dismissed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Oct 15, 2023
Closed — Violation closed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Sep 20, 2023
Closed — Violation closed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Sep 20, 2023
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items and flower pots at front west balcony at fire escape, 2nd story
Jul 9, 2023
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective heavy duty locking device at the building front entrance door
Jul 9, 2023
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of garbage cans and rubbish. at public hall, 1st story
Jun 13, 2023
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked leading to the boiler room at cellar
Apr 5, 2023
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east
Apr 5, 2023 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2f, 2nd story, 1st apartment from south at west
Feb 26, 2023 · Apt 2F
Closed — Violation closed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration wooden structure erected at west side of building
Dec 27, 2022
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of wooden structure obstructing drop ladder from touching ground at building front( west)
Dec 27, 2022
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling in the bathroom located at apt 3r, 3rd story, 1st apartment from east at south
Nov 29, 2022 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing kick stand installed at building entrance door to vestibule , 1st story
Oct 29, 2022
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective light fixture at ceiling in the entrance located at apt 3r, 3rd story, 1st apartment from north at east
Oct 18, 2022 · Apt 3R
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 3r, 3rd story, 1st apartment from north at east
Oct 18, 2022 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east
Oct 18, 2022 · Apt 3R
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east
Sep 26, 2022 · Apt 3R
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east
Sep 26, 2022 · Apt 3R
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 3r, 3rd story, 1st apartment from north at east
Sep 26, 2022 · Apt 3R
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
Nov 24, 2021 · Apt 3R
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
Nov 24, 2021 · Apt 3R
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing frame at public hall, 1st story
Nov 19, 2021
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story
Nov 19, 2021
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective fire retardent materials at ceiling at public hall, 1st story
Nov 19, 2021
Closed — Violation closed
DOB building violations · 3
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 1
- Class - 2
Work without a permit. at the time of inspection, i observed mechanical work completed for m00790522-i1-ms permit is not issued in dob records., obtain all permits
Mar 24, 2023 · Penalty $1,250
Resolve
Complaints
- Electric
Wiring
May 22, 2026 · Apt 3R
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt 2F
Close - Electric
Wiring
Oct 27, 2025 · Apt 3R
Close - Electric
Lighting
Oct 27, 2025 · Apt 3R
Close - Heat/hot water
Apartment only
Apr 14, 2025 · Apt 3R
Close - Plumbing
Water supply
Apr 9, 2025 · Apt 3R
Close - Plumbing
Water supply
Apr 9, 2025 · Apt 3R
Close - Plumbing
Water supply
Apr 9, 2025 · Apt 3R
Close - Plumbing
Water supply
Apr 9, 2025 · Apt 3R
Close - Plumbing
Water supply
Apr 9, 2025 · Apt 3R
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Apr 9, 2025 · Apt 3R
Close - Paint/plaster
Wall
Apr 9, 2025 · Apt 3R
Close - Unsanitary condition
Garbage/recycling storage
Feb 9, 2025 · Apt 2F
Close - Paint/plaster
Ceiling
Jan 16, 2025 · Apt 2F
Close - Paint/plaster
Wall
Apr 3, 2024 · Apt 3R
Close - Door/window
Window frame
Apr 3, 2024 · Apt 3R
Close - Water leak
Heavy flow
Apr 3, 2024 · Apt 3R
Close - Paint/plaster
Ceiling
Mar 25, 2024 · Apt 3R
Close - Door/window
Window frame
Mar 25, 2024 · Apt 3R
Close - Water leak
Heavy flow
Mar 25, 2024 · Apt 3R
Close - Heat/hot water
Apartment only
Mar 20, 2024 · Apt 3R
Close - Heat/hot water
Apartment only
Mar 18, 2024 · Apt 3R
Close - Heat/hot water
Entire building
Mar 11, 2024 · Apt 3R
Close - Paint/plaster
Ceiling
Mar 11, 2024 · Apt 3R
Close - Water leak
Heavy flow
Mar 11, 2024 · Apt 3R
Close - Door/window
Window frame
Mar 9, 2024 · Apt 3R
Close - Heat/hot water
Entire building
Mar 7, 2024 · Apt 3R
Close - Water leak
Heavy flow
Jan 9, 2024 · Apt 3R
Close - Heat/hot water
Entire building
Dec 31, 2023 · Apt 3R
Close - Heat/hot water
Entire building
Dec 31, 2023 · Apt 2F
Close - Heat/hot water
Apartment only
Dec 30, 2023 · Apt 1F
Close - Heat/hot water
Entire building
Dec 26, 2023 · Apt 1F
Close - Heat/hot water
Entire building
Dec 25, 2023 · Apt 1F
Close - Heat/hot water
Entire building
Dec 25, 2023 · Apt 3R
Close - General
Ventilation system
Dec 19, 2023 · Apt 3R
Close - Water leak
Heavy flow
Dec 19, 2023 · Apt 3R
Close - Heat/hot water
Entire building
Nov 9, 2023 · Apt 3R
Close - Heat/hot water
Entire building
Oct 22, 2023 · Apt 3R
Close - Heat/hot water
Entire building
Oct 13, 2023 · Apt PH
Close - Heat/hot water
Entire building
Oct 12, 2023 · Apt 3R
Close - Unsanitary condition
Garbage/recycling storage
Oct 12, 2023 · Apt 2F
Close - Plumbing
Water supply
Oct 12, 2023 · Apt 2F
Close - Heat/hot water
Entire building
Oct 11, 2023 · Apt 3R
Close - Unsanitary condition
Garbage/recycling storage
Sep 15, 2023 · Apt 1F
Close - Unsanitary condition
Garbage/recycling storage
Sep 7, 2023 · Apt 2F
Close - Heat/hot water
Entire building
Jul 25, 2023 · Apt 3R
Close - Plumbing
Water supply
Jul 8, 2023 · Apt LOWWAT
Close - Door/window
Door
Jul 8, 2023 · Apt BUILDI
Close - Door/window
Door
Jul 4, 2023 · Apt 3R
Close - Water leak
Heavy flow
May 3, 2023 · Apt 3R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C4)
- Year built
- 1878
- Floors
- 4
- Residential units
- 6
- Building area
- 6,678 ft²
- Lot area
- 2,134 ft²
- Zoning
- C6-2
- Community board
- 102
- Council district
- 2
- Block / lot
- 521 / 64
- Assessed value
- $2,308,950
- Landmark / historic district
- NoHo East Historic District
HPD registration #129355, last renewed Jul 20, 2026.
Questions about 290 Elizabeth Street
Who owns 290 Elizabeth Street?
The owner of record in NYC Department of City Planning PLUTO data is 290 Elizabeth St LLC.
Does 290 Elizabeth Street have violations?
Yes. NYC HPD has recorded 85 housing violations at this property.
Is 290 Elizabeth Street rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 100% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 290 Elizabeth Street built?
City records list 1878 as the year it was built.
How many apartments are in 290 Elizabeth Street?
It has 6 residential units and 7 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.