86 Delancey Street
Manhattan, NY 10002BBL 1-00410-0034Map
Owner of record: Ordela LLC
86 Delancey Street is an elevator apartment building built in 2018 in Manhattan, 10002. It has 29 residential units across 12 floors. The owner of record is Ordela LLC. HPD has recorded 12 housing violations here, most recently on June 10, 2025. 1 of the 12 most recent violations are still open. City tax records listed 9 rent-stabilized apartments here in 2024.
- HPD violations
- 12
- DOB violations
- 16
- ECB violations
- 41
- HPD complaints
- 2
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 12
- CImmediately hazardous
M/d law abate the nuisance consisting of 3rd sprinkler water pump from west leaking at cellar
Jun 10, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire pump room door at cellar
Jun 10, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at water - hot water room door at cellar
Jun 10, 2025
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire stairs door ''b'' at cellar
Jun 10, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set at water - hot water room door at cellar
Jun 10, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 10, 2022
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at south wall around window area (approx 3 sq ft) in the 3rd room from north at west located at apt 2c, 2nd story, 1st apartment from east at south
Oct 7, 2021 · Apt 2C
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak around window at south wall in the 3rd room from north at west located at apt 2c, 2nd story, 1st apartment from east at south
Oct 7, 2021 · Apt 2C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color around window area at south wall in the 3rd room from north at west located at apt 2c, 2nd story, 1st apartment from east at south
Oct 7, 2021 · Apt 2C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at west wall in the 2nd room from north at west located at apt 2c, 2nd story, 1st apartment from east at south
Oct 7, 2021 · Apt 2C
Closed — Violation dismissed
Show 2 more ↓
- ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Oct 7, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 20, 2021
Closed — Violation dismissed
DOB building violations · 16
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 9, 2019
Dob violation - dismissed - Construction other optional
C-construction other optional
Apr 11, 2019
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Apr 11, 2019
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Dec 27, 2018
Vp*-violation unserved ecb- dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 31, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 31, 2018
Dob violation - dismissed
Show 6 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 31, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 31, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 31, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 31, 2018
Dob violation - dismissed - Construction other optional
C-construction other optional
Sep 27, 2018
Vp*-violation unserved ecb- dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 18, 2018
Dob violation - dismissed
ECB violations · 41
- Class - 2
Phone not working, fire extinguisher expired, cat 1tags expired.
Jul 14, 2021
Resolve - Class - 1
Owner failed to ensure each construction or demolition worker succesfully completed the required training under bc3321.1 observed ramon quinteros at a building site for which ssm or ssc is required,working with
Dec 2, 2019
Resolve - Class - 1
Permit holder failed to ensure each construction or demolition worker successfully completed the required traning under bc3321.1 observed ramon quinteros at a building site for which a ssm or ssc is required wo
Dec 2, 2019
Resolve - Class - 1
Failrue to institute maintain safety equipment measure or temporary construction no guard rails.at time of inspection on an active jobsite observed inadequate makeshift guardrail system at unprotected exposed g
Dec 2, 2019 · Penalty $2,500
Resolve - Class - 1
Filed a certificate for mapplication etc.constaining a material false statement at time of inspection on an active jobsite observed mordichawaisbrod filed at pw-2 permit application form containing a false stat
Dec 2, 2019
Resolve - Class - 2
Failure to notify the dept prior to installation of suspended scaffold. note: at time of inspection,i observed suspended scaffold on site w/o a notification for suspended scaffold on dept record. do not use or
Aug 23, 2019
Resolve - Class - 1
Sec. 3303.5.4 failure to prevent dust particles(styro foam)from becoming airborne. note: at time of inspection observed light snowing in theair at dalancy st & orchard upon inspecting 118 orchard street 2 worke
Aug 6, 2019 · Penalty $625
Resolve - Class - 2
Failure to safeguard all persons and property affected by constructionoperations. note: at time of inspection observed efis styrofoam pallets all over orchad st and delancey st and all over roofs of adjacent pr
Aug 6, 2019
Resolve - Class - 1
Work doesn't conform to approved construction docs or approved amendments. @ time of insp of a 12 story bldg @ roof level, i observed that the vertical safety netting was built contrary to design drawings in mu
Apr 11, 2019
Resolve - Class - 1
Work doesn't conform to approved construction docs or approved amendments. @ time of insp of a 12 story bldg @ roof level, i observed concrete formwork for bulkhead was built contrary to design drawings. beams
Apr 11, 2019
Resolve
Show 31 more ↓
- Class - 2
During an energy code compliance inspection at new building with permit number 122141351, i observed that there were no complete sets of dob approved plans at site. energy calculation plans and exterior wall de
Mar 25, 2019 · Penalty $312
Resolve - Class - 1
28-105.12.8 work is not in accordance with site safety plan. noted at time of inspeciton the construction site jersey barriers are not as per site safety plan jersey barriers not filled with water, no water
Mar 11, 2019
Resolve - Class - 1
Failure to safeguard all persons and proeprty affeced by construction operations-as per site safety manager simon b leykin lic#m002198 a delivery man was injured when the construction jersey barrier felled onto
Mar 11, 2019
Resolve - Class - 2
Sec. 3309.1 failure to adequately protect adjoining properties during construction. at the time of inspection i observed inadequate roof protection at exp#3&4. roof protection missing at exp#3 adjacent bldg
Feb 27, 2019 · Penalty $625
Resolve - Class - 2
No site-specific framework design drawings provided. at time of inspection site specific design drawings for platform & ladders in elevator shaft for temporary means of egress could not be provided.
Feb 27, 2019 · Penalty $312
Resolve - Class - 1
Secureness of reshores missing-at the time of inspection i observed reshores within 10 feet of an unenclosed perimeter not secured from falling off the bldg. remedy: secure reshores at leading edge.
Feb 27, 2019 · Penalty $5,000
Resolve - Class - 1
Failure to maintain guardrails. at the time of inspection i observed 3/8 wire calbe guardrails that were not taut. the cables were missing minimum 3 clamps as per design drawings in various locations.
Feb 27, 2019 · Penalty $2,500
Resolve - Class - 1
Unsafe storage of materials during construction. at time of inspectioni observed a pile of metal studs & track within 10 feet of the leading edge. plywood stacked against a wall 10 feet within leading edge. thi
Feb 27, 2019 · Penalty $2,500
Resolve - Class - 2
Signs posted on sidewalk shed. at time of inspection i observed signs posted on the sidewalk shed at exp#1&2. remedy: remove signs.
Feb 27, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction. at time of inspection i observed holes in the slab at floors throughout the bldg which were not covered or was not adeqaute. this a hazard
Feb 27, 2019 · Penalty $625
Resolve - Class - 1
Failure to maintain adeqaute housekeeping per section requirements. at the time of inspection i observed debris on the eyebrown of the floor outside the safety netting. pieces of concrete at the edge of the bld
Feb 27, 2019 · Penalty $2,500
Resolve - Class - 2
Failure to provide approved/accepted construction documents at jobsiteat time of inspection. nb#:122141351. during an energy code complianceinspection. i observed that there were no complete sets or dob approve
Feb 6, 2019
Resolve - Class - 1
Work contrary to site safety plan no overhead protection and egress/ ingress door installed. 12 story nb @6th story. active jobsite at the time of my inspection i observed the following; upon my review of the
Dec 27, 2018 · Penalty $2,500
Resolve - Class - 1
Bc3301.4 inspection of structures,temporary construction,oprations & equipment.concrete embedded straps.12 story nb 6th story active jobsite@time of insp i observed concrete straps daily insp logs was inadequat
Dec 27, 2018 · Penalty $312
Resolve - Class - 2
Failure to provide approved/accepted construction documents @ job site@ time of inspection.as noted:@ time of inspection @ an active job site observed no approved structural plans for the work only shop drawing
Oct 24, 2018
Resolve - Class - 2
3307.21 failure to comply with dot regulation as per 34rcny2-05 and admin code provisions 19-107/19-108 or 19-121. at time of inspection dot permits expired 09/24/18, permit type 0211. occupancy of roadway as s
Sep 27, 2018 · Penalty $625
Resolve - Class - 2
Failure to provide pedestrian protection for sidewalk and walkways. at the time of inspection, i observed barriers at walkway with no reflector or light and not filled with water as a safety requirement at exp
Sep 27, 2018 · Penalty $2,400
Resolve - Class - 1
No site specific framework design drawings present per 3301.7. at the time of inspection, i observed a 12 story new building under construction at foundation level with concrete operation form work being instal
Sep 27, 2018 · Penalty $2,500
Resolve - Class - 1
Work contrary to approved plans. at time of inspection on a active jobsite of a 12 sty bldg,currently at soe phase,observed that at exp#4 waker connections do not match w/approved plans. failure to comply w/app
Aug 6, 2018 · Penalty $5,000
Resolve - Class - 1
Sec. 3304.4.4 guardrails at excavation sites. at time of inspection ona active jobsite of a 12 sty bldg,currently at soe,observed that guardrails at exp#1 & 2,were leaning towards excavation w/bldg material lea
Aug 6, 2018 · Penalty $2,500
Resolve - Class - 1
Sec. 3304.7 required means of egress. at time of inspection on a active jobsite of a 12 sty bldg,currently at soe phase,observed that means of egress at exp#1 were compromised by rebards at bottom & scaffold on
Aug 6, 2018 · Penalty $2,500
Resolve - Class - 1
Wokr does not conform to approved site safety plan. at time of inspection on a active jobsite of a 12 sty bldg currently at soe phase,observed that at exp#1(street)fence its less than 3feet of fire hydrant as
Aug 6, 2018 · Penalty $625
Resolve - Class - 1
3301.1.2 failed to comply with nyc fire code,no fire watch,fire guard watch person.note: at the time of my inspection of a 12 story buildingat foundation and excavation phase construction work in progress i
Aug 1, 2018 · Penalty $625
Resolve - Class - 1
3307.7.5 design of fence. noted: at the time of my inspection of a 12 story building at excavation phase construction work in progress.i observed construction fence erected at exposure one and two adjacent
Aug 1, 2018 · Penalty $2,500
Resolve - Class - 2
Sec. 3307.7.3 viewing panels. at time of inspection i observed severalapprox 4 viewing panels throughout the jobsite fence unconvered w/no plexi glass or equivalent non-frangible material,contrary to bldg code.
Jul 18, 2018
Resolve - Class - 2
Housekeeping-egress. at time of inspection of new bldg under construction i observed that the walkway along perimeter at exp#2(orchard st)was inadequate. construction material & debris consisting of water hoses
Apr 9, 2018 · Penalty $625
Resolve - Class - 2
Sec. 3303.4.4 housekeeping. at the time of inspection of new bldg under construction i observed multiple garbage bags along perimeter wall at exp#3 not placed in waste containers. combustable debris inside garb
Apr 9, 2018 · Penalty $625
Resolve - Class - 2
Bc3307.7/fence.at the time of inspection of new building under construction i observed that the jobsite fence was missing viewing panels at expo 1(delancey st)additional panels required along fence at exp 2(eve
Apr 9, 2018
Resolve - Class - 1
Sec: bc 3309.9. weatherproof integrity of adjoining bldg. note: @ time of insp of a 12 story bldg @ excavation phase. observed that there were no weatherproofing in place as require for adjacent property founda
Jan 18, 2018 · Penalty $1,600
Resolve - Class - 2
Bc3307.6.5.11:failure to notify dob for the complete removal of sidewalk shed.note:at time of inspection observed no sws in place,the sws in question was removed prior to notifying the dept the 2 business days
Aug 31, 2017 · Penalty $4,000
Resolve - Class - 2
@ time of insp (6:15am) the underside of the sidewalk shed has no working light. 3307.6.4.8.1 the underside of the shed shall be illuminated @ all times either by daylight or electric lights. rem: comply w/ cod
Mar 21, 2017 · Penalty $400
Resolve
Complaints
- Unsanitary condition
Mold
Oct 4, 2021 · Apt 2C
Close - Door/window
Window frame
Oct 4, 2021 · Apt 2C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 2018
- Floors
- 12
- Residential units
- 29
- Building area
- 29,437 ft²
- Lot area
- 2,437 ft²
- Zoning
- C6-2A
- Community board
- 103
- Council district
- 1
- Block / lot
- 410 / 34
- Assessed value
- $6,114,150
- Landmark / historic district
- No
HPD registration #144753, last renewed Jul 3, 2025.
Questions about 86 Delancey Street
Who owns 86 Delancey Street?
The owner of record in NYC Department of City Planning PLUTO data is Ordela LLC.
Does 86 Delancey Street have violations?
Yes. NYC HPD has recorded 12 housing violations at this property.
Is 86 Delancey Street rent stabilized?
NYC Department of Finance tax bills listed 9 rent-stabilized units here in 2024 (about 31% of its 29 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 86 Delancey Street built?
City records list 2018 as the year it was built.
How many apartments are in 86 Delancey Street?
It has 29 residential units and 31 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.