Latest housing violations
New HPD violations as inspectors record them. 11,335,542 match your filters. Learn what the classes mean.
- BHazardous800 East 160 Street · Bronx 10456 · Apt 3COpen — Violation open
Repair the broken or defective connection at drain pipe at wash basin in the bathroom located at apt 3c, 3rd story, 1st apartment from west at north
Inspected Oct 22, 2026
- BHazardous800 East 160 Street · Bronx 10456 · Apt 3COpen — Violation open
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 3c, 3rd story, 1st apartment from west at north
Inspected Oct 22, 2026
- BHazardous800 East 160 Street · Bronx 10456 · Apt 3COpen — Violation open
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 3c, 3rd story, 1st apartment from west at north
Inspected Oct 22, 2026
- CImmediately hazardous800 East 160 Street · Bronx 10456 · Apt 5BOpen — Violation open
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 5b, 5th story, 2nd apartment from west at north
Inspected Oct 22, 2026
- BHazardous800 East 160 Street · Bronx 10456 · Apt 5BOpen — Violation open
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 5b, 5th story, 2nd apartment from west at north
Inspected Oct 22, 2026
- BHazardous800 East 160 Street · Bronx 10456 · Apt 5BOpen — Violation open
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the bathroom located at apt 5b, 5th story, 2nd apartment from west at north
Inspected Oct 22, 2026
- BHazardous881 East 162 Street · Bronx 10459Open — Violation open
Properly repair or replace the broken or defective locking assembly at building entrance door
Inspected Oct 22, 2026
- CImmediately hazardous663 Dawson Street · Bronx 10455 · Apt 2Open — Violation open
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Inspected Oct 22, 2026
- BHazardous663 Dawson Street · Bronx 10455 · Apt 2Open — Violation open
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Inspected Oct 22, 2026
- CImmediately hazardous663 Dawson Street · Bronx 10455 · Apt 2Open — Violation open
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Inspected Oct 22, 2026
- BHazardous663 Dawson Street · Bronx 10455Open — Violation open
Remove all encumbrances consisting of house hold items at public hall, 2nd story
Inspected Oct 22, 2026
- BHazardous663 Dawson Street · Bronx 10455Open — Violation open
Remove all encumbrances consisting of house hold items at public hall, 1st story
Inspected Oct 22, 2026
- BHazardous663 Dawson Street · Bronx 10455Open — Violation open
Remove all encumbrances consisting of electrcal and gas powered scooters at lobby
Inspected Oct 22, 2026
- BHazardous663 Dawson Street · Bronx 10455Open — Violation open
Properly repair or replace the broken or defective upper sash glass window pane
Inspected Oct 22, 2026
- CImmediately hazardous663 Dawson Street · Bronx 10455Open — Violation open
Replace or repair the self-closing doors that is missing or defective latch
Inspected Oct 22, 2026
- CImmediately hazardous881 East 162 Street · Bronx 10459Open — Violation open
Replace or repair the self-closing doors that is missing or defective l;atch at building entrance door
Inspected Oct 22, 2026
- BHazardous920 Kelly Street · Bronx 10459 · Apt 3COpen — Violation open
Properly repair the source and abate the evidence of a water leak at ceiling and east wall in the 4th room from east located at apt 3c, 3rd story, 1st apartment from north at east
Inspected Oct 22, 2026
- BHazardous920 Kelly Street · Bronx 10459 · Apt 3COpen — Violation open
Properly repair the source and abate the evidence of a water leak at ceiling, west wall, and north wall in the bathroom located at apt 3c, 3rd story, 1st apartment from north at east
Inspected Oct 22, 2026
- BHazardous920 Kelly Street · Bronx 10459 · Apt 3COpen — Violation open
Properly repair the source and abate the evidence of a water leak at ceiling and west wall in the kitchen located at apt 3c, 3rd story, 1st apartment from north at east
Inspected Oct 22, 2026
- CImmediately hazardous1150 Intervale Avenue · Bronx 10459Open — Violation open
Provide ready access to buildings heating system at time of inspection adequate hot water and boiler system working at boiler room
Inspected Oct 22, 2026
- CImmediately hazardous1075 Longfellow Avenue · Bronx 10459Open — Violation open
Provide ready access to buildings heating system adequate hot water no access to boiler room at boiler room
Inspected Oct 22, 2026
- CImmediately hazardous1500 Grand Concourse · Bronx 10457 · Apt 55COpen — Violation open
Abate the infestation consisting of roaches in the entire apartment located at apt 55c, 5th story, 1st apartment from west at north , section ''c''
Inspected Oct 22, 2026
- BHazardous1500 Grand Concourse · Bronx 10457 · Apt 55COpen — Violation open
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 55c, 5th story, 1st apartment from west at north , section ''c''
Inspected Oct 22, 2026
- ANon-hazardous1511 Sheridan Avenue · Bronx 10457Open — Violation open
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Inspected Oct 22, 2026
- CImmediately hazardous106 Marcy Place · Bronx 10452 · Apt 3DOpen — Violation open
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). baseboard at south wall, 1st closet from west at north wall door frame, 1st door frame from south at west wall, 1st window frame from east at south wall in the 1st room from east located at apt 3d, 3rd story, 2nd apartment from east at south
Inspected Oct 22, 2026