5309 Arthur Kill Road
Staten Island, NY 10307BBL 5-07997-0058Map
Owner of record: Daragjati, Michael
5309 Arthur Kill Road is a walk-up apartment building built in 1915 in Staten Island, 10307. It has 4 residential units across 2.5 floors. The owner of record is Daragjati, Michael. HPD has recorded 42 housing violations here, most recently on February 23, 2015. 40 of the 42 most recent violations are still open.
- HPD violations
- 42
- DOB violations
- 2
- ECB violations
- 4
- HPD complaints
- 53
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 42
- CImmediately hazardous
Provide adequate supply of hot water for the fixtures ... in the entire apartment located at apt 2, 2nd story
Feb 23, 2015 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of cold water for the fixtures ... in the entire apartment located at apt 2, 2nd story
Feb 23, 2015 · Apt 2
Open — Nov sent out - CImmediately hazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet loose water tank in the bathroom located at apt 2, 2nd story
Feb 23, 2015 · Apt 2
Open — Nov sent out - CImmediately hazardous
Section 27-2028, 2032 admin.code: provide an adequate supply of heat from an approved central heating system or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt ph, 2nd story
Dec 16, 2014 · Apt PH
Closed — Violation dismissed - CImmediately hazardous
Section 27-2028, 2032 admin.code: provide an adequate supply of heat from an approved central heating system or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 2fl, 2nd story
Dec 1, 2014 · Apt 2FL
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling in the entire apartment located at apt 3, 1st story
Sep 4, 2012 · Apt 3
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 3, 1st story
Sep 4, 2012 · Apt 3
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 3, 1st story
Sep 4, 2012 · Apt 3
Open — Nov sent out - CImmediately hazardous
Replace with new the broken or defective glass window at north wall at basement
Aug 15, 2012
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the nuisance consisting of mold ... 3 square feet around bathtub in the bathroom located at apt 3, 1st story
Aug 15, 2012 · Apt 3
Open — Nov sent out
Show 32 more ↓
- BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 3, 1st story
Aug 15, 2012 · Apt 3
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling in the 1st room from east located at apt 3, 1st story
Aug 15, 2012 · Apt 3
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from east located at apt 3, 1st story
Aug 15, 2012 · Apt 3
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling in the 1st room from north located at apt 3, 1st story
Aug 15, 2012 · Apt 3
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from north located at apt 3, 1st story
Aug 15, 2012 · Apt 3
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the nuisance consisting of mold ... 1 square feet at west window sill in the 2nd room from north located at apt 3, 1st story
Aug 15, 2012 · Apt 3
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 2nd room from north located at apt 3, 1st story
Aug 15, 2012 · Apt 3
Open — Nov sent out - BHazardous
Properly repair the broken or defective south wall outlet in the 1st room from east located at apt side, 1st story
Jul 5, 2006 · Apt SIDE
Open — Nov sent out - ANon-hazardous
Refit entrance wood door in the 2nd room from east located at apt side, 1st story
Jul 5, 2006 · Apt SIDE
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the bathroom located at apt side, 1st story
Jul 5, 2006 · Apt SIDE
Open — Nov sent out - BHazardous
Properly repair the broken or defective electric outlets on east wall in the 3rd room from east located at apt side, 1st story
Jul 5, 2006 · Apt SIDE
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt side, 1st story
Jul 5, 2006 · Apt SIDE
Open — Nov sent out - BHazardous
Provide door bell in the entrance located at apt side, 1st story
Jul 5, 2006 · Apt SIDE
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the kitchen located at apt side, 1st story
Jul 5, 2006 · Apt SIDE
Open — Nov sent out - BHazardous
Properly repair the broken or defective south wall outlet in the kitchen located at apt side, 1st story
Jul 5, 2006 · Apt SIDE
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt side, 1st story
Jun 5, 2006 · Apt SIDE
Open — Nov sent out - BHazardous
Properly repair the broken or defective light on ceiling in the 1st room from east located at apt side, 1st story
Jun 5, 2006 · Apt SIDE
Open — Nov sent out - BHazardous
Abate the nuisance consisting of re grout bathtub in the bathroom located at apt side, 1st story
Jun 5, 2006 · Apt SIDE
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color south wall in the kitchen located at apt side, 1st story
Jun 5, 2006 · Apt SIDE
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the bathroom located at apt side, 1st story
Jun 5, 2006 · Apt SIDE
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the kitchen located at apt side, 1st story
Jun 5, 2006 · Apt SIDE
Open — Nov sent out - BHazardous
Properly repair the broken or defective outlet on south wall in the 3rd room from east located at apt side, 1st story
Jun 5, 2006 · Apt SIDE
Open — Nov sent out - BHazardous
Section 9, 56, 193, 300, 302 m.d. law- above frame building has been converted from a private dwelling to a multiple dwelling and is now occupied and maintained as such contrary to law.restore premises to lawful occupancy located at apt 1, 1st story, section ''front''
Apr 29, 2005 · Apt 1
Open — Nov sent out - BHazardous
Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible gas range at front apt located at apt 1, 1st story, section ''front''
Apr 29, 2005 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling hallway rear due to water damage located at apt 1fl, 1st story, apartment at south
Feb 16, 2005 · Apt 1FL
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department wall's and ceiling's in the entire apartment located at apt 1fl, 1st story, apartment at south
Feb 16, 2005 · Apt 1FL
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... ceiling in the bathroom located at apt 1fl, 1st story, apartment at south
Feb 16, 2005 · Apt 1FL
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1fl, 1st story
Nov 24, 2004 · Apt 1FL
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department wall's and ceiling's in the entire apartment located at apt 1fl, 1st story, apartment at south
Nov 8, 2004 · Apt 1FL
Open — Nov sent out - BHazardous
Properly repair the broken or defective east window 1 st room from front located at apt 1fl, 1st story, apartment at south
Nov 8, 2004 · Apt 1FL
Open — Not complied with - BHazardous
Properly repair the broken or defective north and south window's front room located at apt 1fl, 1st story, apartment at south
Nov 8, 2004 · Apt 1FL
Open — Not complied with - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Nov 8, 2004
Open — Nov sent out
DOB building violations · 2
- Construction other optional
Failure to maintain building due to car accident
Sep 28, 2012
Dob violation - active - Construction other optional
C-construction other optional
Aug 10, 2002
Dob violation - dismissed
ECB violations · 4
- Class - 2
Violations of parking regulations in a residential district: dead storage of commercial trucks "queen bean" coffee truck & cirica 1970's chevy comaro & various snow plows on west side at exposure #2 of private
Sep 6, 2013 · Penalty $4,000
Active - Class - 2
Violation of parking regulation in a residential district.noted:detached residence district r3a zone prohibit dead storage of motor vehicle.two commercial trucks w/o passing tag.inoperative condition & red colo
Sep 28, 2012 · Penalty $400
Resolve - Class - 1
Occupancy contrary to that allowed by the bldg dept record.noted:bldg dept records indicates one story structure n.b.#996/1922 listed as a store.presently use as 2-family dwelling in back portion 3 bedroom, one
Sep 28, 2012
Resolve - Non-hazardous
Occupancy contrary to that allowed by building dept records in that attic is being used as bedrooms.remedy:obtain approval and permit.
Mar 31, 1993
Resolve
Complaints
- General
Signage missing
Jul 25, 2018 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jul 25, 2018 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jul 25, 2018 · Apt BLDG
Close - Safety
Fire escape
Jul 25, 2018 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 19, 2015 · Apt 2
Close - Plumbing
Water supply
Feb 18, 2015 · Apt 2
Close - Heat/hot water
Apartment only
Dec 11, 2014 · Apt PH
Close - Heat/hot water
Apartment only
Nov 30, 2014 · Apt 2FL
Close - Heat/hot water
Apartment only
Nov 28, 2014 · Apt 2FL
Close - Heat/hot water
Entire building
Nov 27, 2014 · Apt 2FL
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Nov 23, 2014 · Apt 2NDFL
Close - Heat/hot water
Entire building
Nov 18, 2014 · Apt 2NDFL
Close - Nonconst
Vermin
Sep 2, 2012 · Apt 3
Close - Paint/plaster
Ceiling
Sep 2, 2012 · Apt 3
Close - Electric
Wiring
Aug 14, 2012 · Apt 3
Close - Plumbing
Sewer
Aug 14, 2012 · Apt 3
Close - Paint/plaster
Wall
Aug 14, 2012 · Apt 3
Close - Paint/plaster
Ceiling
Aug 14, 2012 · Apt 3
Close - Paint/plaster
Ceiling
Aug 14, 2012 · Apt 3
Close - Plumbing
Water-leaks
Aug 14, 2012 · Apt 3
Close - Paint/plaster
Ceiling
Aug 14, 2012 · Apt 3
Close - Plumbing
Water-leaks
Aug 14, 2012 · Apt 3
Close - Paint/plaster
Ceiling
Aug 14, 2012 · Apt 3
Close - General
Mold
Aug 14, 2012 · Apt 3
Close - Plumbing
Water-leaks
Aug 14, 2012 · Apt 3
Close - Electric
Lighting
Jun 24, 2006 · Apt SIDE
Close - Electric
Lighting
Jun 24, 2006 · Apt SIDE
Close - General
Windows
Jun 24, 2006 · Apt SIDE
Close - Electric
Wiring
Jun 24, 2006 · Apt SIDE
Close - Paint/plaster
Wall
Jun 24, 2006 · Apt SIDE
Close - Paint/plaster
Ceiling
Jun 24, 2006 · Apt SIDE
Close - General
Mold
Jun 24, 2006 · Apt SIDE
Close - Paint/plaster
Radiator
Jun 24, 2006 · Apt SIDE
Close - General
Doors
Jun 24, 2006 · Apt SIDE
Close - General
Floor
Jun 24, 2006 · Apt SIDE
Close - General
Mold
Jun 1, 2006 · Apt SIDE
Close - Paint/plaster
Ceiling
Jun 1, 2006 · Apt SIDE
Close - General
Windows
Jun 1, 2006 · Apt SIDE
Close - Paint/plaster
Ceiling
Jun 1, 2006 · Apt SIDE
Close - Nonconst
Vermin
Jun 1, 2006 · Apt SIDE
Close - Electric
Lighting
Apr 27, 2005 · Apt 1
Close - Nonconst
Vermin
Apr 18, 2005 · Apt 1
Close - Plumbing
Water-leaks
Jan 14, 2005 · Apt 1FL
Close - Electric
Wiring
Jan 11, 2005 · Apt 1FL
Close - Electric
Wiring
Nov 8, 2004 · Apt 1FL
Close - Plumbing
Basin/sink
Nov 6, 2004 · Apt 1FL
Close - General
Mold
Nov 6, 2004 · Apt 1FL
Close - General
Mold
Nov 6, 2004 · Apt 1FL
Close - Heating
Heat-plant
Nov 6, 2004 · Apt 1FL
Close - General
Windows
Nov 6, 2004 · Apt 1FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C3)
- Year built
- 1915
- Floors
- 2.5
- Residential units
- 4
- Building area
- 4,514 ft²
- Lot area
- 8,060 ft²
- Zoning
- R3A
- Community board
- 503
- Council district
- 51
- Block / lot
- 7997 / 58
- Assessed value
- $269,100
- Landmark / historic district
- No
Questions about 5309 Arthur Kill Road
Who owns 5309 Arthur Kill Road?
The owner of record in NYC Department of City Planning PLUTO data is Daragjati, Michael.
Does 5309 Arthur Kill Road have violations?
Yes. NYC HPD has recorded 42 housing violations at this property.
Is 5309 Arthur Kill Road rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 5309 Arthur Kill Road built?
City records list 1915 as the year it was built.
How many apartments are in 5309 Arthur Kill Road?
It has 4 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.