roofy

160 Connecticut Street

Staten Island, NY 10307BBL 5-07939-0052Map

Owner of record: Bogdan G Gierzynski

160 Connecticut Street is a two-family home built in 1982 in Staten Island, 10307. It has 2 residential units across 2 floors. The owner of record is Bogdan G Gierzynski. HPD has recorded 42 housing violations here, most recently on March 6, 2015. 38 of the 42 most recent violations are still open.

HPD violations
42
DOB violations
0
ECB violations
1
HPD complaints
55

What to know

Concern
3 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Mar 6, 2015

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 42

  • B

    Repair the broken or defective plastered surfaces and paint in uniform color walls in the 1st room from north at west located at apt pvt, 2nd story

    Mar 6, 2015 · Apt PVT

    Open — Nov sent out
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... ceiling 4 sq ft in the 1st room from north at west located at apt pvt, 2nd story

    Mar 6, 2015 · Apt PVT

    Open — Nov sent out
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... walls under stairs front room 20 sq ft located at apt pvt, 1st story

    Mar 6, 2015 · Apt PVT

    Open — Nov sent out
  • B

    Properly repair the broken or defective window frame upper and lower sashs in the 1st room from north at west located at apt pvt, 2nd story

    Mar 6, 2015 · Apt PVT

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color ceilings in the entire apartment located at apt pvt, 2nd story

    Mar 6, 2015 · Apt PVT

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from north at west located at apt pvt, 2nd story

    Mar 6, 2015 · Apt PVT

    Open — Nov sent out
  • C

    Repair the roof so that it will not leak entire apt in the entire apartment located at apt pvt, 2nd story

    Mar 6, 2015 · Apt PVT

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color ceilings in the entire apartment located at apt pvt, 2nd story

    Nov 18, 2014 · Apt PVT

    Open — Nov sent out
  • B

    Replace with new the broken or defective thermostat on wall in the entire apartment located at apt pvt, 2nd story

    Nov 18, 2014 · Apt PVT

    Open — Nov sent out
  • A

    Provide sufficient,proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material. at front areaway

    Nov 18, 2014

    Open — Nov sent out
Show 32 more ↓
  • B

    Properly repair with similar material the broken or defective warp wooden floor in the foyer located at apt pvt, 1st story

    Nov 18, 2014 · Apt PVT

    Open — Nov sent out
  • C

    Section 27-2028, 2032 admin.code: provide an adequate supply of heat from an approved central heating system or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt pvt, 1st story

    Nov 18, 2014 · Apt PVT

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak ceiling in the 2nd room from north at east located at apt pvt, 2nd story

    Nov 18, 2014 · Apt PVT

    Open — Nov sent out
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... closet north wall appx 2 sq ft in the 1st room from north at east located at apt pvt, 1st story

    Nov 18, 2014 · Apt PVT

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak ceiling in the 1st room from north at east located at apt pvt, 1st story

    Nov 18, 2014 · Apt PVT

    Open — Nov sent out
  • A

    Repair leaky water closet flush pipe connection west in the bathroom from north at west located at apt 2, 2nd story

    Aug 26, 2014 · Apt 2

    Open — Nov sent out
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl ;; in the bathroom from north at west located at apt 2, 2nd story

    Aug 26, 2014 · Apt 2

    Open — Nov sent out
  • B

    Replace with new the broken or defective rotten window frame in the 1st room from east at south located at apt 1, 1st story

    Aug 26, 2014 · Apt 1

    Open — Nov sent out
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... walls under stoop front bldg [ entrance to see mold in apt 1 appx 20 sq ft at stoop

    Aug 26, 2014

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color walls and ceilings in the entire apartment located at apt 1, 1st story

    Aug 26, 2014 · Apt 1

    Open — Nov sent out
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... east wall closet app 2 sq ft in the 1st room from east at south located at apt 1, 1st story

    Aug 26, 2014 · Apt 1

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in uniform color west wall in the kitchen located at apt 2, 2nd story

    Jun 5, 2014 · Apt 2

    Open — Nov sent out
  • A

    Replace with new the missing closet doors in the 3rd room from east located at apt 2, 2nd story

    Jun 5, 2014 · Apt 2

    Open — Nov sent out
  • B

    Replace with new the missing shower doors east in the bathroom located at apt 2, 2nd story

    Jun 5, 2014 · Apt 2

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the foyer located at apt 2, 2nd story

    Jun 5, 2014 · Apt 2

    Open — Nov sent out
  • C

    Repair the roof so that it will not leak ceiling in the foyer located at apt 2, 2nd story

    Jun 5, 2014 · Apt 2

    Closed — Violation closed
  • A

    Repair leaky water closet flush pipe connection west in the bathroom located at apt 2, 2nd story

    Jun 5, 2014 · Apt 2

    Open — Nov sent out
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl west in the bathroom located at apt 2, 2nd story

    Jun 5, 2014 · Apt 2

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story

    Jun 5, 2014 · Apt 1

    Closed — Violation closed
  • B

    Replace with new the missing metal railing at front areaway

    Jun 5, 2014

    Open — Nov sent out
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the debri at south yard

    Jun 5, 2014

    Open — Nov sent out
  • A

    Provide a gutter, properly connected to drainage system, for proper drainage west yard

    Jun 5, 2014

    Open — Nov sent out
  • A

    Replace with new the missing doors in the entire apartment located at apt 1, 1st story

    Jun 5, 2014 · Apt 1

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective wood floors in the entire apartment located at apt 1, 1st story

    Jun 5, 2014 · Apt 1

    Closed — Violation closed
  • C

    Abate the nuisance consisting of smelling odor in the entire apartment located at apt 1, 1st story

    Jun 5, 2014 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 3rd room from east located at apt 1, 1st story

    Jun 5, 2014 · Apt 1

    Open — Nov sent out
  • C

    Properly repair the source and abate the evidence of a water leak ceiling in the 3rd room from east located at apt 1, 1st story

    Jun 5, 2014 · Apt 1

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective rotted window frame in the 1st room from east located at apt 1, 1st story

    Jun 5, 2014 · Apt 1

    Open — Nov sent out
  • B

    Properly repair the broken or defective unopenable window in the 4th room from east located at apt 1, 1st story

    Jun 5, 2014 · Apt 1

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak bottom walls in the entire apartment located at apt 1, 1st story

    Jun 5, 2014 · Apt 1

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 4th room from east located at apt bldg, 2nd story

    Jun 5, 2014 · Apt BLDG

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak ceiling in the 4th room from east located at apt bldg, 2nd story

    Jun 5, 2014 · Apt BLDG

    Open — Nov sent out

DOB building violations · 0

No DOB violations on record

ECB violations · 1

  • Class - 3

    Work w.o permit. noted: curb cut has been enlarged to 24. approx 1300 sq ft of additional concrete has been installed @ rear side yard. owner has indicated location of existing flatwork. no approval or permit e

    Nov 28, 2008 · Penalty $200

    Active

Complaints

  • Paint/plaster

    Wall

    Feb 19, 2015 · Apt PVT

    Close
  • Outside building

    Roofing

    Feb 19, 2015 · Apt PVT

    Close
  • Paint/plaster

    Wall

    Feb 19, 2015 · Apt PVT

    Close
  • Water leak

    Heavy flow

    Feb 19, 2015 · Apt PVT

    Close
  • Unsanitary condition

    Mold

    Feb 19, 2015 · Apt PVT

    Close
  • Unsanitary condition

    Mold

    Feb 19, 2015 · Apt PVT

    Close
  • Paint/plaster

    Wall

    Feb 19, 2015 · Apt PVT

    Close
  • Door/window

    Window frame

    Feb 19, 2015 · Apt PVT

    Close
  • Paint/plaster

    Wall

    Feb 19, 2015 · Apt PVT

    Close
  • Heat/hot water

    Entire building

    Feb 19, 2015 · Apt 1

    Close
Show 40 more ↓
  • Door/window

    Window frame

    Feb 19, 2015 · Apt PVT

    Close
  • Heat/hot water

    Apartment only

    Nov 16, 2014 · Apt 12

    Close
  • Heat/hot water

    Apartment only

    Nov 3, 2014 · Apt 1STFL

    Close
  • Water leak

    Heavy flow

    Nov 3, 2014 · Apt PVT

    Close
  • Water leak

    Slow leak

    Nov 3, 2014 · Apt PVT

    Close
  • Unsanitary condition

    Mold

    Nov 3, 2014 · Apt PVT

    Close
  • Unsanitary condition

    Mold

    Oct 28, 2014 · Apt 1FL

    Close
  • Water leak

    Slow leak

    Oct 28, 2014 · Apt 1FL

    Close
  • Water leak

    Slow leak

    Oct 28, 2014 · Apt 1FL

    Close
  • Heat/hot water

    Apartment only

    Oct 28, 2014 · Apt 1FL

    Close
  • Flooring/stairs

    Stairs

    Sep 19, 2014 · Apt 1FL

    Close
  • Outside building

    Roofing

    Sep 19, 2014 · Apt 1FL

    Close
  • Paint/plaster

    Wall

    Sep 19, 2014 · Apt 1FL

    Close
  • Water leak

    Heavy flow

    Sep 19, 2014 · Apt 1FL

    Close
  • Unsanitary condition

    Mold

    Sep 19, 2014 · Apt 1FL

    Close
  • Heat/hot water

    Entire building

    Sep 19, 2014 · Apt BLDG

    Close
  • Paint/plaster

    Wall

    Aug 19, 2014 · Apt 1

    Close
  • Unsanitary condition

    Mold

    Aug 19, 2014 · Apt 1

    Close
  • Water leak

    Heavy flow

    Aug 19, 2014 · Apt 1

    Close
  • Door/window

    Window frame

    Aug 19, 2014 · Apt 1

    Close
  • Unsanitary condition

    Mold

    Aug 19, 2014 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Jun 4, 2014 · Apt BLDG

    Close
  • Plumbing

    Toilet

    Jun 4, 2014 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    Jun 4, 2014 · Apt BLDG

    Close
  • Paint/plaster

    Ceiling

    Jun 4, 2014 · Apt BLDG

    Close
  • Water leak

    Slow leak

    Jun 4, 2014 · Apt BLDG

    Close
  • Water leak

    Damp spot

    Jun 4, 2014 · Apt 1

    Close
  • Water leak

    Damp spot

    Jun 4, 2014 · Apt BLDG

    Close
  • Flooring/stairs

    Floor

    Jun 4, 2014 · Apt BLDG

    Close
  • Flooring/stairs

    Floor

    Jun 4, 2014 · Apt BLDG

    Close
  • Flooring/stairs

    Floor

    Jun 4, 2014 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jun 4, 2014 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Jun 4, 2014 · Apt BLDG

    Close
  • Outside building

    Gutter/leader

    Jun 4, 2014 · Apt 1

    Close
  • Appliance

    Refrigerator

    Jun 4, 2014 · Apt 1

    Close
  • Appliance

    Electric/gas range

    Jun 4, 2014 · Apt 1

    Close
  • Door/window

    Window frame

    Jun 4, 2014 · Apt 1

    Close
  • Door/window

    Window frame

    Jun 4, 2014 · Apt 1

    Close
  • Flooring/stairs

    Stairs

    Jun 4, 2014 · Apt 1

    Close
  • Electric

    Outlet/switch

    Jun 4, 2014 · Apt 1

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Two-family home (B2)
Year built
1982
Floors
2
Residential units
2
Building area
4,247 ft²
Lot area
6,000 ft²
Zoning
R3X
Community board
503
Council district
51
Block / lot
7939 / 52
Assessed value
$79,740
Landmark / historic district
No

Questions about 160 Connecticut Street

Who owns 160 Connecticut Street?

The owner of record in NYC Department of City Planning PLUTO data is Bogdan G Gierzynski.

Does 160 Connecticut Street have violations?

Yes. NYC HPD has recorded 42 housing violations at this property.

Is 160 Connecticut Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 160 Connecticut Street built?

City records list 1982 as the year it was built.

How many apartments are in 160 Connecticut Street?

It has 2 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.