Violations at Cypress Loop
Staten Island, NY 10309 · BBL 5-07055-7501 · Back to the property
HPD housing violations
12 HPD violations, newest first.
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 10, 2025
Open — Info nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10sq ft at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from north at east original violation 17679283 issued 07-feb-25 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Feb 7, 2025 · Apt 1
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective wood frame around door in the entrance located at apt 1, 1st story, 1st apartment from north at east
Feb 7, 2025 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at west wall in the foyer located at apt 1, 1st story, 1st apartment from north at east
Feb 7, 2025 · Apt 1
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Feb 7, 2025 · Apt 1
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sq ft at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Feb 7, 2025 · Apt 1
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective lock on sliding door leading to east yard in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Feb 7, 2025 · Apt 1
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at north wall( upper level) in the bathroom located at apt 1, 1st story, 1st apartment from north at east
Feb 7, 2025 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood door in the entrance ( upper level) in the 1st room from east at south located at apt 1, 1st story, 1st apartment from north at east
Feb 7, 2025 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood door at south wall( upper level) in the bathroom located at apt 1, 1st story, 1st apartment from north at east
Feb 7, 2025 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Feb 7, 2025 · Apt 1
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective lock and assembly at door at east in the kitchen located at apt 101, 1st story, 1st apartment from north at east
Dec 31, 2024 · Apt 101
Open — Nov sent out
DOB building violations
3 DOB violations, newest first.
- Construction other optional
Unlawfully continued work while on notice of a stop work order noted: partial swo has issued on 02-27-2018 for plumbing work and electrical work. at time of inspection, all electrical work and plubing work have been completed at cellar, 1st/2nd floor remedy:comply w/stop work order
Feb 15, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - dismissed
ECB violations
1 ECB violations, newest first.
- Class - 2
Work without permit. work noted at all level, installed ew electrical wiring, outlets, switches and lights at all levels. installed new "db" distribution box with electrical wiring at cellar. installed water an
Feb 27, 2018 · Penalty $400
Resolve