roofy

Violations at 200 Adelaide Avenue

Staten Island, NY 10306 · BBL 5-04716-0060 · Back to the property

HPD housing violations

No HPD violations on record

DOB building violations

18 DOB violations, newest first.

  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed

ECB violations

The newest 50 of 69 ECB violations. The city keeps the complete history.

  • Class - 2

    Failure to maintain building in code compliant manner.noted:at severalclassrooms and other areas,there is combustible materials hanging fromthe ceiling and the light fixtures.this fire hazard must be removed.re

    Mar 25, 2026 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner.illumination forexits,exit discharges and public corridors per bc 1006.1;27-381.noted:there were several emergency lights that were not operational when tes

    Mar 25, 2026 · Penalty $1,250

    Active
  • Class - 2

    28-301.1 unlawful display of artwork in corridors greater than 20 % per fdny 2008 code; fc803.3.2 observed at pre k hallway there is combustible materials on walls & projective to hall visual obstruction & fire

    Jan 17, 2023 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner illumintaion for exits exit discharges & public corridor per bc 1006.1;27-381 at time of inspection several emergency lights not operational when tested inc

    Jan 17, 2023 · Penalty $625

    Resolve
  • Class - 2

    Reissue35498295p failure to maintain bldg in codecompliant manner:illumination for exits,exit discharges&public corridors per bc1006.1;27-381 note@1fl gym emergency lights not working 5lights out other lights f

    Apr 15, 2021 · Penalty $1,562

    Resolve
  • Class - 2

    Reissue35094339r failure to maintain bldg walls or apurtenances note@2fl facade water penetrating into rm239.maintain bldg exterior walls.

    Apr 15, 2021 · Penalty $3,125

    Resolve
  • Class - 2

    Reissue35498291h failure to maintain bldg in codecompliant manner note@2fl rms239&240 damage to columns in both rms due to water penetrationor steam [email protected] &/or replace.

    Apr 15, 2021 · Penalty $1,562

    Resolve
  • Class - 2

    Reissue35498292j failure to maintain bldg in codecompliant manner note@roof level roof leaks in various areas causing damage to ceiling below near rm239&240 hallway.repair &/or replace.

    Apr 15, 2021 · Penalty $1,562

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner illumination for exits, exit discharges & public corridors per be 1006.1:27-381 note in gym emergency lights not working properly some light flicker & some

    Jul 14, 2020 · Penalty $625

    Resolve
  • Class - 2

    Exit door not self closing note @1st floor auditorium middle set of door right door does not close rem: repair and or replace door

    Jul 14, 2020 · Penalty $625

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner note in sprinkler central room water valve leaks with water puddleing on floor causing a slipping hazard.rem: repair and or replace

    Jul 14, 2020 · Penalty $625

    Resolve
  • Class - 2

    Failure to maintain bldg ini code complaint manner note @roof lvl leaks in various areas casusing damage to ceilings below.rem: repair and or replace.

    Jul 14, 2020 · Penalty $625

    Resolve
  • Class - 2

    Reissue 35452234h failure to maintain bldg in code complaint manner note @2nd floor rooms 239+240 & corrider water damage to columns in bothroom & + ceiling in corridor due to water penetration from roof leak

    Jul 14, 2020 · Penalty $1,562

    Resolve
  • Class - 2

    Reissued #35335556h failure to maintain building in code compliant manner note at 2nd floor room 239 plaster column between windows in disrepair due to water penetration os steam leak.repair or replace

    Aug 30, 2019

    Resolve
  • Class - 2

    Re-issue #35271419l.failure to maintain building in code compliant manner.noted:at 2nd floor room #239 spalling plaster on columns between windows due to water penetration through facade.rem:comply with code/re

    Jun 21, 2018

    Resolve
  • Class - 2

    Reissue#35217089k failure to maintain bldg in code compliant manner. noted: spalling plaster on wall on column between windows in classroom 239 due to water penetration from facade need water proofing.

    Jul 5, 2017

    Resolve
  • Class - 2

    Reissue #35094338p failure to maintain building in code compliant manner. noted: spalling plaster on wall on column between windows in classroom 239 due to water penetration from facade. rmdy: comply with code

    Oct 25, 2016

    Resolve
  • Class - 2

    Reissue #35094339r failure to maintain building in code-compliant manner.noted: at 2nd floor, room 239, water penetration into room. rmdy: comply with code.

    Oct 25, 2016

    Resolve
  • Class - 2

    Play ground. at rear play ground of bldg, asphalt dislodged from where there used to be a tree & now causing a trip hazard rendering that play ground useless. remedy: repair play ground.

    Apr 25, 2014

    Resolve
  • Class - 2

    Broken window glass. at 1st floor gym, there are 7 broken panes of glass on windows. remedy: replace broken panes of glass.

    Apr 25, 2014

    Resolve
  • Class - 2

    Racked door. at 2nd floor hallway, cross corridor door next to room 207, racked & splitting preventing door from self closing. at 1st floor auditorium, 2 entrance doors from main lobby (1 door on far left & 1

    Apr 25, 2014

    Resolve
  • Class - 2

    Water penetration. at 2nd floor facade, water penetrating into room # 239. remedy: waterproof section of facade.

    Apr 25, 2014

    Resolve
  • Class - 2

    Water penetration. spalling plaster on wall on column between windows in classroom # 239 due to water penetration from facade. remedy: repair wall.

    Apr 25, 2014

    Resolve
  • Class - 2

    B254,36. found laars boiler l0625hn04,625,btu's not registered.

    Dec 7, 2012

    Resolve
  • Class - 2

    254,36,50, 50-remove draft inducer

    Aug 22, 2012

    Resolve
  • Class - 2

    Exit lighting net working at cafeteria main lobby & stair b. rem:repair or replace exit lighting.

    Jun 19, 2012

    Resolve
  • Class - 2

    Reissue 34927769y at stair d 1st flr door racked also door in corridornear rooms 140 & 202 drag on flr. rem:repair or replaced doors.

    Jun 19, 2012

    Resolve
  • Class - 2

    Near room 140 smoke doors do not function doors are sticking on floor & have very weak closing mechanisms rem: insp all smoke doors for proper fucntion repair replace smoke doors as required

    Sep 29, 2011

    Resolve
  • Class - 2

    @ room 204 vision panel mullion missing leaving edges of glass exposed rem: repair replace missing mullion

    Sep 29, 2011

    Resolve
  • Class - 2

    Flame spread rating of classroom door 45m has been eliminated by the installation of plexiglass in the vision panels located 222 211 202 102107 118 111 120 rem: replace plexi restore the required 3/4 hour ratin

    Sep 29, 2011

    Resolve
  • Class - 2

    Plexiglass installed in classroom vision 1 panels eliminating fire rating. locations: 222, 202 (missing), 102,107,118,111. no moulding or mullion: 209,211. remedy: plexi w/suitable material. secure glass where

    Aug 4, 2010

    Resolve
  • Class - 3

    Wall damaged by roof leak (near ceiling). location: left side of auditorium. (damaged @ 22' height). remedy: repair/replace damaged wall section.

    Jul 14, 2009

    Resolve
  • Class - 2

    Acoustic ceiling tiles damaged by roof leak. location: left side of auditorium (22' ceiling). remedy: remove & replace damaged acoustic ceiling tile.

    Jul 14, 2009

    Resolve
  • Class - 2

    Roof leak @ left side - auditorium - remedy: eliminate any penetrationof storm water.

    Jul 14, 2009

    Resolve
  • Class - 2

    @ boiler room no dedicated fresh air intake. remedy: provide working dedicated fresh air intake louvres as required for each boiler.

    Jul 14, 2009

    Resolve
  • Hazardous

    Scaffold does not meet building code standards. supported scaffold that has been erected along adelaide ave., leeds st, and rear of buildinghave several sections of toe boards missing remedy: conform to buildi

    Mar 5, 2008 · Penalty $800

    Resolve
  • Hazardous

    Failure to provide adequate protection for sidewalk during construction operatios. sidewalk shed erected above main entrance way into schoolis not properly sealed. there ia an approx. 2'x4' section of plywood

    Mar 5, 2008 · Penalty $2,000

    Resolve
  • Hazardous

    Scaffold does not meet building code standards. supported scaffold that has been erected on exposures 1.3.4 have not been properly joined together, there are no locking pins being used, and several sections hav

    Mar 5, 2008 · Penalty $800

    Resolve
  • Non-hazardous

    Failure to maintain (interior) note: classroom #240 has cracked/loose plaster in ceiling. (due to leak above). remedy: repair defect.

    Jan 4, 2005

    Resolve
  • Non-hazardous

    Failure to maintain: roof leaking (above) into class room #240. remedyrepair roof.

    Jan 4, 2005

    Resolve
  • Non-hazardous

    Reissue vio# 34421592j fail to maintain approx. 1/4"x 11 foot cracks (vertical) in concrete block column at stage (left) in auditorium. remedy: repair defect.

    Jan 4, 2005

    Resolve
  • Non-hazardous

    Reissue vio#34276382n failure to provide panic hardware in p.a. at 1) multipurpose room doors over 75 occupancy 2) gymnasium doors. over 300occupancy. remedy: provide panic hardware.

    Jan 4, 2005

    Resolve
  • Hazardous

    6b,50. 6b-hazardous rear safety valve discharges at 18 psi not 15 psi as required. 50-needs discharge pipes from safety valves to a safe location.

    May 5, 2004

    Resolve
  • Non-hazardous

    50a,50.50-left side rear of boiler shell is leaking badly-must repair immediately.50a-missing discharge pipes to a safe location from safety values.

    Apr 7, 2004

    Resolve
  • Non-hazardous

    19b,36.19b-manual reset-aquastat is missing.36-teledyne laars hot water boiler model #l0625 is not registered.

    Apr 7, 2004

    Resolve
  • Non-hazardous

    Failure to use panic hardware where required by law.at lunch room.with occupancy for 400 no panic hardware at south,north and west double doors.remedy:provide panic hardware,provide legal hardware

    Jan 23, 2004

    Resolve
  • Non-hazardous

    Exterior stairs must comply with all requirements of 27-375f for interior stairs at north service stair to kitchen no handrail present.remedy:provide handrail

    Jan 23, 2004

    Resolve
  • Non-hazardous

    Failure to maintain bldg location at auditorium.stage concrete block wall.column at l/s at 11 ft to 20 a 1/4 crack in concrete block vertical,structural stability in question.remedy:repair concrete block defect

    Jan 23, 2004

    Resolve
  • Non-hazardous

    Use of illegal hardware,locations noted:have self contained hasp and padlock,all locked in open position (1)exit #5 2 doors.remedy:remove illegal hardware

    Jan 23, 2004

    Resolve
  • Non-hazardous

    Failrue to maintain bldg.noted:water damaged and leaking ceilings in auditorium,classrooms 245 and 246-with part of auditorium closed off dur to water spilling onto floor from ceiling damaged by incomplete and

    Sep 23, 2003

    Resolve