roofy

Violations at 50 Timber Ridge Drive

Staten Island, NY 10306 · BBL 5-04645-7501 · Back to the property

HPD housing violations

13 HPD violations, newest first.

  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Jul 8, 2025

    Open — Info nov sent out
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt ph, 1st story, 1st apartment from east at south

    Jul 7, 2025 · Apt PH

    Open — Nov sent out
  • CImmediately hazardous

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the bathroom located at apt ph, 1st story, 1st apartment from east at south

    Jul 7, 2025 · Apt PH

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective glass pane on 2nd sliding window from south at west wall in the 3rd room from east at north located at apt ph, 1st story, 1st apartment from east at south

    Jul 7, 2025 · Apt PH

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective vinyl tile at floor in the 1st room from east at south located at apt ph, 1st story, 1st apartment from east at south

    Jul 7, 2025 · Apt PH

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and east wall in the 1st room from east at south located at apt ph, 1st story, 1st apartment from east at south

    Jul 7, 2025 · Apt PH

    Open — Nov sent out
  • BHazardous

    Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt ph, 1st story, 1st apartment from east at south

    Jul 7, 2025 · Apt PH

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective wood frame at the door in the entrance located at apt ph, 1st story, 1st apartment from east at south

    Jul 7, 2025 · Apt PH

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective vinyl soffit under terrace

    Mar 4, 2022

    Open — Nov sent out
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in uniform color ceilingceiling and south wall in the 4th room from north located at apt 1, 1st story, 1st apartment from north at east

    Mar 4, 2022 · Apt 1

    Open — Nov sent out
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling and walls in the bathroom located at apt 1, 1st story, 1st apartment from north at east

    Mar 4, 2022 · Apt 1

    Open — Nov sent out
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from north located at apt 1, 1st story, 1st apartment from north at east

    Mar 4, 2022 · Apt 1

    Open — Nov sent out
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the kitchen located at apt 1, 1st story, 1st apartment from north at east

    Mar 4, 2022 · Apt 1

    Open — Nov sent out

DOB building violations

15 DOB violations, newest first.

  • Construction other optional

    Structure rendered non compliant due to garage floor being undermined. at rear of building (carport) there is a hole approx 3'w x 3'l x 20"d that was dug out exposing building components for gas lines exposed.

    Aug 19, 2026

    Dob violation - dismissed
  • Construction other optional

    Structure rendered non compliant due to garage floor being undermined. at rear of building (carport) there is a hole approx 3'w x 3'l x 20"d that was dug out exposing building components for gas lines exposed.

    Aug 19, 2026

    Dob violation - dismissed
  • Construction other optional

    Structure rendered non-compliant. at time of inspection observed severe sagging on 2nd floor wood balcony along with a section of handrail has partially detached. structural stability potentially compromised.

    Apr 10, 2026

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)

    Jun 19, 2023

    Dob violation - active
  • Construction other optional

    Damaged observed to the vinyl siding on the exterior of the adjacent property due to fire at 296 timber irdge drive

    Apr 14, 2020

    Dob violation - active
  • Construction other optional

    Due to fire at 296 timber ridge drive

    Apr 14, 2020

    Dob violation - dismissed
  • Construction other optional

    Structure remndered non compliant: at time of inspoction damage observ ed throughout the premises due to fire

    Apr 14, 2020

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2017)

    Mar 27, 2018

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2016)

    Feb 16, 2017

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2015

    Mar 14, 2016

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2015

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2012

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jan 1, 2012

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Feb 8, 2010

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Feb 8, 2010

    Dob violation - dismissed

ECB violations

6 ECB violations, newest first.

  • Class - 2

    Observed small area of undermining voids were observed under the garage concrete slab. at exposure#3, repair and/or replace

    Aug 26, 2026 · Penalty $1,250

    Active
  • Class - 1

    Unlawful acts. failure to comply with commissioner's order. for failure to obtain a engineers report for complaint#5195834 issued on 4/10/26, comply with commissioner's order

    Jul 15, 2026 · Penalty $2,530

    Active
  • Class - 2

    Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. no certificate of correction on file for vio#39184097h as of 7/15/2026., file a certificate

    Jul 15, 2026 · Penalty $1,280

    Active
  • Class - 1

    Failure to maintain building in code compliant manner. at time of inspection observed 2nd floor balcony with severe sagging at one end along with a section of handrail has partially detached from structure. con

    Apr 10, 2026 · Penalty $12,500

    Active
  • Class - 1

    Failure to obey a vacate order from the commissioner per 28-207.4. reference to dob records, property has full vacate order #22/20 has issued on 04/14/2020 however at time of inspection for lifting the vacate i

    Jun 22, 2021

    Resolve
  • Non-hazardous

    Work done without a permit.noted:the 2fl wood balcony's length was extended approx.one ft and a double 2'x10'wood girder was installed supported by two 4'x4'posts-one ateach end of width of balcony.rem:obtain

    Aug 1, 2000

    Resolve