15 Fairfield Street
Staten Island, NY 10308BBL 5-04586-0001Map
Owner of record: NYC Department Of Education
15 Fairfield Street is a school building built in 1975 in Staten Island, 10308. The owner of record is NYC Department Of Education. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 14
- ECB violations
- 47
- HPD complaints
- 1
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 14
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed
Show 4 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Public assembly none
Pa-public assembly none
Feb 27, 1989
Dob violation - dismissed
ECB violations · 47
- Class - 2
Failure to maintain building in code-compliant manner. illumination for exits, exit discharges and public corridors as per bc 1006.1; 27-381. noted: there were several emergency exit lights that were not operat
Mar 24, 2026 · Penalty $1,250
Active - Class - 1
Failure to maintain building in code-compliant manner. noted: there were several classrooms, corridors and entry with excessive amounts of combustible materials hanging from ceilings and lights. also electrical
Mar 24, 2026 · Penalty $2,500
Resolve - Class - 2
Failure to maintain bldg in code compliant manner note @roof lvl water penetration @roof where new bldg & old roof meet causing damage to ceiling below.rem: repair & replace.
Jul 13, 2020 · Penalty $625
Resolve - Class - 2
Reissue 35447823j failure to maintain bldg in code compliant manner note water damage to ceilng in rooms 166, 168 (boiler room) & corridor due to roof leak,rem: repair and replace.
Jul 13, 2020 · Penalty $625
Resolve - Class - 2
Failure to maintain building in code compliant manner use of prohibited foor and or hardware per bc 1008.1;27-371(j) note kick stops installed on varioud doors throughout entire 1st floor provide legal hardware
Aug 29, 2019
Resolve - Class - 2
Reissued #35342081z failure to maintain building in code compliant manner note water damage to ceiling in room 166.168 (boiler room) and corrdiro adjacent to room 157 due to leak on roof near parapet to adjacen
Aug 29, 2019
Resolve - Class - 2
Faillure to maintain building in code compliant manner note at exit #4 exit doors in disrepair with door jams rotten and rusted thru with water penetrating thru floor repair and or replace
Aug 29, 2019
Resolve - Class - 1
Construction superintendent daily log book. at the time of inspection the registered construction superintendent "frank orlando" was onsite of a 3 story new building .however his logbook was not up to date or
Jul 18, 2019 · Penalty $1,250
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction.(no rebar caps)at time of inspection i observed proposed 3sty bldg currently at the roof level w/ongoing work activity present.
Apr 10, 2019 · Penalty $625
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction(no handrails). at time of inspection i observed proposed 3sty bldg w/on going work present. i also observed no guardrail system
Apr 10, 2019
Resolve
Show 37 more ↓
- Class - 1
Sec. 3301.6 design drawings. at time of inspection i observed proposed3 sty bldg currently at roof level w/ongoing work activity present. however i observed contractor failed to provide design drawing for cable
Apr 10, 2019 · Penalty $625
Resolve - Class - 2
Failure to maintain building in code-compliant manner.noted:illegal storage of materials such as pins,wash,sink,sheetrock and chairs at electrical room.rem:comply with code/keep the room clean
Jun 21, 2018
Resolve - Class - 2
Failure to maintain building in code-compliant manner.noted:water damaged to ceiling due to water penetration through roof at supply room and corridor adjacent to rm #157 & 166 and front desk.rem:repair or repl
Jun 21, 2018
Resolve - Class - 2
Failure to maintain bldg n code compliant manner.noted:at 1st flr,corridor close to rm#165 & 126 and inside boiler room & switch room,water damage to ceiling or walls due to water penetration through roof or wa
Oct 24, 2016
Resolve - Class - 2
Reissue nov#35085738j failure to maintian bldg in code compliant manner:use of prohibited door and/or hardware per bc1008.1-8;27-371(j)notedat 1st flr,exit door #4 and boiler room exit door,slide bolts used to
Oct 24, 2016
Resolve - Class - 2
Failure to maintain bldg in code compliant manner.noted:at 1st flr,at corridor close to rm#162 &131,vertical steps crackes masonry in the wall.rem:comply with code/repair the crack.
Oct 24, 2016
Resolve - Class - 2
Reissue nov#35085736x wrk w/out a permit.noted:full height partitions installed in rooms#100,115a,115b,116,117b,118,133,136,137,157a,b;to create classrooms and offices.rem:comply with code.
Oct 24, 2016
Resolve - Class - 2
Failure to maintain bldg in code compliant manner:lack of emergency lighting for exits,exit discharges and public corridors per bc1006.1;27-542.noted:at 1st flr,at cafe and gym area,inoperative emergency lights
Oct 24, 2016
Resolve - Class - 2
Failure to maintain bldg in code-compliant manner. use of prohibited doors &/or hardware per bc 1008.1.8; 27-371(j). -handicap exit #4 -slide bolts used to lock doors. -boiler room exit doors have slide bolts o
Feb 26, 2014
Resolve - Class - 2
Failure to maintain building in code-compliant manner. interior. approx 7 emergency lighting defective and not working. 3 are located in cafeteria. remedy: repair and/or replace emergency lights.
Feb 26, 2014
Resolve - Class - 2
Failure to maintain building in code-complaint manner. interior. in tcv #1 -floor tiles are loose & dislodged. remedy: repair and/or replace floor tiles.
Feb 26, 2014
Resolve - Class - 2
Work without permit. full height partitions installed in rooms 100,115a,115b,116,117b,118,133,136,137,157a,157b to create classrooms and/or offices. remedy: obtain permit.
Feb 26, 2014
Resolve - Class - 2
Door to t3 is racked preventing it from fully closing rem; repair or replace door
Jun 5, 2012
Resolve - Class - 2
(r-840) plexiglass installed, eliminating the fire rating @ corridor doors. locations 116, 117, 114, 135, 148, opposite 130(2), opposite 138 (2). remedy: provide required wire glass in corridor door lites
Jul 29, 2010
Resolve - Class - 3
(r-840) reissued from 34639389x & 34793219z, 7.14.09. at kitchen belowpet washing sink, concreted block, chase wall has 1/2" x 4' crack & approx 30 sq in of block missing. remedy: repair masonry.
Jul 29, 2010
Resolve - Class - 2
(r-840) no firestopping provided @ numerous pipe penetrations @ gas meter room. re-issued from 34793220x, 7.14.09. remedy: provide required firestopping @ gas meter room.
Jul 29, 2010
Resolve - Class - 2
Sec. 28-301.1. (r840) reissued from 34639390n 3.20.08, 34793220x 7.14.09. (ppm-1/1994) (p-115.4, - p-115.6) no fresh air vent @ gas meter room. remedy: provide f/a vent @ gas meter room.
Jul 29, 2010
Resolve - Class - 2
Reissue from 34639390n. (ppn-1/1994) (p-115.4 p115.6) no fresh air vent @ gas meter room. sec. code for various size requirements. no firestopping @ pipe penetrations. remedy: provide f/a vent & firestopping
Jul 14, 2009
Resolve - Class - 3
Reissue from 34639389x. concrete block (chase) wall has 1/2" horizontal crack & 30 sq ft of block missing. location: at kitchen, below pot washing sink. remedy: patch as necessary.
Jul 14, 2009
Resolve - Class - 2
Exit from 149 ( gym - pa- space ) partially obstructed by snapple machine & storage locker. remedy: remove obstructions. maintain fullwidth along egress path
Jul 14, 2009
Resolve - Class - 2
Exit doors defective. location / description. near rm 125 / centre mullion loose @ base. near rm 147 / door not working ( replace oanic hdwr.) (remove barrel bolt) remedy: make all necessary repairs to provide
Jul 14, 2009
Resolve - Class - 3
Hose bib required for children's "aqua programme". existing bib not working & in poor location. noted : to provide water, hose, must be run from the garden equiptment storage room. the doors must be kept open f
Jul 14, 2009
Resolve - Class - 2
Roof leak. location / gymnasium. remedy : repair roof
Jul 14, 2009
Resolve - Hazardous
Failure to maintain - interior - hazardous 1st flr - cafeteria kitchenexterior wall by elhhart st - under wash sink block wall shifted causing a large horizontal crack approx. 1/2" wide and block has shifted of
Mar 20, 2008
Resolve - Hazardous
Failure to maintain interior gas meter room - no fresh air vent. remedy: install ride provide fresh air vent.
Mar 20, 2008
Resolve - Non-hazardous
Failure to provide emergency power to exit / directional signs on the 1st floor remedy : - provide emergency power to exit / drtl sign as per ll - 15/84 and b.e.c. standards
Mar 11, 2002
Resolve - Non-hazardous
*reissue* failure to maintain. noted: door jams and center posts rusted-out at bottom at exit 5, exit 7 and store room doors. remedy: repair/replace door jams.
Jan 9, 2002
Resolve - Non-hazardous
Failure to maintain. noted: slab floor at corner of room 127 has "sunk" (approx 2 inches or more) and pulled away from exterior walls. remedy: repair slab at corner of rm 127.
Jan 9, 2002
Resolve - Non-hazardous
*reissue* failure to maintain. noted: large cracks in concrete of entry ramp at north side of building. remedy: repair concrete.
Jan 9, 2002
Resolve - Non-hazardous
Failure to maintain. noted: 3 foot wide hole in chain link fence at north side by basketball courts. remedy: repair fence.
Jan 9, 2002
Resolve - Non-hazardous
Failure to maintain:defect is:exit doors #5 and 7 and the storeroom doors adjacent to the playground are rotted and corroded.remedy:maintain bldg.make all necessary repairs forthwith
Apr 4, 2001
Resolve - Non-hazardous
Failure to maintain.defect is:the interior block walls are cracked in the following locations:the south wall of the gymnasium, the north hallway outside the gymnasium, the hallway opposite room #154.remedy:main
Apr 4, 2001
Resolve - Non-hazardous
Failure to maintain.defect is:the brick a.c. roof enclosure has cracked brick and motor joints at the north east and south east corners.remedy:maitnain bldg,make all necessary repairs forthwith.
Apr 4, 2001
Resolve - Non-hazardous
Failure to maintain.defect is:there is cracked and missing brick,on the left side facade of the maint entry.remedy:maintain bldg.make all necessary repairs forthwith.
Apr 4, 2001
Resolve - Non-hazardous
Failure to maintain.defect is:the perimeter fence is missing section on the north side the east side and the south side by the gate.remedy:maintain perimeter fence make all necessary repairs forthwith
Apr 4, 2001
Resolve - Non-hazardous
Failure to maintain.defect is:the concrete entry ramp,on the north side of school is cracked and spalling.remedy:maintain bldg,make all necessary repairs forthwith
Apr 4, 2001
Resolve - Non-hazardous
Failure to maintain work noted: holes on first floor ceilings tiles blown away by heat returns room 160 & 162. remedy:repair and replace ceilings tiles. forthwoth.
Feb 17, 1993 · Penalty $1,000
Resolve
Complaints
- Unsanitary condition
Pests
Apr 6, 2021 · Apt 15A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- School building (W1)
- Year built
- 1975
- Floors
- 3
- Residential units
- —
- Building area
- 85,507 ft²
- Lot area
- 93,800 ft²
- Zoning
- R3-1
- Community board
- 503
- Council district
- 51
- Block / lot
- 4586 / 1
- Assessed value
- $9,755,100
- Landmark / historic district
- No
Questions about 15 Fairfield Street
Who owns 15 Fairfield Street?
The owner of record in NYC Department of City Planning PLUTO data is NYC Department Of Education.
Does 15 Fairfield Street have violations?
NYC HPD has no housing violations on record for this property.
Is 15 Fairfield Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 15 Fairfield Street built?
City records list 1975 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.