268 New Dorp Lane
Staten Island, NY 10306BBL 5-04219-0045Map
Owner of record: 268 New Dorp Lane LLC
268 New Dorp Lane is a mixed residential and retail building built in 1945 in Staten Island, 10306. It has 3 residential units across 2 floors. The owner of record is 268 New Dorp Lane LLC. HPD has recorded 40 housing violations here, most recently on August 20, 2026. 40 of the 40 most recent violations are still open.
- HPD violations
- 40
- DOB violations
- 12
- ECB violations
- 5
- HPD complaints
- 63
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 40
- BHazardous
Properly repair with similar material the broken or defective concrete at landing( under entrance door to apt #2) at stoop
Aug 20, 2026
Open — Nov sent out - BHazardous
Abate the nuisance consisting of pests. evidence of ants in the entire apartment located at apt 2, 1st story, 1st apartment from south at west
Aug 20, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tile at floor in the 1st room from north at east located at apt 2, 1st story, 1st apartment from south at west
Aug 20, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at east wall in the foyer located at apt 2, 1st story, 1st apartment from south at west
Aug 20, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective connection at waste line under sink in the kitchen located at apt 2, 1st story, 1st apartment from south at west
Aug 20, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the mildew on grout around bathtub and between ceramic tile at all walls in the bathroom located at apt 2, 1st story, 1st apartment from south at west
Aug 20, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tile at south wall in the bathroom located at apt 2, 1st story, 1st apartment from south at west
Aug 20, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective wood base cabinet under sink at east wall in the kitchen located at apt 2, 1st story, 1st apartment from south at west
Aug 20, 2026 · Apt 2
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10sq ft at ceiling in the bathroom located at apt 2, 1st story, 1st apartment from south at west
Aug 20, 2026 · Apt 2
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective wood frame around door in the entrance located at apt 2, 1st story, 1st apartment from south at west
Aug 20, 2026 · Apt 2
Open — Nov sent out
Show 30 more ↓
- BHazardous
Properly repair or replace the broken or defective counter balance on upper sash at 1st window from north at east wall in the 1st room from north at east located at apt 2, 1st story, 1st apartment from south at west
Aug 20, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at west wall in the 2nd room from north at west located at apt 2, 1st story, 1st apartment from south at west
Aug 20, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color south wall in the 1st room from north located at apt 1r, 1st story
Oct 29, 2013 · Apt 1R
Open — Invalid certification - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color west wall and ceiling in the bathroom located at apt 1r, 1st story
Oct 29, 2013 · Apt 1R
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color south wall by radiator in the kitchen located at apt 1r, 1st story
Oct 29, 2013 · Apt 1R
Open — Invalid certification - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the 2nd room from east located at apt 1r, 1st story
Oct 29, 2013 · Apt 1R
Open — Invalid certification - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 2nd room from east located at apt 1r, 1st story
Oct 29, 2013 · Apt 1R
Open — Invalid certification - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 2nd room from north located at apt 1r, 1st story
Oct 29, 2013 · Apt 1R
Open — Invalid certification - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 268, 2nd story
Oct 28, 2011 · Apt 268
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood window frame at north wall in the 1st room from north located at apt 268, 2nd story
Oct 28, 2011 · Apt 268
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood window frame at north wall in the 2nd room from north located at apt 268, 2nd story
Oct 28, 2011 · Apt 268
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the kitchen located at apt 268, 2nd story
Oct 28, 2011 · Apt 268
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock installed at entrance door , 1st story
Oct 28, 2011
Open — Nov sent out - BHazardous
Properly secure the loose saddle in the entrance located at apt 2, 1st story
Jul 28, 2010 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood frame at door in the entrance located at apt 2, 1st story
Jul 28, 2010 · Apt 2
Open — Nov sent out - BHazardous
Replace with new the broken or defective wood door in the 1st room from north at west located at apt 2, 2nd story
Jul 28, 2010 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective rotted wood and vinyl tiles floor in the 1st room from north at west located at apt 2, 2nd story
Jul 28, 2010 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color north and east walls in the 1st room from north at west located at apt 2, 2nd story
Jul 28, 2010 · Apt 2
Open — Nov sent out - BHazardous
Provide adequate supply of cold water for the fixtures ( lower pressure ) at washbasin in the bathroom located at apt 2, 2nd story
Jul 28, 2010 · Apt 2
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2, 2nd story
Jul 28, 2010 · Apt 2
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl ( loose ) in the bathroom located at apt 2, 2nd story
Jul 28, 2010 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color west wall in the private hallway located at apt 2, 2nd story
Jul 28, 2010 · Apt 2
Open — Nov sent out - CImmediately hazardous
Replace with new the missing handrail at stairs in the private hallway located at apt 2, 2nd story
Jul 28, 2010 · Apt 2
Open — First no access to re- inspect violation - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2, 2nd story
Jul 28, 2010 · Apt 2
Open — Nov sent out - ANon-hazardous
Refit doors and draws at base cabinets in the kitchen located at apt 2, 2nd story
Jul 28, 2010 · Apt 2
Open — Nov sent out - BHazardous
Properly secure the loose wall cabinets pulling away from west wall in the kitchen located at apt 2, 2nd story
Jul 28, 2010 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood and vinyl tiles floor in the kitchen located at apt 2, 2nd story
Jul 28, 2010 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 2, 2nd story
Jul 28, 2010 · Apt 2
Open — Nov sent out - BHazardous
Replace with new the broken or defective wood door in the bathroom located at apt 2, 2nd story
Jul 28, 2010 · Apt 2
Open — Nov sent out - BHazardous
Replace with new the broken or defective wood door in the 1st room from north at east located at apt 2, 2nd story
Jul 28, 2010 · Apt 2
Open — Nov sent out
DOB building violations · 12
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 18, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active
Show 2 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 4, 1993
Dob violation - dismissed
ECB violations · 5
- Class - 1
Failure to maintain exterior bldg wall note.section of parapet approx 15ftx6ft high is leanning into bldg approx 8inches brick parapet triangular shape is on top of 2 1/2 story bldg.bldg has residential units a
Feb 22, 2011 · Penalty $250
Resolve - Non-hazardous
Altered building occupied wihtout a valid certificate of occupancy foralt #500085267. remedy: obtain a valid certificate of occupancy.
Sep 13, 2005 · Penalty $2,500
Active - Non-hazardous
Work without a permit. in that a 10ftx16ft shed has been constructed rear lot (fiegiong found in side) remedy: obtain approval and permit.
Nov 30, 1995 · Penalty $350
Active - Non-hazardous
Work without a permit. work noted a pidgen coop was erected at rear ofpremises approx.8 ft.wide by 16 ft. long. remedy: obtain permit or disontinue illegal use.
Mar 11, 1992 · Penalty $1,000
Active - Non-hazardous
Occupancy contrary to that allowed by dept. records apt being used as contractors office. remedy: obtain approvals and permit.
Sep 19, 1988 · Penalty $125
Active
Complaints
- Paint/plaster
Wall
Aug 19, 2026 · Apt 2
Close - Unsanitary condition
Mold
Aug 19, 2026 · Apt 2
Close - Door/window
Window frame
Aug 19, 2026 · Apt 2
Close - Unsanitary condition
Pests
Aug 19, 2026 · Apt 2
Close - Paint/plaster
Wall
Aug 19, 2026 · Apt 2
Close - Unsanitary condition
Mold
Aug 19, 2026 · Apt 2
Close - General
Cabinet
Aug 19, 2026 · Apt 2
Close - Plumbing
Basin/sink
Aug 19, 2026 · Apt 2
Close - Appliance
Electric/gas range
Aug 19, 2026 · Apt 2
Close - Heating
Heat related
Oct 26, 2013 · Apt NA
Close
Show 40 more ↓
- Paint/plaster
Wall
Mar 20, 2012 · Apt 268
Close - Paint/plaster
Wall
Mar 20, 2012 · Apt 268
Close - Paint/plaster
Wall
Mar 20, 2012 · Apt 268
Close - General
Windows
Mar 20, 2012 · Apt 268
Close - General
Windows
Mar 20, 2012 · Apt 268
Close - Paint/plaster
Wall
Oct 3, 2011 · Apt 268
Close - Nonconst
Vermin
Oct 3, 2011 · Apt 268
Close - Plumbing
Water-leaks
Oct 3, 2011 · Apt 268
Close - General
Windows
Oct 3, 2011 · Apt 268
Close - General
Windows
Oct 3, 2011 · Apt 268
Close - General
Windows
Oct 3, 2011 · Apt 268
Close - Nonconst
Rubbish
Jan 18, 2011 · Apt 2
Close - General
Locks
Jan 18, 2011 · Apt 2
Close - General
Doors
Jan 18, 2011 · Apt 2
Close - Plumbing
Shower-stall
Jan 18, 2011 · Apt 2
Close - General
Cabinet
Jan 18, 2011 · Apt 2
Close - Plumbing
Basin/sink
Jan 18, 2011 · Apt 2
Close - General
Floor
Nov 15, 2010 · Apt 2
Close - Nonconst
Vermin
Nov 15, 2010 · Apt 2
Close - Electric
Wiring
Nov 15, 2010 · Apt 2
Close - General
Doors
Nov 15, 2010 · Apt 2
Close - General
Windows
Nov 15, 2010 · Apt 2
Close - General
Floor
Nov 15, 2010 · Apt 2
Close - Plumbing
Water supply
Nov 15, 2010 · Apt 2
Close - Paint/plaster
Wall
Jul 20, 2010 · Apt 2
Close - General
Floor
Jul 20, 2010 · Apt 2
Close - General
Cabinet
Jul 20, 2010 · Apt 2
Close - General
Doors
Jul 20, 2010 · Apt 2
Close - Paint/plaster
Ceiling
Jul 12, 2010 · Apt 2
Close - Paint/plaster
Wall
Jul 12, 2010 · Apt 2
Close - Paint/plaster
Wall
Jul 12, 2010 · Apt 2
Close - General
Floor
Jul 12, 2010 · Apt 2
Close - General
Floor
Jul 12, 2010 · Apt 2
Close - General
Floor
Jul 12, 2010 · Apt 2
Close - Paint/plaster
Wall
Jul 12, 2010 · Apt 2
Close - General
Doors
Jul 12, 2010 · Apt 2
Close - General
Cabinet
Jul 12, 2010 · Apt 2
Close - Plumbing
Basin/sink
Apr 20, 2009 · Apt F1
Close - Paint/plaster
Ceiling
Apr 20, 2009 · Apt F1
Close - General
Windows
Apr 20, 2009 · Apt F1
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| May 21, 2026 | $1,200,000 | Rentals - 4-10 unit | 4 |
Building details
- Building type
- Mixed residential and retail building (S3)
- Year built
- 1945
- Floors
- 2
- Residential units
- 3
- Building area
- 3,232 ft²
- Lot area
- 4,000 ft²
- Zoning
- R3-2
- Community board
- 502
- Council district
- 50
- Block / lot
- 4219 / 45
- Assessed value
- $246,150
- Landmark / historic district
- No
HPD registration #18916, last renewed Jul 28, 2026.
Questions about 268 New Dorp Lane
Who owns 268 New Dorp Lane?
The owner of record in NYC Department of City Planning PLUTO data is 268 New Dorp Lane LLC.
Does 268 New Dorp Lane have violations?
Yes. NYC HPD has recorded 40 housing violations at this property.
Is 268 New Dorp Lane rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 268 New Dorp Lane built?
City records list 1945 as the year it was built.
How many apartments are in 268 New Dorp Lane?
It has 3 residential units and 4 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.