roofy

Violations at 2838 Hylan Boulevard

Staten Island, NY 10306 · BBL 5-04001-0001 · Back to the property

HPD housing violations

The newest 50 of 445 HPD violations. The city keeps the complete history.

  • BHazardous

    Replace with new the missing water stopper at wash basin in the bathroom located at apt a19, 1st story, 1st apartment from north at east

    Oct 21, 2026 · Apt A19

    Open — Nov sent out
  • BHazardous

    Replace with new the missing water stopper at bathtub in the bathroom located at apt a19, 1st story, 1st apartment from north at east

    Oct 21, 2026 · Apt A19

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective ceramic tile at north wall in the bathroom located at apt a19, 1st story, 1st apartment from north at east

    Oct 21, 2026 · Apt A19

    Open — Nov sent out
  • BHazardous

    Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt a19, 1st story, 1st apartment from north at east

    Oct 21, 2026 · Apt A19

    Open — Nov sent out
  • ANon-hazardous

    Cleanse to the satisfaction of this department the mildew on grout around bathtub in the bathroom located at apt a19, 1st story, 1st apartment from north at east

    Oct 21, 2026 · Apt A19

    Open — Nov sent out
  • ANon-hazardous

    Trace and repair the source and abate the visible mold condition... less than 10sq ft at ceiling and north wall in the bathroom located at apt a19, 1st story, 1st apartment from north at east

    Oct 21, 2026 · Apt A19

    Open — Notice of issuance sent to tenant
  • CImmediately hazardous

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the bathroom located at apt a19, 1st story, 1st apartment from north at east

    Oct 21, 2026 · Apt A19

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt a19, 1st story, 1st apartment from north at east

    Oct 21, 2026 · Apt A19

    Open — Nov sent out
  • BHazardous

    Properly secure the loose handrail at west wall at stairs to upper level section b18 , 1st story

    Oct 15, 2026

    Open — Nov sent out
  • BHazardous

    Properly secure the loose metal handrail at stairs at building front

    Oct 15, 2026

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from east located at apt b18, 2nd story, 1st apartment from east at south

    Oct 15, 2026 · Apt B18

    Open — Nov sent out
  • CImmediately hazardous

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 4th room from east located at apt b18, 2nd story, 1st apartment from east at south

    Oct 15, 2026 · Apt B18

    Open — Nov sent out
  • ANon-hazardous

    Properly repair with similar material the broken or defective regrout around bathtub in the bathroom located at apt b18, 2nd story, 1st apartment from east at south

    Oct 15, 2026 · Apt B18

    Open — Nov sent out
  • ANon-hazardous

    Properly repair with similar material the broken or defective reglaze enamel porcelain at bathtub in the bathroom located at apt b18, 2nd story, 1st apartment from east at south

    Oct 15, 2026 · Apt B18

    Open — Nov sent out
  • CImmediately hazardous

    Properly secure the loose washbasin in the bathroom located at apt b18, 2nd story, 1st apartment from east at south

    Oct 15, 2026 · Apt B18

    Open — Nov sent out
  • CImmediately hazardous

    Trace and repair the source and abate the visible mold condition... more than 30 sq ft at ceiling in the bathroom located at apt b18, 2nd story, 1st apartment from east at south

    Oct 15, 2026 · Apt B18

    Open — Notice of issuance sent to tenant
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east located at apt b18, 2nd story, 1st apartment from east at south

    Oct 15, 2026 · Apt B18

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling at closet at east in the 3rd room from east located at apt b18, 2nd story, 1st apartment from east at south

    Oct 15, 2026 · Apt B18

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 3rd room from east located at apt b18, 2nd story, 1st apartment from east at south

    Oct 15, 2026 · Apt B18

    Open — Nov sent out
  • CImmediately hazardous

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling at closet at east in the 3rd room from east located at apt b18, 2nd story, 1st apartment from east at south

    Oct 15, 2026 · Apt B18

    Open — Nov sent out
  • ANon-hazardous

    Properly repair with similar material the broken or defective ceramic floor tile in the kitchen located at apt b18, 2nd story, 1st apartment from east at south

    Oct 15, 2026 · Apt B18

    Open — Nov sent out
  • CImmediately hazardous

    Repair the broken or defective plastered surfaces and paint in uniform color the south wall in the kitchen located at apt b18, 2nd story, 1st apartment from east at south

    Oct 15, 2026 · Apt B18

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at south wall in the kitchen located at apt b18, 2nd story, 1st apartment from east at south

    Oct 15, 2026 · Apt B18

    Open — Nov sent out
  • CImmediately hazardous

    Properly repair or replace the broken or defective counter balance of lower sash window at south in the kitchen located at apt b18, 2nd story, 1st apartment from east at south

    Oct 15, 2026 · Apt B18

    Open — Nov sent out
  • BHazardous

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt b18, 2nd story, 1st apartment from east at south

    Oct 15, 2026 · Apt B18

    Open — Nov sent out
  • BHazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt b18, 2nd story, 1st apartment from east at south

    Oct 15, 2026 · Apt B18

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt b18, 2nd story, 1st apartment from east at south

    Oct 15, 2026 · Apt B18

    Open — Nov sent out
  • ANon-hazardous

    Refit door in the entrance located at apt b18, 2nd story, 1st apartment from east at south

    Oct 15, 2026 · Apt B18

    Open — Nov sent out
  • CImmediately hazardous

    Properly repair with similar material the broken or defective ceramic tile at south wall in the bathroom located at apt b18, 2nd story, 1st apartment from east at south

    Oct 15, 2026 · Apt B18

    Open — Nov sent out
  • CImmediately hazardous

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at ceiling at closet at east in the 3rd room from east located at apt b18, 2nd story, 1st apartment from east at south

    Oct 15, 2026 · Apt B18

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective wood floor in the foyer located at apt b18, 2nd story, 1st apartment from east at south

    Oct 15, 2026 · Apt B18

    Open — Nov sent out
  • CImmediately hazardous

    Trace and repair the source and abate the visible mold condition... more than 30 sq ft observed at ceiling and north wall inside closet at east in the 3rd room from east located at apt b18, 2nd story, 1st apartment from east at south

    Oct 15, 2026 · Apt B18

    Open — Notice of issuance sent to tenant
  • BHazardous

    Abate the infestation consisting of mice in the entire apartment located at apt b18, 2nd story, 1st apartment from east at south

    Oct 15, 2026 · Apt B18

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the bathroom , the 4th room from north at west, the private hallway , the foyer , the 1st room from north located at apt 1stfl, 1st story, 1st apartment from east at south

    Aug 19, 2026 · Apt 1STFL

    Open — Civ14 mailed
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 1stfl, 1st story, 1st apartment from east at south

    Aug 19, 2026 · Apt 1STFL

    Open — Civ14 mailed
  • ANon-hazardous

    Trace and repair the source and abate the visible mold condition... less than 10 sq.ft north wall in the bathroom located at apt 1stfl, 1st story, 1st apartment from east at south

    Aug 19, 2026 · Apt 1STFL

    Open — Civ14 mailed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1stfl, 1st story, 1st apartment from east at south

    Aug 19, 2026 · Apt 1STFL

    Open — Civ14 mailed
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt b27, 2nd story, 1st apartment from north at east

    Apr 1, 2026 · Apt B27

    Closed — Violation dismissed
  • BHazardous

    Properly secure the loose sliding doors on closet at north wall in the 2nd room from east at south located at apt a55, 1st story, 1st apartment from east at south

    Feb 20, 2026 · Apt A55

    Closed — Violation dismissed
  • CImmediately hazardous

    Properly repair with similar material the broken or defective ceramic tile at east wall in the bathroom located at apt a55, 1st story, 1st apartment from east at south

    Feb 20, 2026 · Apt A55

    Closed — Violation dismissed
  • BHazardous

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt a55, 1st story, 1st apartment from east at south

    Feb 20, 2026 · Apt A55

    Closed — Violation dismissed
  • BHazardous

    Replace with new the missing mechanical water stopper at wash basin at south wall in the bathroom located at apt a55, 1st story, 1st apartment from east at south

    Feb 20, 2026 · Apt A55

    Closed — Violation dismissed
  • BHazardous

    Remove all obstructions and repair all defects in waste line under wash basin at south wall in the bathroom located at apt a55, 1st story, 1st apartment from east at south

    Feb 20, 2026 · Apt A55

    Closed — Violation dismissed
  • BHazardous

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt a55, 1st story, 1st apartment from east at south

    Feb 20, 2026 · Apt A55

    Closed — Violation dismissed
  • BHazardous

    Properly repair with similar material the broken or defective caulking around bathtub and between ceramic tile at all walls in the bathroom located at apt a55, 1st story, 1st apartment from east at south

    Feb 20, 2026 · Apt A55

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hot water fixtures in the kitchen located at apt a55, 1st story, 1st apartment from east at south

    Feb 20, 2026 · Apt A55

    Closed — Violation dismissed
  • ANon-hazardous

    Replace with new the missing safety plastic cover on 2nd electrical outlet from east at south wall inside wall cabinet in the kitchen located at apt a55, 1st story, 1st apartment from east at south

    Feb 20, 2026 · Apt A55

    Closed — Violation dismissed
  • ANon-hazardous

    Replace with new the missing safety plastic covers on 1st electrical outlet from east at south wall in the kitchen located at apt a55, 1st story, 1st apartment from east at south

    Feb 20, 2026 · Apt A55

    Closed — Violation dismissed
  • BHazardous

    Properly secure the loose 1st electrical outlet from east at south wall in the kitchen located at apt a55, 1st story, 1st apartment from east at south

    Feb 20, 2026 · Apt A55

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color at all walls and ceiling in the kitchen located at apt b58, 1st story, 1st apartment from north at east

    Jan 31, 2026 · Apt B58

    Closed — Violation dismissed

DOB building violations

14 DOB violations, newest first.

  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Mar 15, 2010

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 4, 1993

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jan 4, 1991

    Dob violation - dismissed

ECB violations

2 ECB violations, newest first.

  • Non-hazardous

    34a. 34a-and door frame is broken

    Oct 16, 2003 · Penalty $180

    Resolve
  • Non-hazardous

    Work without a permit work noted 5 car garage located behind premises has been removed without pemrit and approval remedy obtain approval and permit from this department

    Apr 2, 1991

    Resolve