roofy

Violations at 2636 Hylan Blvd

Staten Island, NY 10306 · BBL 5-03969-0001 · Back to the property

HPD housing violations

No HPD violations on record

DOB building violations

38 DOB violations, newest first.

  • High pressure boiler boiler required

    Violation issued-failure to file 2020 internal hgh pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 20, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 20, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 20, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 20, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 20, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 20, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 20, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 20, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 20, 2021

    Dob violation - resolved
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2019

    Jun 29, 2020

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 2, 2020

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2019

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 16, 2019

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 12, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 12, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 12, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 12, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 12, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 12, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 14, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 31, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 7, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 10, 2018

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Feb 23, 1998

    Vw*-violation - work w/o permit dismissed
  • Construction other optional

    C-construction other optional

    Sep 25, 1992

    Vp*-violation unserved ecb- dismissed
  • Construction other optional

    C-construction other optional

    Sep 25, 1992

    Vpw*-violation unserved ecb-work without permit-dismissed
  • Zoning none

    Z-zoning none

    Aug 2, 1991

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Aug 2, 1991

    Vw*-violation - work w/o permit dismissed
  • Zoning none

    Z-zoning none

    Aug 2, 1991

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Aug 2, 1991

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Aug 2, 1991

    Vw*-violation - work w/o permit dismissed
  • Construction other optional

    C-construction other optional

    Aug 2, 1991

    Vw*-violation - work w/o permit dismissed
  • Construction other optional

    C-construction other optional

    Aug 2, 1991

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jun 14, 1990

    Vp*-violation unserved ecb- dismissed
  • Plumbing none

    P-plumbing none

    Feb 5, 1990

    Dob violation - dismissed

ECB violations

The newest 50 of 67 ECB violations. The city keeps the complete history.

  • Class - 3

    Failure to maintain building in code compliance manner; at time of inspection observed concrete flooring have been defective and crack into loose piece of of stones approx. 2' radius around the weights (dumb be

    Dec 3, 2025 · Penalty $500

    Active
  • Class - 2

    Ati i observed an approx 30" by 4ft arear of the concrete floor which is broken/damaged with exposed rubble & wire mesh and covered with a rubber matt area is the r/s rear & is a potential hazard for customers.

    Aug 1, 2025

    Resolve
  • Class - 2

    Failure to maintain building in code-compliant manner. at time of inspection observed concrete floor spalling and exposed rebar at 2nd floor level at la fitness commercial space., repair and/or replace; concret

    Apr 10, 2025 · Penalty $1,250

    Resolve
  • Class - 1

    Building or open lot occupied without a valid certificate of occupancy. at time of inspection, observed the interior of commercial store "new york man suits". noted store occupied with approx. 2 salesmen on 1st

    Mar 29, 2025

    Resolve
  • Class - 2

    Occupancy contrary to that allowed by the certificate of occupancy or buildings department records. at time of inspection, observed the commercial retail store "new york man suits" is using the cellar level in

    Mar 29, 2025 · Penalty $1,250

    Active
  • Class - 2

    Construction fence not conforming to approved drawings. drawings call for construction fence to be installed 3 feet from building facade wall at exp#4. observed construction fence installed 8 feet away from bui

    Aug 30, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Found u s boiler co. boiler missing system piping insulation as per mc 1204.1 , manufacturers instruction not on site at time of inspection as per mc 304.1 missing manual reset aquastat as per mc 1004/csd 1 /cw

    Apr 21, 2021 · Penalty $625

    Resolve
  • Class - 2

    Failure to safeguard all persons and property affected by constructionoperations.at the time of inspection of a 2 story nb in response to anincident,active work.observed work being done at exp#2 such as minor e

    Sep 17, 2020 · Penalty $5,000

    Resolve
  • Class - 2

    Work does not conform(supported scaffold). at the time of inspection at a new bldg under active construction i observed a supported scaffolderected at the rear at exp#2 approx 45 feet tall installed contrary to

    Mar 5, 2020

    Resolve
  • Class - 2

    Work does not conform to approved documents. at the time of inspectionof a new bldg under active construction i observed c-joist installed for the mezzanine level in bldg"g"installed under permit#520371339. the

    Mar 5, 2020

    Resolve
  • Class - 1

    Failure to provide evidence of workers training. note:at time of inspection responding to an incident where a worker was injured while operating a pipe grooving equipment,upon request for evidence for workers t

    Sep 3, 2019 · Penalty $5,000

    Resolve
  • Class - 1

    Inadequate orientation logs. at time of inspection responding to an incident where worker injured his finger upon request for the site orientation report for that day-observed to be inadequate-missing workers c

    Sep 3, 2019

    Resolve
  • Class - 1

    Manufacturer specifications. at time of inspection of an active job site of a 2 story commercial building observed equipment on site used for installing groove at circumference. where a worker was injured respo

    Sep 3, 2019

    Resolve
  • Class - 1

    Failure to notify department of an incident that resulted in a fatality or injury on 9/3/19.note:one worker was using an electric machine tocut tread on pipes placing his finger on a pipe when spinning on the m

    Sep 3, 2019 · Penalty $1,250

    Resolve
  • Class - 1

    28-105.12.2 work does not conform to design drawings. note: at the time of my inspection of an active jobsite i observed the fence condi tion at exp4 by building f not conform to site safety play, where the

    May 22, 2019

    Resolve
  • Class - 2

    Bc3310.8.4 site safety log. note: at time of my inspeciton observed active jobsite. site safety manager: sileylo alvarado jr #2431 review his logbook form 04/13/19 through 05/17/19 he did not signature on his

    May 17, 2019

    Resolve
  • Class - 1

    Failure to designate site safety manaer present at site as required. noted: at time of inspeciton observed active jobsite site safety mana ger on pw2 louie agnew #m001520 was prresent last date. 4/14/19 review

    May 17, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Erected or installed supported pipe scaffold 40'or higher w/o a permitat time of inspection on an active jobsite i observed erected pipe scaffold inside elevator shaft 7 x 6' sections apprx 45' when i asked for

    Feb 7, 2019 · Penalty $5,000

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35343313n issued on 08-22-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.

    Nov 29, 2018 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to provide approved construction documents. nb-job#520305928 on an energy code comliance inspection, failed to provide approved/ accepted en drawing at site at time of inspection. rmdy:provide approv

    Oct 25, 2018 · Penalty $500

    Resolve
  • Class - 2

    Failure to comply with the commissioners order containd in summons/violation #35343307r issueed on 08/08/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for c of c.rem:comply wi

    Sep 24, 2018 · Penalty $1,250

    Resolve
  • Class - 1

    Inadequate safety measures using a tow truck as a crane on active jobsite w/o a cn plan from a nys licensed engineer to lift a concrete-vault which requires a drawing,master riggers supervision or pe's supervis

    Sep 20, 2018 · Penalty $10,000

    Resolve
  • Class - 1

    Operation of a crane w/o acert of approval.hudson meridian construct was using a tow truck instead of a crane to hoist a concrete vault on an active jobsite which requires a crane w/a cert of approval.rem:obta

    Sep 20, 2018 · Penalty $5,000

    Resolve
  • Class - 1

    Operation of a crane w/o a cert of operations @the time of my insp.hudson meridian construct was using a tow truck as a crane on an active job site to off load a concrete precast vault w/o a cert of operation.

    Sep 20, 2018 · Penalty $5,000

    Resolve
  • Class - 2

    Operation of a crane w/o a certificate of onsite inspection at the time of inspection. hudson meridian construct gc #29921. was using a tow truck from () towing serice inc of rutherford nj to lift concrete out

    Sep 20, 2018 · Penalty $5,000

    Resolve
  • Class - 1

    Operation of a crane w/o a cert of operation @time of my insp.nicks towing service was lifting a concrete vault/(precast)@ an active jobsitewhich requires a cert of operation(cd)using tow truck #86.us dot#04293

    Sep 20, 2018 · Penalty $5,000

    Resolve
  • Class - 2

    Operation of a crane w/o a certificate of onsite inspection.@time of my insp nicks towing service was using tow truck unit #86 us dot #042930693 a crane to unload concrete vault of an active job site which req

    Sep 20, 2018 · Penalty $5,000

    Resolve
  • Class - 1

    Operation of a crane w/o a cert of approval.@ time of my insp nicks towing was lifting a concrete (vault)@ an active job site which requiresa cert of approval for the crane to lift the vault.rem:comply w/code

    Sep 20, 2018 · Penalty $5,000

    Resolve
  • Class - 1

    Use of power operated hoisting machine w/o a hoisting machine operatorlicense @an active const site.patrick breen was using a tow truck as a crane(to)flood concrete process vault/job @time of my insp the tow t

    Sep 20, 2018 · Penalty $5,000

    Resolve
  • Class - 1

    Work without a permit. observed: they erected a 2 story steel buildingjust a shell. new job#520305928 was permitted on 8/22/18 but this sitewas erected before permit was pulled. remedy: obtain permits

    Aug 22, 2018 · Penalty $800

    Resolve
  • Class - 1

    Work does not conform to approved constr documents and/or approved amendments. observed: this steel 2 story structure being erected about30% complete with about 25-40 workers on this site/entire site has ove

    Aug 8, 2018 · Penalty $2,530

    Resolve
  • Class - 2

    Inadequate "n0" control access zone. at time of inspection observed anactive construction site with steel and excavation work in progress, during inspetion noted at bldg area "f" at exp#4, has been inadequate

    Jun 7, 2018 · Penalty $625

    Resolve
  • Class - 2

    Failure to perform proper concrete washout water procedures at construction site. at time of inspection observed an active construction sitewith steel,excavatio,concrete work was on progress,during inspection

    Jun 7, 2018 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to control ground water to adequately investigate and control or preven thte inflow water ito the excavation site. at time of inspection observed an active construction site with steel excavation work

    Jun 7, 2018 · Penalty $625

    Resolve
  • Class - 1

    Uncapped rebars. at time of inspection observed an active constructionsite with steel and excavation work in progress,during inspection noted has doing footing and foundation walls for a new shopping wall and

    Jun 7, 2018 · Penalty $2,500

    Resolve
  • Class - 1

    Cease use b154,51 paloma tankless water heater model no.ph-28 gas fired 199,000 btu observed corroded flue vent from the hot water heater in the boiler room to the outside.heat until such is removed by dob

    Nov 3, 2017 · Penalty $2,500

    Resolve
  • Class - 2

    Bc3310.6 failure to have disignated ssm as per code pwl shows ssm to be william bellini ssm#1413.ssm#2249 john campbell has been on site since 10/2/17.rem:designate ssm as per code

    Oct 18, 2017 · Penalty $400

    Resolve
  • Class - 2

    Contrary to site safety plan noticed at time of inspection ssp shows bldg at 2630 hylan blvd,demo of bldg e has begun and was partially demolished.rem:stop all work amend ssp.

    Oct 18, 2017 · Penalty $250

    Resolve
  • Class - 2

    Contrary to site safety plan.noticed @time of inspection dm in progress commencement of demo on 10/9/17 in dob system. ssp shows sequence tostart at bldg a 2630 hylan blvd &goes from these to bldg d 109 mill rd

    Oct 18, 2017 · Penalty $250

    Resolve
  • Class - 2

    Contrary to site safety plan,noticed @ time of inspection demo in pro gress,notice commencement of demo on 10/9/17,in dob system.ssp shows demo to begin @ bldg a 2630 hylan before commencement of bldg c 107 miu

    Oct 18, 2017 · Penalty $250

    Resolve
  • Class - 2

    Contrary to approved site safety plan.noticed @time of insp dm in progress.noticed demolition commencement 10/9/17 in dob system noticed sspstates bldg @ 2630 hylan blvd should be demolished first prior to any

    Oct 18, 2017 · Penalty $250

    Resolve
  • Class - 2

    Contrary to approved site safety plan noticed @ time of inspection dm in progress noticed ssp states bldg a(2630 hylan blvd)should be demolished before demo begins at bldg e(123 mill rd)bldg e has been partiall

    Oct 18, 2017 · Penalty $250

    Resolve
  • Class - 1

    Bc33035.1 failure to remove combustible material prior to hot works operation.noticed at time of inspection incident, workers welding out steel 100ft volts to be demolished,when sparks sprinkler down onto combu

    Oct 18, 2017 · Penalty $1,600

    Resolve
  • Class - 2

    Work does not conform to approved construction documents &/or approvedamendments. premises under alt 2 job#520222884 loc folder obj: plan does not indicate gas connection line details for connection gas line to

    Nov 2, 2016 · Penalty $500

    Resolve
  • Class - 2

    Failure to provide required sign - upon inspection noted in this active demolition site, contractor's sign and the sign w/the statement, "toanonymously report unsafe conditions at this work site. that endanger

    Mar 13, 2012

    Resolve
  • Class - 1

    Work does not conform to approved plan - upon inspection demo work of commercial bldg in progress. at time of inspection noted, chain link fence has been provided in exps 1 & 4 of the job site which is not in

    Mar 13, 2012 · Penalty $250

    Resolve
  • Class - 3

    Sec. zr36-56. required screening such as densely planted shrubs/trees or 6' opaque fencing has not been provided at all adjoining lots in residence districts - including such zoning lots situated across a

    Jun 18, 2009 · Penalty $300

    Resolve
  • Non-hazardous

    Work w/o a permit. noted:large community antenna approx 70'tall was installed at the north/east section of lot at alleyway for delivery. base of antenna is in an enclosure (chain link fence)all work 100% comple

    Feb 17, 2007 · Penalty $500

    Resolve
  • Non-hazardous

    New bldg occupied w/o a valid c of o according to dob records temp c of o issued 7/25/58- no permanent c of o of record. remedy: obtain valid c of o.

    Nov 4, 2006 · Penalty $700

    Resolve
  • Non-hazardous

    Failure to maintain: in that the rear paved lot is not being utilized for its intended use, and is being used for the storage of metal con- tainers (approx 8'x 40'x 10') used for storage. remedy: obtain approv-

    Mar 8, 1999 · Penalty $350

    Resolve