Violations at 2636 Hylan Blvd
Staten Island, NY 10306 · BBL 5-03969-0001 · Back to the property
HPD housing violations
No HPD violations on record
DOB building violations
38 DOB violations, newest first.
- High pressure boiler boiler required
Violation issued-failure to file 2020 internal hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 20, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 20, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 20, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 20, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 20, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 20, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 20, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 20, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 20, 2021
Dob violation - resolved - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2019
Jun 29, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 16, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 12, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 12, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 12, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 12, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 12, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 12, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 14, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 31, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 7, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 10, 2018
Dob violation - dismissed - Construction other optional
C-construction other optional
Feb 23, 1998
Vw*-violation - work w/o permit dismissed - Construction other optional
C-construction other optional
Sep 25, 1992
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Sep 25, 1992
Vpw*-violation unserved ecb-work without permit-dismissed - Zoning none
Z-zoning none
Aug 2, 1991
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 2, 1991
Vw*-violation - work w/o permit dismissed - Zoning none
Z-zoning none
Aug 2, 1991
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 2, 1991
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 2, 1991
Vw*-violation - work w/o permit dismissed - Construction other optional
C-construction other optional
Aug 2, 1991
Vw*-violation - work w/o permit dismissed - Construction other optional
C-construction other optional
Aug 2, 1991
Dob violation - dismissed - Construction other optional
C-construction other optional
Jun 14, 1990
Vp*-violation unserved ecb- dismissed - Plumbing none
P-plumbing none
Feb 5, 1990
Dob violation - dismissed
ECB violations
The newest 50 of 67 ECB violations. The city keeps the complete history.
- Class - 3
Failure to maintain building in code compliance manner; at time of inspection observed concrete flooring have been defective and crack into loose piece of of stones approx. 2' radius around the weights (dumb be
Dec 3, 2025 · Penalty $500
Active - Class - 2
Ati i observed an approx 30" by 4ft arear of the concrete floor which is broken/damaged with exposed rubble & wire mesh and covered with a rubber matt area is the r/s rear & is a potential hazard for customers.
Aug 1, 2025
Resolve - Class - 2
Failure to maintain building in code-compliant manner. at time of inspection observed concrete floor spalling and exposed rebar at 2nd floor level at la fitness commercial space., repair and/or replace; concret
Apr 10, 2025 · Penalty $1,250
Resolve - Class - 1
Building or open lot occupied without a valid certificate of occupancy. at time of inspection, observed the interior of commercial store "new york man suits". noted store occupied with approx. 2 salesmen on 1st
Mar 29, 2025
Resolve - Class - 2
Occupancy contrary to that allowed by the certificate of occupancy or buildings department records. at time of inspection, observed the commercial retail store "new york man suits" is using the cellar level in
Mar 29, 2025 · Penalty $1,250
Active - Class - 2
Construction fence not conforming to approved drawings. drawings call for construction fence to be installed 3 feet from building facade wall at exp#4. observed construction fence installed 8 feet away from bui
Aug 30, 2022 · Penalty $1,250
Resolve - Class - 2
Found u s boiler co. boiler missing system piping insulation as per mc 1204.1 , manufacturers instruction not on site at time of inspection as per mc 304.1 missing manual reset aquastat as per mc 1004/csd 1 /cw
Apr 21, 2021 · Penalty $625
Resolve - Class - 2
Failure to safeguard all persons and property affected by constructionoperations.at the time of inspection of a 2 story nb in response to anincident,active work.observed work being done at exp#2 such as minor e
Sep 17, 2020 · Penalty $5,000
Resolve - Class - 2
Work does not conform(supported scaffold). at the time of inspection at a new bldg under active construction i observed a supported scaffolderected at the rear at exp#2 approx 45 feet tall installed contrary to
Mar 5, 2020
Resolve - Class - 2
Work does not conform to approved documents. at the time of inspectionof a new bldg under active construction i observed c-joist installed for the mezzanine level in bldg"g"installed under permit#520371339. the
Mar 5, 2020
Resolve - Class - 1
Failure to provide evidence of workers training. note:at time of inspection responding to an incident where a worker was injured while operating a pipe grooving equipment,upon request for evidence for workers t
Sep 3, 2019 · Penalty $5,000
Resolve - Class - 1
Inadequate orientation logs. at time of inspection responding to an incident where worker injured his finger upon request for the site orientation report for that day-observed to be inadequate-missing workers c
Sep 3, 2019
Resolve - Class - 1
Manufacturer specifications. at time of inspection of an active job site of a 2 story commercial building observed equipment on site used for installing groove at circumference. where a worker was injured respo
Sep 3, 2019
Resolve - Class - 1
Failure to notify department of an incident that resulted in a fatality or injury on 9/3/19.note:one worker was using an electric machine tocut tread on pipes placing his finger on a pipe when spinning on the m
Sep 3, 2019 · Penalty $1,250
Resolve - Class - 1
28-105.12.2 work does not conform to design drawings. note: at the time of my inspection of an active jobsite i observed the fence condi tion at exp4 by building f not conform to site safety play, where the
May 22, 2019
Resolve - Class - 2
Bc3310.8.4 site safety log. note: at time of my inspeciton observed active jobsite. site safety manager: sileylo alvarado jr #2431 review his logbook form 04/13/19 through 05/17/19 he did not signature on his
May 17, 2019
Resolve - Class - 1
Failure to designate site safety manaer present at site as required. noted: at time of inspeciton observed active jobsite site safety mana ger on pw2 louie agnew #m001520 was prresent last date. 4/14/19 review
May 17, 2019 · Penalty $2,500
Resolve - Class - 1
Erected or installed supported pipe scaffold 40'or higher w/o a permitat time of inspection on an active jobsite i observed erected pipe scaffold inside elevator shaft 7 x 6' sections apprx 45' when i asked for
Feb 7, 2019 · Penalty $5,000
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35343313n issued on 08-22-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.
Nov 29, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to provide approved construction documents. nb-job#520305928 on an energy code comliance inspection, failed to provide approved/ accepted en drawing at site at time of inspection. rmdy:provide approv
Oct 25, 2018 · Penalty $500
Resolve - Class - 2
Failure to comply with the commissioners order containd in summons/violation #35343307r issueed on 08/08/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for c of c.rem:comply wi
Sep 24, 2018 · Penalty $1,250
Resolve - Class - 1
Inadequate safety measures using a tow truck as a crane on active jobsite w/o a cn plan from a nys licensed engineer to lift a concrete-vault which requires a drawing,master riggers supervision or pe's supervis
Sep 20, 2018 · Penalty $10,000
Resolve - Class - 1
Operation of a crane w/o acert of approval.hudson meridian construct was using a tow truck instead of a crane to hoist a concrete vault on an active jobsite which requires a crane w/a cert of approval.rem:obta
Sep 20, 2018 · Penalty $5,000
Resolve - Class - 1
Operation of a crane w/o a cert of operations @the time of my insp.hudson meridian construct was using a tow truck as a crane on an active job site to off load a concrete precast vault w/o a cert of operation.
Sep 20, 2018 · Penalty $5,000
Resolve - Class - 2
Operation of a crane w/o a certificate of onsite inspection at the time of inspection. hudson meridian construct gc #29921. was using a tow truck from () towing serice inc of rutherford nj to lift concrete out
Sep 20, 2018 · Penalty $5,000
Resolve - Class - 1
Operation of a crane w/o a cert of operation @time of my insp.nicks towing service was lifting a concrete vault/(precast)@ an active jobsitewhich requires a cert of operation(cd)using tow truck #86.us dot#04293
Sep 20, 2018 · Penalty $5,000
Resolve - Class - 2
Operation of a crane w/o a certificate of onsite inspection.@time of my insp nicks towing service was using tow truck unit #86 us dot #042930693 a crane to unload concrete vault of an active job site which req
Sep 20, 2018 · Penalty $5,000
Resolve - Class - 1
Operation of a crane w/o a cert of approval.@ time of my insp nicks towing was lifting a concrete (vault)@ an active job site which requiresa cert of approval for the crane to lift the vault.rem:comply w/code
Sep 20, 2018 · Penalty $5,000
Resolve - Class - 1
Use of power operated hoisting machine w/o a hoisting machine operatorlicense @an active const site.patrick breen was using a tow truck as a crane(to)flood concrete process vault/job @time of my insp the tow t
Sep 20, 2018 · Penalty $5,000
Resolve - Class - 1
Work without a permit. observed: they erected a 2 story steel buildingjust a shell. new job#520305928 was permitted on 8/22/18 but this sitewas erected before permit was pulled. remedy: obtain permits
Aug 22, 2018 · Penalty $800
Resolve - Class - 1
Work does not conform to approved constr documents and/or approved amendments. observed: this steel 2 story structure being erected about30% complete with about 25-40 workers on this site/entire site has ove
Aug 8, 2018 · Penalty $2,530
Resolve - Class - 2
Inadequate "n0" control access zone. at time of inspection observed anactive construction site with steel and excavation work in progress, during inspetion noted at bldg area "f" at exp#4, has been inadequate
Jun 7, 2018 · Penalty $625
Resolve - Class - 2
Failure to perform proper concrete washout water procedures at construction site. at time of inspection observed an active construction sitewith steel,excavatio,concrete work was on progress,during inspection
Jun 7, 2018 · Penalty $2,500
Resolve - Class - 1
Failure to control ground water to adequately investigate and control or preven thte inflow water ito the excavation site. at time of inspection observed an active construction site with steel excavation work
Jun 7, 2018 · Penalty $625
Resolve - Class - 1
Uncapped rebars. at time of inspection observed an active constructionsite with steel and excavation work in progress,during inspection noted has doing footing and foundation walls for a new shopping wall and
Jun 7, 2018 · Penalty $2,500
Resolve - Class - 1
Cease use b154,51 paloma tankless water heater model no.ph-28 gas fired 199,000 btu observed corroded flue vent from the hot water heater in the boiler room to the outside.heat until such is removed by dob
Nov 3, 2017 · Penalty $2,500
Resolve - Class - 2
Bc3310.6 failure to have disignated ssm as per code pwl shows ssm to be william bellini ssm#1413.ssm#2249 john campbell has been on site since 10/2/17.rem:designate ssm as per code
Oct 18, 2017 · Penalty $400
Resolve - Class - 2
Contrary to site safety plan noticed at time of inspection ssp shows bldg at 2630 hylan blvd,demo of bldg e has begun and was partially demolished.rem:stop all work amend ssp.
Oct 18, 2017 · Penalty $250
Resolve - Class - 2
Contrary to site safety plan.noticed @time of inspection dm in progress commencement of demo on 10/9/17 in dob system. ssp shows sequence tostart at bldg a 2630 hylan blvd &goes from these to bldg d 109 mill rd
Oct 18, 2017 · Penalty $250
Resolve - Class - 2
Contrary to site safety plan,noticed @ time of inspection demo in pro gress,notice commencement of demo on 10/9/17,in dob system.ssp shows demo to begin @ bldg a 2630 hylan before commencement of bldg c 107 miu
Oct 18, 2017 · Penalty $250
Resolve - Class - 2
Contrary to approved site safety plan.noticed @time of insp dm in progress.noticed demolition commencement 10/9/17 in dob system noticed sspstates bldg @ 2630 hylan blvd should be demolished first prior to any
Oct 18, 2017 · Penalty $250
Resolve - Class - 2
Contrary to approved site safety plan noticed @ time of inspection dm in progress noticed ssp states bldg a(2630 hylan blvd)should be demolished before demo begins at bldg e(123 mill rd)bldg e has been partiall
Oct 18, 2017 · Penalty $250
Resolve - Class - 1
Bc33035.1 failure to remove combustible material prior to hot works operation.noticed at time of inspection incident, workers welding out steel 100ft volts to be demolished,when sparks sprinkler down onto combu
Oct 18, 2017 · Penalty $1,600
Resolve - Class - 2
Work does not conform to approved construction documents &/or approvedamendments. premises under alt 2 job#520222884 loc folder obj: plan does not indicate gas connection line details for connection gas line to
Nov 2, 2016 · Penalty $500
Resolve - Class - 2
Failure to provide required sign - upon inspection noted in this active demolition site, contractor's sign and the sign w/the statement, "toanonymously report unsafe conditions at this work site. that endanger
Mar 13, 2012
Resolve - Class - 1
Work does not conform to approved plan - upon inspection demo work of commercial bldg in progress. at time of inspection noted, chain link fence has been provided in exps 1 & 4 of the job site which is not in
Mar 13, 2012 · Penalty $250
Resolve - Class - 3
Sec. zr36-56. required screening such as densely planted shrubs/trees or 6' opaque fencing has not been provided at all adjoining lots in residence districts - including such zoning lots situated across a
Jun 18, 2009 · Penalty $300
Resolve - Non-hazardous
Work w/o a permit. noted:large community antenna approx 70'tall was installed at the north/east section of lot at alleyway for delivery. base of antenna is in an enclosure (chain link fence)all work 100% comple
Feb 17, 2007 · Penalty $500
Resolve - Non-hazardous
New bldg occupied w/o a valid c of o according to dob records temp c of o issued 7/25/58- no permanent c of o of record. remedy: obtain valid c of o.
Nov 4, 2006 · Penalty $700
Resolve - Non-hazardous
Failure to maintain: in that the rear paved lot is not being utilized for its intended use, and is being used for the storage of metal con- tainers (approx 8'x 40'x 10') used for storage. remedy: obtain approv-
Mar 8, 1999 · Penalty $350
Resolve