roofy

2301 Hylan Boulevard

Staten Island, NY 10306BBL 5-03616-0005Map

Owner of record: 2301, INC

2301 Hylan Boulevard is an office building built in 1965 in Staten Island, 10306. The owner of record is 2301, INC. HPD has recorded 22 housing violations here, most recently on September 16, 2022. 2 of the 22 most recent violations are still open.

HPD violations
22
DOB violations
23
ECB violations
9
HPD complaints
2

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Sep 16, 2022

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 22

  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 3rd room from east at south located at apt ph, 1st story, 1st apartment from south at west

    Sep 16, 2022 · Apt PH

    Closed — Violation closed
  • B

    Replace with new the missing handrail at interior stair leading to cellar story located at apt ph, 1st story, 1st apartment from south at west

    Sep 16, 2022 · Apt PH

    Closed — Violation closed
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at east exterior wall at rear yard , 1st story

    Sep 16, 2022

    Closed — Violation closed
  • B

    Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections watercloset and washbasin at cellar

    Sep 16, 2022

    Open — Not complied with
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 2nd kitchen from east at south located at apt ph, 1st story, 1st apartment from south at west

    Sep 16, 2022 · Apt PH

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 2nd room from east at center located at apt ph, 1st story, 1st apartment from south at west

    Sep 16, 2022 · Apt PH

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 2nd bathroom from east at north located at apt ph, 1st story, 1st apartment from south at west

    Sep 16, 2022 · Apt PH

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Jun 9, 2022

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... , approximately 2 sq ft. at ceiling in the bathroom located at apt ph, 1st story, 1st apartment from south at west

    Jun 2, 2022 · Apt PH

    Closed — Violation closed
  • C

    Remove the illegal double cylinder key operated locking device at door at apartment entrance located at apt ph, 1st story, 1st apartment from south at west

    Jun 2, 2022 · Apt PH

    Closed — Violation closed
Show 12 more ↓
  • A

    Replace with new the broken or defective ventilation cover at ceiling in the kitchen located at apt ph, 1st story, 1st apartment from south at west

    Jun 2, 2022 · Apt PH

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the bathroom located at apt ph, 1st story, 1st apartment from south at west

    Jun 2, 2022 · Apt PH

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 3rd room from north at east located at apt ph, 1st story, 1st apartment from south at west

    Jun 2, 2022 · Apt PH

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt ph, 1st story, 1st apartment from south at west

    Jun 2, 2022 · Apt PH

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling in the 3rd room from north at east located at apt ph, 1st story, 1st apartment from south at west

    Jun 2, 2022 · Apt PH

    Closed — Violation closed
  • B

    Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections to wash basin and water closet at cellar

    Jun 2, 2022

    Open — Not complied with
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling in the 2nd room from east at north located at apt ph, 1st story

    Aug 28, 2018 · Apt PH

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department ceiling in the 1st room from east at north located at apt ph, 1st story, 1st apartment from south at west

    Aug 28, 2018 · Apt PH

    Closed — Violation closed
  • B

    Properly repair the broken or defective mechanical ventilation system in the bathroom located at apt ph, 1st story

    Aug 13, 2018 · Apt PH

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in uniform color the south wall in the bathroom located at apt ph, 1st story

    Aug 13, 2018 · Apt PH

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak at ceiling in the 2nd room from east at north located at apt ph, 1st story

    Mar 6, 2018 · Apt PH

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling in the 2nd room from east at north located at apt ph, 1st story

    Mar 6, 2018 · Apt PH

    Closed — Violation closed

DOB building violations · 23

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
Show 13 more ↓
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 4, 1993

    Dob violation - dismissed

ECB violations · 9

  • Class - 2

    Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. no certificate of correction on file for vio#39073774y as of 4/7/26., file a certificate of

    Apr 7, 2026 · Penalty $6,250

    Active
  • Class - 2

    Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. no certificate of correction on file for vio#39073775x as of 4/7/2026,, file a certificate o

    Apr 7, 2026 · Penalty $6,250

    Active
  • Class - 2

    No certificate of correction of file for class 1 occupancy contrary violation 039073774y. cellar classified as ordinary use on c of o 9992, however during inspection on 11/12/22 space was being used as a dwelli

    Mar 26, 2025 · Penalty $1,250

    Active
  • Class - 1

    No certificate of correction on file for class 1 work without a permit violation 039073775x. violation issued on 11/12/22 for creating full height partitions to create rooms, and 2 piece bathroom. water and was

    Mar 26, 2025 · Penalty $2,500

    Active
  • Class - 1

    Occupancy contrary to that allowed by dob records. c of o # 9992 indicates cellar for ordinary use however at time of inspection i observed the cellar has been converted and occupied as a sleeping quarters, wit

    Nov 12, 2022 · Penalty $12,500

    Active
  • Class - 1

    Work w/o permit. at time of inspection i observed at cellar level, erected full height partitions for creating (2) rooms and bathroom. also installed water line and waste line for bathroom 2pc. also installed e

    Nov 12, 2022 · Penalty $12,500

    Active
  • Class - 2

    Occupancy contrary to that allowed by cofo and/or dept of building records.partition erected creating illegal use of rooms for living at cellar in conjunction with 1st floor apartment.full bath present with was

    Jun 2, 2022 · Penalty $6,250

    Active
  • Non-hazardous

    Occupancy contrary to bldg dept records - noted dob records indicate cof o #9992 bldg to be occupied as a legal 1 family dwelling,now being occupied as office for designing.remedy:discontinue illegal use or ame

    May 17, 2007 · Penalty $400

    Active
  • Non-hazardous

    19b-4a-36. 49a-install 909 back flow prcventor on boiler weter feed line.

    Aug 1, 2001 · Penalty $250

    Active

Complaints

  • Paint/plaster

    Wall

    Sep 6, 2018 · Apt PH

    Close
  • Paint/plaster

    Wall

    Aug 27, 2018 · Apt PH

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Office building (O7)
Year built
1965
Floors
1
Residential units
—
Building area
1,081 ft²
Lot area
4,094 ft²
Zoning
R3X
Community board
502
Council district
50
Block / lot
3616 / 5
Assessed value
$97,200
Landmark / historic district
No

HPD registration #17479, last renewed Oct 17, 2025.

Questions about 2301 Hylan Boulevard

Who owns 2301 Hylan Boulevard?

The owner of record in NYC Department of City Planning PLUTO data is 2301, INC.

Does 2301 Hylan Boulevard have violations?

Yes. NYC HPD has recorded 22 housing violations at this property.

Is 2301 Hylan Boulevard rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 2301 Hylan Boulevard built?

City records list 1965 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.