Violations at 1700 Richmond Road
Staten Island, NY 10306 · BBL 5-03532-0500 · Back to the property
HPD housing violations
No HPD violations on record
DOB building violations
39 DOB violations, newest first.
- Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)
Jun 23, 2024
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2022
Apr 22, 2023
Dob violation - dismissed - Nycha elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Dec 17, 2021
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Sep 27, 2013
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Dec 28, 2012
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Dec 28, 2012
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 18, 1995
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Jul 18, 1995
Vp-violation unserved ecb-active - Elevator elevatorrequired
E-elevator elevatorrequired
May 7, 1993
Vp*-violation unserved ecb- dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 7, 1993
Vp*-violation unserved ecb- dismissed - Elevator elevatoroptional
1
Apr 7, 1992
Dob violation - dismissed - Elevator elevatoroptional
5
Apr 7, 1992
Dob violation - dismissed - Elevator elevatoroptional
2
Jun 29, 1990
Dob violation - dismissed
ECB violations
18 ECB violations, newest first.
- Class - 1
Failure to safeguard persons and property affected by construction operations appl#540040864 noted unsafe condition of roof level by the placement of ladder withinin 3'of leading edge,ladder not tied to buildin
Jun 23, 2015 · Penalty $2,400
Resolve - Class - 1
Failure to maintain building noted improper storage of combustible material apprx 50 gallons of fuel stored in shipping container (unapproved) rmdy: comply with code.
Jun 23, 2015 · Penalty $1,000
Resolve - Class - 1
3314.5.5 supported scaffold does not meet bldg code sepcs,stop all work.noted:@time of insp work platform was not fully planked nor was it secure to the frames/tied down.rem:stop all work,comply w/code,far dept
Jun 23, 2015 · Penalty $1,600
Resolve - Class - 1
3310.10.2 osha card/training.noted:@time of insp workers on site w/fake training acrd/fraudulent card gc failed to ensure workers met minimum requirements.no training/ osha.rem:comply w/code.
Jun 23, 2015 · Penalty $1,600
Resolve - Class - 1
3314.8 supported scaffold does not meet bldg code specifications.stop all work noted:@time of insp guardrail system for pipe scaffold was inadequate,the following items was missing (1)toeboard (2)mid & top rail
Jun 23, 2015 · Penalty $1,600
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/ code provisions periodic insp of exterior walls and appurtenances as required by article 28.302 and the dob rules and regulations rem:
Oct 20, 2010
Resolve - Class - 3
21a 50abc 50a-missing section of exterior insulation on drum 50b-remove all storage from boiler room 50c-remove all flammable from boiler room
Sep 16, 2010
Resolve - Class - 3
21a 50abc 50a-missing section of exterior insulation on drum 50b-remove all storage from boiler room 50c-remove all flammable from boiler room
Sep 16, 2010
Resolve - Class - 3
21a 50abc 50a-missing section of exterior insulation on drum 50b-remove all storage from boiler room 50c-remove all flammable from boiler room
Sep 16, 2010
Resolve - Class - 2
Failure to file an acceptable 6th round technical report in compliancew/code provisions: periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules and regulations.
Jun 4, 2010
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 & the dob rules and regulations
Mar 27, 2009
Resolve - Non-hazardous
Failure to submit a fifth round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenancesas required by local law 11 of 1998 & the dept of bldgs rules & regul-
Nov 30, 2005
Resolve - Non-hazardous
Failure to submit a 5th round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by local law 11 of 1998 & the dept of buildings rules & regul
Aug 12, 2005
Resolve - Non-hazardous
Failure to submit a 5th round technical report in compliance with code provisions:periodic inspection of exterior walls & appurtenances as required by local law 11 of 1998 & the department of buildings rules &
Mar 18, 2005
Resolve - Non-hazardous
Failure to submit a 5th round technical report: periodic insp of exterior walls & apprutenances as required by local law 11/98 & the d.o.b, rules & regulations remedy: file the required report to the d.o.b. st
Aug 20, 2004
Resolve - Hazardous
Failure to maintain exterior of building facades issues. 1)extensive spalling, cracks and expose rebars in concrete roof over hang on the north/east and south/west elevation. 2)loosen metal clad coping around
Mar 25, 2003
Resolve - Non-hazardous
Operation o fplubic assembly withou t a current permit for p/a 27/96 which is being used as community center in basement remedy obtain current p/a permit
Jul 7, 1999
Resolve - Non-hazardous
Operation of public assembly without a current public assembly permit for senior citizen in basement rear bldg. remedy: obtain valid p/a permit.
Jun 19, 1997 · Penalty $500
Active