roofy

Violations at 390 Maryland Avenue

Staten Island, NY 10305 · BBL 5-02986-0012 · Back to the property

HPD housing violations

The newest 50 of 82 HPD violations. The city keeps the complete history.

  • ANon-hazardous

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Jul 31, 2026

    Open — Nov sent out
  • ANon-hazardous

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story

    Jul 31, 2026

    Open — Nov sent out
  • CImmediately hazardous

    M/d law abate the nuisance consisting of scalding hot water above 130 degrees in the entire apartment located at apt 3b, 3rd story, 1st apartment from east at south

    Jan 26, 2026 · Apt 3B

    Open — Nov sent out
  • BHazardous

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that is defective in the entire apartment located at apt 3b, 3rd story, 1st apartment from east at south

    Jan 26, 2026 · Apt 3B

    Open — Nov sent out
  • BHazardous

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is defective in the entire apartment located at apt 3b, 3rd story, 1st apartment from east at south

    Jan 26, 2026 · Apt 3B

    Open — Nov sent out
  • CImmediately hazardous

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system [ missing notice ] at public hall, 1st story

    Jan 26, 2026

    Open — Nov sent out
  • CImmediately hazardous

    Provide ready access to buildings heating system door locked at cellar at boiler room

    Jan 26, 2026

    Open — Nov sent out
  • CImmediately hazardous

    M/d law abate the nuisance consisting of scalding hot water above 130 degrees in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east

    Jan 26, 2026 · Apt 3A

    Closed — Violation closed
  • CImmediately hazardous

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east

    Jan 26, 2026 · Apt 3A

    Open — Nov sent out
  • ANon-hazardous

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Dec 17, 2025

    Open — Nov sent out
  • ANon-hazardous

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Dec 17, 2025

    Open — Nov sent out
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east

    Dec 17, 2025 · Apt 3A

    Open — Notice of issuance sent to tenant
  • BHazardous

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east

    Dec 17, 2025 · Apt 3A

    Open — Nov sent out
  • BHazardous

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east

    Dec 17, 2025 · Apt 3A

    Open — Nov sent out
  • BHazardous

    Properly secure the loose metal cover on baseboard radiator at north wall in the 2nd room from east located at apt 3a, 3rd story, 1st apartment from north at east

    Dec 17, 2025 · Apt 3A

    Open — Nov sent out
  • CImmediately hazardous

    M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hot water fixtures in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east

    Dec 17, 2025 · Apt 3A

    Closed — Violation closed
  • ANon-hazardous

    Replace with new the missing safety caps at electrical outlet at west wall at public hall, 1st story

    Dec 13, 2025

    Open — Nov sent out
  • CImmediately hazardous

    Properly repair with similar material the broken or defective concrete facade at 3rd story at building east at east yard

    Dec 13, 2025

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east located at apt 3a, 3rd story, 1st apartment from north at east

    Dec 13, 2025 · Apt 3A

    Open — Nov sent out
  • BHazardous

    Repair the leaky and/or defective faucets at bathtub in the 1st bathroom from east located at apt 3a, 3rd story, 1st apartment from north at east

    Dec 13, 2025 · Apt 3A

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 5th room from east located at apt 3a, 3rd story, 1st apartment from north at east

    Dec 13, 2025 · Apt 3A

    Open — Nov sent out
  • BHazardous

    Repair the roof so that it will not leak over the ceiling in the 5th room from east located at apt 3a, 3rd story, 1st apartment from north at east

    Dec 13, 2025 · Apt 3A

    Open — Nov sent out
  • BHazardous

    Repair the roof so that it will not leak over the ceiling in the foyer located at apt 3a, 3rd story, 1st apartment from north at east

    Dec 13, 2025 · Apt 3A

    Open — Nov sent out
  • BHazardous

    Provide adequate supply of cold water for the fixtures at sink in the kitchen located at apt 3a, 3rd story, 1st apartment from north at east

    Dec 13, 2025 · Apt 3A

    Open — Nov sent out
  • BHazardous

    Provide adequate supply of hot water for the fixtures at sink in the kitchen located at apt 3a, 3rd story, 1st apartment from north at east

    Dec 13, 2025 · Apt 3A

    Open — Nov sent out
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges at secondary egress door at west in the kitchen located at apt 3a, 3rd story, 1st apartment from north at east

    Dec 13, 2025 · Apt 3A

    Open — Nov sent out
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east

    Dec 13, 2025 · Apt 3A

    Open — Notice of issuance sent to tenant
  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Aug 10, 2025

    Open — Nov sent out
  • ANon-hazardous

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Aug 10, 2025

    Open — Nov sent out
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1b, 1st story, 1st apartment from west at north

    Aug 10, 2025 · Apt 1B

    Closed — Violation closed
  • BHazardous

    Refit lower and upper sashes at 2nd window from west at north wall in the kitchen located at apt 3a, 3rd story, 1st apartment from north at east

    Feb 20, 2025 · Apt 3A

    Open — Nov sent out
  • BHazardous

    Refit lower and upper sashes at 1st window from west at north wall in the kitchen located at apt 3a, 3rd story, 1st apartment from north at east

    Feb 20, 2025 · Apt 3A

    Open — Nov sent out
  • CImmediately hazardous

    M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130degrees at all hot water fixture in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east

    Feb 20, 2025 · Apt 3A

    Closed — Violation closed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective at entrance (defective hinges) in the entrance located at apt 1d, 1st story, 1st apartment from west at north

    Feb 16, 2025 · Apt 1D

    Open — Nov sent out
  • ANon-hazardous

    Paint or post a sign indicating floors missing at public hall

    May 20, 2024

    Open — Nov sent out
  • ANon-hazardous

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    May 20, 2024

    Open — Nov sent out
  • ANon-hazardous

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ( frame missing ) at public hall, 1st story

    May 8, 2023

    Open — Nov sent out
  • CImmediately hazardous

    M/d law abate the nuisance consisting of hot water exceeding the maximum allowable temperature of 130 degree. at hot water fixtures in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east

    Feb 28, 2023 · Apt 1A

    Closed — Violation closed
  • CImmediately hazardous

    Provide ready access to buildings heating system door locked to cellar at public hall, 1st story

    Feb 28, 2023

    Open — Nov sent out
  • CImmediately hazardous

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east

    Feb 28, 2023 · Apt 1A

    Closed — Violation closed
  • CImmediately hazardous

    M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at hot water fixtures in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south

    Feb 23, 2023 · Apt 1A

    Closed — Violation closed
  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Jan 30, 2023

    Open — Nov sent out
  • ANon-hazardous

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box (missing notice) at public hall, 1st story

    Jan 30, 2023

    Open — Nov sent out
  • ANon-hazardous

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Jan 30, 2023

    Open — Nov sent out
  • CImmediately hazardous

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 8, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south

    Jan 30, 2023 · Apt 1A

    Open — Nov sent out
  • BHazardous

    Provide adequate supply of hot water for the fixtures at sink in the kitchen located at apt 1a, 1st story, 1st apartment from east at south

    Jan 30, 2023 · Apt 1A

    Open — Nov sent out
  • CImmediately hazardous

    M/d law abate the nuisance consisting of hot water exceeding maximum allowable temperature of 130 degrees in the kitchen located at apt 1a, 1st story, 1st apartment from east at south

    Jan 30, 2023 · Apt 1A

    Closed — Violation closed
  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Oct 11, 2022

    Closed — Violation dismissed
  • ANon-hazardous

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Oct 11, 2022

    Closed — Violation dismissed
  • ANon-hazardous

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ( notice missing ) at public hall, 1st story

    Oct 11, 2022

    Closed — Violation dismissed

DOB building violations

The newest 50 of 64 DOB violations. The city keeps the complete history.

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2018)

    Jun 18, 2021

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2018)

    Mar 18, 2019

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2016

    Feb 16, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 6, 2014

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 15, 2014

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 3, 2013

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2012

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed

ECB violations

20 ECB violations, newest first.

  • Class - 2

    Failure to comply with commissioner's order contained in summons #39070460h issued on 09/20/2022, and failure to file a certificate of correction pursuant to 28.201.1 and 1 rcny 102-01(d)(2). an acceptable cert

    Jan 8, 2025 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply with commissioner's order contained in summons #39070459k issued on 09/20/2022, and failure to file a certificate of correction pursuant to 28.201.1 and 1 rcny 102-01(d)(2). an acceptable cert

    Jan 8, 2025 · Penalty $1,250

    Resolve
  • Class - 2

    Observed in basement installed gas valves and gas piping to five commercial gas dryers all work completed no permits on file, obtain all permits

    Aug 20, 2024 · Penalty $1,250

    Active
  • Class - 1

    At time of inspection, observation was made at exposure 1 and 2 of premises a completed pool approximately 20ft by 20ft by 5ft in depth. occupied building and c of o # 46613 shows 42 apt units,no exterior pool.

    Dec 12, 2022

    Resolve
  • Class - 1

    At time of inspection, observed at exposure 1 and 2 of building# 400 a pool approximately 20ft by 20ft by 5ft in depth. pool consist of steps. labeling, and cover. no permit or plans on file for excavation or a

    Dec 12, 2022

    Resolve
  • Class - 2

    Boiler not registeredboiler model-tr60.

    Sep 20, 2022 · Penalty $625

    Active
  • Class - 2

    Boiler not registered. slantfin-model-tr60.

    Sep 20, 2022 · Penalty $625

    Active
  • Class - 2

    At time of inspection observed interior wall instate of disrepair condition with several cracks in various locations apt 1d. observed crack lines on bath, kitchen & living room wall & ceiling. also flooring has

    Oct 15, 2021

    Resolve
  • Class - 2

    B265.as per class 2 b265 28-303.7 failure to file a complete boiler inspection report as per dob records.submit a current bo-9 correct all violating conditions & submit the cert of correction

    May 27, 2016 · Penalty $2,500

    Active
  • Class - 1

    B101. found 275 gallon oil tank installed w/o nyc dob work permit.

    Nov 13, 2012 · Penalty $1,600

    Resolve
  • Class - 2

    B254, 15, 21a, 32a, 36, 40, 50, 50a, 50b, 50c. 50: boiler room not fireproof. 50a: # 3 boiler needs cleaning. 50b: missing shut off valve onoil pressure gauge. 50c: debris in boiler room.

    May 4, 2010 · Penalty $250

    Resolve
  • Non-hazardous

    27-127 50e 50f 50g 50h b4a 21a 32a 38 40 50b 16 24b 32b 39 50a 50c 50awrong size backflow preventer 50b no check valves 50c missing control covers 50d flow controls rotted & leaking 50e (heater) piping rotted

    May 28, 2008 · Penalty $180

    Resolve
  • Non-hazardous

    27-127 50d 50e 50f b4f 21a 32a 38 40 50b 16 24b 32b 39 50a 50c 50a remove all storage from back room 50b remove all flamables 50c no check valve 50d circulate motor improply supported 50e oil pump to be

    May 28, 2008 · Penalty $180

    Resolve
  • Non-hazardous

    50d,50e,50f b4a,21a,32a,38,40,50b,16,24b,32b,39,50a,50c 50a remove allstorage from boiler room 50b-remove all flammables 50c-no check valves50d-circulate motor improperly supported 50e-oil pump to be

    May 28, 2008 · Penalty $180

    Resolve
  • Non-hazardous

    27-127 50e 50f 50g b4a 21a 32a 39 50a 50c 16 24b 38 40 50b 50d 50a missing control covers 50b open contains of fuel oil 50c no backflow 50d no clock valve 50e move oil pump to floor 50f remove all storage from

    May 28, 2008 · Penalty $350

    Resolve
  • Non-hazardous

    B4a21a32a3950a50b50c50d50e50f50g50h50i50j50k50l50m1624b3840. 50a oil leaks at burners 50b no backflow. 50c open contractors of fuel oil. 50dcheck valve 50e boiler feed valve broken 50f remove all flammable from

    May 28, 2008 · Penalty $350

    Resolve
  • Non-hazardous

    49a/49b/49c. a) rating plate on boiler is missing hydrotherm boiler oil fired. b) install back flow or chech valve on boiler cold water feed line.

    Apr 16, 2002

    Resolve
  • Non-hazardous

    49a/49b. a0 rating plate on boiler missing hydratherm oil fired boiler b0 remove the valve located between the boiler and the relief valve.

    Apr 16, 2002

    Resolve
  • Non-hazardous

    49a no rating plate on boiler hydratherm boildr oil fired.

    Apr 16, 2002

    Resolve
  • Non-hazardous

    No rating plate on boiler hydrotherm boiler oil fired.

    Apr 16, 2002

    Resolve