roofy

Violations at 389 Britton Avenue

Staten Island, NY 10304 · BBL 5-02891-0021 · Back to the property

HPD housing violations

25 HPD violations, newest first.

  • BHazardous

    Properly secure the loose metal hand rail at west at stairs at building front

    Oct 5, 2026

    Open — Nov sent out
  • ANon-hazardous

    Properly secure the loose metal hand rail at west wall at stairs in between upper and lower level , 1st story

    Oct 5, 2026

    Open — Nov sent out
  • BHazardous

    Trace and repair the source and abate the visible mold condition... more than 10 sq ft observed at window recess at east in the bathroom located at apt 2, 2nd story, 1st apartment from east at south

    Oct 5, 2026 · Apt 2

    Open — Notice of issuance sent to tenant
  • ANon-hazardous

    Properly repair with similar material the broken or defective regrout around bathtub in the bathroom located at apt 2, 2nd story, 1st apartment from east at south

    Oct 5, 2026 · Apt 2

    Open — Nov sent out
  • ANon-hazardous

    Reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom located at apt 2, 2nd story, 1st apartment from east at south

    Oct 5, 2026 · Apt 2

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective shut-off knob at radiator at north wall in the 1st room from north located at apt 2, 2nd story, 1st apartment from east at south

    Oct 5, 2026 · Apt 2

    Open — Nov sent out
  • BHazardous

    Properly secure the loose metal hand rail at west in the private hallway located at apt 2, 2nd story, 1st apartment from east at south

    Oct 5, 2026 · Apt 2

    Open — Nov sent out
  • BHazardous

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Oct 5, 2026 · Apt 2

    Open — Nov sent out
  • BHazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Oct 5, 2026 · Apt 2

    Open — Nov sent out
  • BHazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Oct 5, 2026 · Apt 2

    Open — Nov sent out
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 1, 2024

    Open — Info nov sent out
  • CImmediately hazardous

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1, 1st story, 1st apartment from east at south

    Oct 31, 2024 · Apt 1

    Closed — Violation closed
  • CImmediately hazardous

    Properly repair with similar material the broken or defective wood floor in the foyer located at apt 1, 1st story, 1st apartment from east at south

    Oct 31, 2024 · Apt 1

    Closed — Violation closed
  • BHazardous

    Properly repair or replace the broken or defective electrical light fixture at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from east at south

    Oct 31, 2024 · Apt 1

    Open — Nov sent out
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1, 1st story, 1st apartment from east at south

    Oct 31, 2024 · Apt 1

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of bedbugs in the entire apartment located at apt 2, 2nd story

    May 31, 2018 · Apt 2

    Closed — Violation dismissed
  • BHazardous

    Provide a safe and adequate supply of electric service to the fixtures at ceiling in the private hallway located at apt 2ndfl, 2nd story

    May 17, 2017 · Apt 2NDFL

    Closed — Violation closed
  • BHazardous

    Properly repair with similar material the broken or defective brick second step from the bottom at stoop

    Jan 27, 2012

    Closed — Violation closed
  • BHazardous

    Properly repair with similar material the broken or defective second step from bottom brick at stoop

    Dec 5, 2011

    Closed — Violation closed
  • CImmediately hazardous

    Remove the illegal fastening double cylinder key operated lock installed at metal gate entrance to building , 1st story

    Feb 7, 2011

    Closed — Violation closed
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2fl, 1st story

    Feb 7, 2011 · Apt 2FL

    Open — Nov sent out
  • BHazardous

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1, 1st story, apartment at north

    Dec 10, 2010 · Apt 1

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 2nd room from east located at apt 1, 1st story, apartment at north

    Dec 10, 2010 · Apt 1

    Open — Nov sent out
  • BHazardous

    Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections sink, shower,water closet at basement

    Sep 3, 2009

    Closed — Violation closed
  • ANon-hazardous

    Properly repair the broken or defective door bell in the entire apartment located at apt 1fl, 1st story

    Dec 27, 2007 · Apt 1FL

    Open — Nov sent out

DOB building violations

1 DOB violations, newest first.

  • Construction other optional

    C-construction other optional

    Aug 12, 2017

    Dob violation - active

ECB violations

3 ECB violations, newest first.

  • Class - 2

    Residence altered as dwelling for more than the number of families legally authorized by the c of o or official records. dept. of building records indicate residence legally approved for (2) families dwelling.

    Aug 12, 2017 · Penalty $1,200

    Active
  • Class - 2

    Work without permit. work noted: at cellar level; erected partition with door created bathroom. installed water and waste lines for residential sink and 3pc bathroom (sink, toilet, shower). installed electrical

    Aug 12, 2017 · Penalty $800

    Active
  • Non-hazardous

    Work does not conform to approved plans - according to nb # 5101920, at rear of bldg, bilco doors & stairs leading into cellar not illustrated on plans! no permits or approvals on file! remedy: conform to

    Dec 18, 2007 · Penalty $250

    Active