33 Steuben Street
Staten Island, NY 10304BBL 5-02882-0018Map
Owner of record: Fici, Javit
33 Steuben Street is a walk-up apartment building built in 1910 in Staten Island, 10304. It has 3 residential units across 3 floors. The owner of record is Fici, Javit. HPD has recorded 58 housing violations here, most recently on June 25, 2026. 1 of the 50 most recent violations are still open.
- HPD violations
- 58
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 20
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 58
- ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all parts, members, and balconies at fire escape at building front
Jun 25, 2026
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing kick down door stand at building entrance door , 1st story
Jun 21, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl tile at floor in the kitchen located at apt 3, 3rd story, 1st apartment from west at north
Apr 6, 2026 · Apt 3
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at south wall in the 4th room from north at east located at apt 3, 3rd story, 1st apartment from west at north
Apr 6, 2026 · Apt 3
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq ft at south wall in the 4th room from north at east located at apt 3, 3rd story, 1st apartment from west at north
Apr 6, 2026 · Apt 3
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in waste line at bathtub in the bathroom located at apt 3, 3rd story, apartment at north
Apr 6, 2026 · Apt 3
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective rotted wood baseboard at south wall in the 4th room from north at east located at apt 3, 3rd story, 1st apartment from west at north
Apr 6, 2026 · Apt 3
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective formica on countertop at base cabinet at west wall in the kitchen located at apt 3, 3rd story, 1st apartment from west at north
Apr 6, 2026 · Apt 3
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection at waste line under wash basin in the bathroom located at apt 3, 3rd story, 1st apartment from west at north
Apr 6, 2026 · Apt 3
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective counter balance for lower sash window at south wall in the 1st room from east at south located at apt 3, 3rd story, 1st apartment from north at east
May 17, 2024 · Apt 3
Closed — Violation closed
Show 40 more ↓
- CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east
May 17, 2024 · Apt 3
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east
May 17, 2024 · Apt 3
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 2nd apartment from north at east
May 10, 2024 · Apt 2
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 2nd apartment from north at east
May 10, 2024 · Apt 2
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2, 2nd story, 2nd apartment from north at east
May 10, 2024 · Apt 2
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2, 2nd story, 2nd apartment from north at east
May 10, 2024 · Apt 2
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective counter balance lower sash window at south wall in the 6th room from east located at apt 2, 2nd story, 2nd apartment from north at east
May 10, 2024 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 6th room from east located at apt 2, 2nd story, 2nd apartment from north at east
May 10, 2024 · Apt 2
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective washbasin cabinet in the bathroom located at apt 2, 2nd story, 2nd apartment from north at east
May 10, 2024 · Apt 2
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 2, 2nd story, 2nd apartment from north at east
May 10, 2024 · Apt 2
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective counter balance lower sash window in the bathroom located at apt 2, 2nd story, 2nd apartment from north at east
May 10, 2024 · Apt 2
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of household items at public hall, 3rd story
Mar 14, 2024
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at west yard
Mar 14, 2024
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in waste line under sink in the kitchen located at apt 3, 3rd story, 1st apartment from west at north
Mar 14, 2024 · Apt 3
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection at waste line under sink in the kitchen located at apt 3, 3rd story, 1st apartment from west at north
Mar 14, 2024 · Apt 3
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection at waste line under washbasin in the bathroom located at apt 3, 3rd story, 1st apartment from west at north
Mar 14, 2024 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 3, 3rd story, 1st apartment from west at north
Mar 14, 2024 · Apt 3
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective counter balance on lower sash at 1st window from north at east wall in the 3rd room from north located at apt 3, 3rd story, 1st apartment from west at north
Mar 14, 2024 · Apt 3
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Mar 14, 2024
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Mar 14, 2024
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Mar 14, 2024
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Mar 14, 2024
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Mar 14, 2024
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl tile at floor in the 4th room from north at east located at apt 3, 3rd story, 1st apartment from west at north
Mar 14, 2024 · Apt 3
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective counter balance on lower sash at 1st window from east at south wall in the 4th room from north at east located at apt 3, 3rd story, 1st apartment from west at north
Mar 14, 2024 · Apt 3
Closed — Violation dismissed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at light fixture at ceiling in the 4th room from north at west located at apt 3, 3rd story, 1st apartment from west at north
Mar 14, 2024 · Apt 3
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling in the 4th room from north at west located at apt 3, 3rd story, 1st apartment from west at north
Mar 14, 2024 · Apt 3
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective counter balance at lower sash on window at south wall in the 4th room from north at west located at apt 3, 3rd story, 1st apartment from west at north
Mar 14, 2024 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north
Mar 14, 2024 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130degrees at all hot water fixture in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north
Mar 14, 2024 · Apt 3
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north
Mar 14, 2024 · Apt 3
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north
Mar 14, 2024 · Apt 3
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl tile at floor in the kitchen located at apt 3, 3rd story, 1st apartment from west at north
Mar 14, 2024 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective inner glass pane on lower sash window at south wall in the 4th room from north at west located at apt 3, 3rd story, 1st apartment from west at north
Mar 14, 2024 · Apt 3
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling in the 3rd room from north located at apt 3, 3rd story, 1st apartment from west at north
Mar 14, 2024 · Apt 3
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx 8 sq ft at ceiling in the 3rd room from north located at apt 3, 3rd story, 1st apartment from west at north
Mar 14, 2024 · Apt 3
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 29, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 16, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 8, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 8, 2022
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Flooring/stairs
Floor
Mar 31, 2026 · Apt 3
Close - Plumbing
Basin/sink
Mar 31, 2026 · Apt 3
Close - Water leak
Slow leak
Mar 31, 2026 · Apt 3
Close - Plumbing
Basin/sink
Mar 31, 2026 · Apt 3
Close - Electric
No lighting
May 14, 2024 · Apt 3
Close - Door/window
Window frame
May 14, 2024 · Apt 3
Close - Flooring/stairs
Floor
May 14, 2024 · Apt 3
Close - Unsanitary condition
Pests
May 14, 2024 · Apt 3
Close - Plumbing
Water supply
May 14, 2024 · Apt 3
Close - Door/window
Window pane
Apr 22, 2024 · Apt 2
Close
Show 10 more ↓
- Door/window
Window pane
Apr 22, 2024 · Apt 2
Close - Appliance
Refrigerator
Apr 22, 2024 · Apt 2
Close - Water leak
Slow leak
Apr 22, 2024 · Apt 2
Close - Electric
Lighting
Mar 5, 2024 · Apt 3
Close - Water leak
Slow leak
Mar 5, 2024 · Apt 3
Close - Door/window
Window pane
Mar 5, 2024 · Apt 3
Close - Flooring/stairs
Floor
Mar 5, 2024 · Apt 3
Close - Plumbing
Water supply
Mar 5, 2024 · Apt 3
Close - Unsanitary condition
Garbage/recycling storage
Nov 10, 2023 · Apt BLDG
Close - Electric
Electric-supply
May 4, 2007 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1910
- Floors
- 3
- Residential units
- 3
- Building area
- 2,932 ft²
- Lot area
- 7,125 ft²
- Zoning
- R3A
- Community board
- 501
- Council district
- 49
- Block / lot
- 2882 / 18
- Assessed value
- $40,740
- Landmark / historic district
- No
HPD registration #500054, last renewed Oct 20, 2025.
Questions about 33 Steuben Street
Who owns 33 Steuben Street?
The owner of record in NYC Department of City Planning PLUTO data is Fici, Javit.
Does 33 Steuben Street have violations?
Yes. NYC HPD has recorded 58 housing violations at this property.
Is 33 Steuben Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 33 Steuben Street built?
City records list 1910 as the year it was built.
How many apartments are in 33 Steuben Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.