Violations at 1331 Bay Street
Staten Island, NY 10305 · BBL 5-02832-0017 · Back to the property
HPD housing violations
The newest 50 of 206 HPD violations. The city keeps the complete history.
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall and ceiling in the foyer located at apt 610, 6th story, 5th apartment from north at east
Oct 21, 2026 · Apt 610
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over the ceiling in the foyer located at apt 610, 6th story, 5th apartment from north at east
Oct 21, 2026 · Apt 610
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of painted sprinkler head at west wall in the 3rd room from north located at apt 610, 6th story, 5th apartment from north at east
Oct 21, 2026 · Apt 610
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt 610, 6th story, 5th apartment from north at east
Oct 21, 2026 · Apt 610
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of painted sprinkler head at west wall in the 2nd room from north located at apt 610, 6th story, 5th apartment from north at east
Oct 21, 2026 · Apt 610
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of painted sprinkler head at north wall in the kitchen located at apt 610, 6th story, 5th apartment from north at east
Oct 21, 2026 · Apt 610
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective regrout around bathtub in the bathroom located at apt 610, 6th story, 5th apartment from north at east
Oct 21, 2026 · Apt 610
Open — Nov sent out - ANon-hazardous
Replace the broken or defective bathtub in the bathroom located at apt 610, 6th story, 5th apartment from north at east
Oct 21, 2026 · Apt 610
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in washbasin wasteline in the bathroom located at apt 610, 6th story, 5th apartment from north at east
Oct 21, 2026 · Apt 610
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in bathtub wasteline in the bathroom located at apt 610, 6th story, 5th apartment from north at east
Oct 21, 2026 · Apt 610
Open — Nov sent out - ANon-hazardous
Properly secure the loose washbasin in the bathroom located at apt 610, 6th story, 5th apartment from north at east
Oct 21, 2026 · Apt 610
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the window recess at east in the 2nd room from north located at apt 610, 6th story, 5th apartment from north at east
Oct 21, 2026 · Apt 610
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at window recess at east in the 2nd room from north located at apt 610, 6th story, 5th apartment from north at east
Oct 21, 2026 · Apt 610
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from north located at apt 610, 6th story, 5th apartment from north at east
Oct 21, 2026 · Apt 610
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak over the ceiling in the 2nd room from north located at apt 610, 6th story, 5th apartment from north at east
Oct 21, 2026 · Apt 610
Open — Nov sent out - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination at public hall, 1st story
Oct 20, 2026
Open — Nov sent out - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination at public hall, 3rd story
Oct 20, 2026
Open — Nov sent out - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination at cellar level at public hall
Oct 20, 2026
Open — Nov sent out - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination at public hall, 4th story
Oct 20, 2026
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 4th story
Oct 20, 2026
Open — Nov sent out - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination at public hall, 5th story
Oct 20, 2026
Open — Nov sent out - ANon-hazardous
Replace with new the missing safety caps at 4th electrical outlet from north at east wall at public hall, 5th story
Oct 20, 2026
Open — Nov sent out - BHazardous
Properly secure the loose radiator cover at north wall at public hall, 5th story
Oct 20, 2026
Open — Nov sent out - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination at public hall, 6th story
Oct 20, 2026
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over the ceiling at public hall, 6th story
Oct 20, 2026
Open — Nov sent out - ANon-hazardous
Remove the dirty and/or loose paper and repaper or paint to the satisfaction of this department at all walls at public hall, 6th story
Oct 20, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north located at apt 211, 2nd story, 2nd apartment from south at west
Sep 25, 2026 · Apt 211
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all ceilings and all walls in the entire apartment located at apt 211, 2nd story, 2nd apartment from south at west
Sep 25, 2026 · Apt 211
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective masonry stucco at east exterior wall at cellar level
Aug 26, 2026
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the north yard
Aug 26, 2026
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door , 1st story
Aug 26, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door , 1st story
Aug 26, 2026
Open — Violation will be reinspected - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at 3rd fire door from west at north at cellar level at public hall
Aug 26, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at 1st fire door from east at south at cellar level at public hall
Aug 26, 2026
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak ceiling at cellar level at public hall
Aug 26, 2026
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak ceiling laundry room at cellar level at public hall
Aug 26, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at 2nd fire door from west at north at cellar level at public hall
Aug 26, 2026
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak ceiling vestibule area at cellar level at public hall
Aug 26, 2026
Closed — Violation closed - ANon-hazardous
Properly repair or replace the broken or defective electrical light switch cover at north wall in the bathroom located at apt 211, 2nd story, 2nd apartment from south at west
Aug 26, 2026 · Apt 211
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor tile in the 2nd room from north located at apt 211, 2nd story, 2nd apartment from south at west
Aug 26, 2026 · Apt 211
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 211, 2nd story, 2nd apartment from south at west
Aug 26, 2026 · Apt 211
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective formica countertop in the kitchen located at apt 211, 2nd story, 2nd apartment from south at west
Aug 26, 2026 · Apt 211
Open — Not complied with - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at door in the entrance located at apt 211, 2nd story, 2nd apartment from south at west
Aug 26, 2026 · Apt 211
Closed — Violation closed - CImmediately hazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 211, 2nd story, 2nd apartment from south at west
Aug 26, 2026 · Apt 211
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective latch in the entrance located at apt 211, 2nd story, 2nd apartment from south at west
Aug 23, 2026 · Apt 211
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north located at apt 211, 2nd story, 2nd apartment from south at west
Aug 23, 2026 · Apt 211
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch in the entrance located at apt 211, 2nd story, 2nd apartment from south at west
Aug 23, 2026 · Apt 211
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot ware above 130 degrees in the entire apartment located at apt 610, 6th story, 5th apartment from north at east
Jul 31, 2026 · Apt 610
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 610, 6th story, 5th apartment from north at east
Jul 31, 2026 · Apt 610
Open — First no access to re- inspect violation - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 3rd room from north located at apt 612, 6th story, 6th apartment from north at east
Jul 26, 2026 · Apt 612
Open — Not complied with
DOB building violations
46 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 13, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 13, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 2, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 2, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 22, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 11, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 11, 2015
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 5, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 5, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 26, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 26, 2013
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 16, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 16, 2012
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 26, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 26, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 23, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 23, 2009
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 4, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 4, 2007
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 2, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 20, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 20, 2006
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Nov 19, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 21, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Feb 19, 2002
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 8, 2001
Dob violation - dismissed - Construction other optional
C-construction other optional
Sep 30, 1998
Vh*-violation hazardous dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active
ECB violations
1 ECB violations, newest first.
- Class - 2
32a/50b/50d/50y/5a/50a/50c/50e/50g/ 50a remove all storage,fresh air lovvor motor & switch imped at, 50c fire door to be of solid construction 50d mechcanical fresh air not working 50e boilers flued incorrectly
May 12, 2011 · Penalty $1,250
Resolve