Violations at 266 West Service Road
Staten Island, NY 10314 · BBL 5-02654-0045 · Back to the property
HPD housing violations
No HPD violations on record
DOB building violations
17 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 30, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 20, 2015
Dob violation - resolved - Construction other optional
Fail to main. on 11/28/14 a partial coll occured inside the steel fram ed car show rm at the svs area mezz area. a partial coll occured. the bldg has been vacated. cure: the owner is to engage a lic contr & a li c prof. to imd work with the dept to move mezz debris & to stab remain path coll inter struc. all under super of bob & contractors, p.e
Dec 2, 2014
Dob violation - dismissed - Construction other optional
Failure to maintain.partial collapse occured inside the steel framed warehouse at the service area mezzanine.the building has been. vacated and is not to be accessed without dob authorization.owner to hire 3rd party contractor to board up exdterior openings, broken windows and provide access to dob and no other access
Nov 28, 2014
Dob violation - dismissed - Construction other optional
C-construction other optional
Nov 28, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2013 inspection/test
Oct 31, 2014
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 8, 1994
Dob violation - dismissed
ECB violations
3 ECB violations, newest first.
- Class - 1
Sec. 3303.4.6 storage of combustible material & equipment. storage of combustible material & other material & equipment that may present (future) hazard shall comply w/the new york fire code. note: at the time
Mar 25, 2013 · Penalty $1,600
Resolve - Class - 2
Job site fence not constructed pursuant to subsection. note: at the time of my inspection on construction site fence in place,around site w/section missing at exp 2,3 & 4 making site excessible to the public.
Mar 25, 2013
Resolve - Non-hazardous
19b/4a/36 - spill switch is disconnected (no wiring). boiler sealed remove boxes surrounding boiler.
Oct 23, 2000 · Penalty $400
Resolve