roofy

Violations at 970 Richmond Avenue

Staten Island, NY 10314 · BBL 5-01704-0001 · Back to the property

HPD housing violations

No HPD violations on record

DOB building violations

18 DOB violations, newest first.

  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 18, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 29, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 10, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 15, 2018

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 1, 2017

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2015 inspection/test

    Dec 1, 2016

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 9, 2015

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2013 inspection/test

    Oct 31, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    Nyc police department

    Jun 4, 2014

    Dob violation - resolved
  • Construction other optional

    C-construction other optional

    Oct 30, 2012

    Dob violation - dismissed

ECB violations

11 ECB violations, newest first.

  • Class - 2

    Temporary construction equipment on site - expired permit. noted job site fence erected under job #520025419-eq-fn for new bldg under job #510030752-nb has expired 3/21/13. remedy: renew permit.

    Mar 30, 2013

    Resolve
  • Class - 2

    Failure to post/provide signs at job site pursuant to subsection. noted: new bldg under construction for job #510030752-nb w/no contractor'ssign or emergency 311 sign posted. remedy: provide contractor's sign/

    Mar 30, 2013

    Resolve
  • Class - 2

    Failure to post dot permits for street/sidewalk closing. noted: new bldg erected under job #510030752-nb w/sidewalk & street closed w/temporary walkway & no dot permits posted for temporary closure.

    Mar 30, 2013

    Resolve
  • Class - 2

    Failure to post permit. noted: construction of nb under job #510030752-nb w/o permits posted in a conspicuous place at work site. remedy: post all permits in a conspicuous location.

    Mar 30, 2013

    Resolve
  • Class - 1

    Bc3307.5.2 failure to provide flag person upon insp noted construction vehicles trucks coming in and going out from the job site through the gate located at the corner of exposure 3 &4 also noted no flag person

    May 8, 2012 · Penalty $800

    Resolve
  • Class - 1

    Bc3304.7 failure to provide safe means of egress and ingress upon insp construction work in progress at time of insp noted two holes excavated appx 80ft long 20ft wide and 12ft deep workers working in both the

    May 8, 2012 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to maintain areas used by public - upon inspection noted watercoming out from this job site flowing over the sidewalk of richmond ave in 2 places. dirty water & other waste materials making the portion

    Apr 17, 2012 · Penalty $400

    Resolve
  • Class - 1

    Sec. 3306.9.3. failure to maintain dust control system - upon inspection, construction work in progress. at time of inspection noted the entire site is dusty. thick cloud of dust created by gusty wind,vehicular

    Apr 17, 2012 · Penalty $1,600

    Resolve
  • Class - 2

    Sec. 3301.7. no design drawing - upon inspection,construction work in progress. at time of inspection noted approx 50' long 20' wide and 10'deep hole excavated,workers working inside the hole. sides of the

    Apr 17, 2012

    Resolve
  • Class - 2

    Work does not conform to approved plan upon inspection construction work in progress. at time of inspection noted the following deviations in site logistics from the approved site safety plan two new gates crea

    Dec 7, 2011 · Penalty $250

    Resolve
  • Class - 1

    Sec. 3313.1 storage and use of compressed, combustible gases w/o fdny permit - upon inspection noted: containers of oxygen and acetylene gasare fitted w/loose and nozzles and ready for use for cutting metal

    Jun 28, 2010 · Penalty $1,600

    Resolve