1326 Clove Road
Staten Island, NY 10301BBL 5-00653-0016Map
Owner of record: Singh, Amrit Pal
1326 Clove Road is an office building built in 1991 in Staten Island, 10301. It has 1 residential unit across 2 floors. The owner of record is Singh, Amrit Pal. HPD has recorded 18 housing violations here, most recently on August 25, 2014. 1 of the 18 most recent violations are still open.
- HPD violations
- 18
- DOB violations
- 12
- ECB violations
- 20
- HPD complaints
- 27
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 18
- CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 3rd room from east at south located at apt 1, 2nd story, section ''side-ent''
Aug 25, 2014 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood saddle at front side entrance door to buildong , 1st story
Aug 25, 2014
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of bedbugs located at apt 1, 1st story, apartment at south
Aug 23, 2014 · Apt 1
Closed — Violation dismissed - BHazardous
Replace with new the missing electrical outlet cover at east wall in the 1st room from east at south located at apt 1, 1st story, apartment at south
Aug 23, 2014 · Apt 1
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). which is defective located at apt 1, 1st story, apartment at south
Aug 23, 2014 · Apt 1
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 1, 2nd story, section ''side-ent''
Aug 15, 2014 · Apt 1
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). '' missing '' in the entire apartment located at apt 1, 2nd story, section ''side-ent''
Aug 15, 2014 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 3rd room from east at south located at apt 1, 2nd story, section ''side-ent''
Aug 15, 2014 · Apt 1
Closed — Violation closed - BHazardous
Provide adequate supply of hot water for the fixtures '' no volume '' at washbasin in the 2nd bathroom from east at north located at apt 1, 2nd story, section ''side-ent''
Aug 15, 2014 · Apt 1
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles floor in the bathroom located at apt 1, 2nd story, section ''side-ent''
Aug 15, 2014 · Apt 1
Closed — Violation dismissed
Show 8 more ↓
- ANon-hazardous
Replace with new the missing vent-cover at ceiling in the bathroom located at apt 1, 2nd story, section ''side-ent''
Aug 15, 2014 · Apt 1
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the east wall in the kitchen located at apt 1, 2nd story, section ''side-ent''
Aug 15, 2014 · Apt 1
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective ( 2 ) rear burners at electric range in the kitchen located at apt 1, 2nd story, section ''side-ent''
Aug 15, 2014 · Apt 1
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective inoperative light fixture at ceiling in the private hallway located at apt 1, 2nd story, section ''side-ent''
Aug 15, 2014 · Apt 1
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective crack glass pane at upper sash south window in the 3rd room from east at south located at apt 1, 2nd story, section ''side-ent''
Aug 15, 2014 · Apt 1
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection the wasteline under sink in the kitchen located at apt 1, 2nd story, section ''side-ent''
Aug 15, 2014 · Apt 1
Closed — Violation dismissed - BHazardous
Replace with new the missing cover-plate at electrical outlet at lower east wall in the 1st room from east located at apt 1, 2nd story, section ''side-ent''
Aug 15, 2014 · Apt 1
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of bedbugs in the entire apartment located at apt 1, 2nd story, section ''side-ent''
Aug 15, 2014 · Apt 1
Closed — Violation dismissed
DOB building violations · 12
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 28, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 28, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 10, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 26, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 26, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 28, 2017
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed
Show 2 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 4, 1993
Dob violation - dismissed
ECB violations · 20
- Class - 2
Burnham-422 boiler. missing spill switch. correct violating conditions and sumit a certificate of correction.
Aug 8, 2023 · Penalty $3,125
Active - Class - 1
Continued work while on swo. changed windows, completed work on roof with sheathing and shingles. violation issued for violating swo., comply with stop work order
Jun 1, 2023 · Penalty $5,000
Resolve - Class - 1
Without any permits, the roof has been stripped down to bare rafters, front wall stripped to sheathing, front shed roof removed and various electrical devices removed leaving exposed wires and bx cable. violati
Jan 27, 2023 · Penalty $2,500
Resolve - Class - 2
Construction
Aug 10, 2018
Resolve - Class - 2
Failure to comply w/comm's order contained in summ/vio#35293722l issue on 10/11/17 and to file a cofc pursuant to 28-201.1 and 1rcny 102-01.use of unapproved plumbing.rem;comply w/ comm's order and file a cofc
Jun 29, 2018 · Penalty $1,562
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35293722l issued on 10-11-17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for unapproved plumbing material used at boiler room on hot wat
Apr 27, 2018 · Penalty $625
Resolve - Class - 2
Failure to comply w/comm's order contained in summ/viol#35293722l issdon 10/11/17 and to file a cofc pursuant to 28-201.1 abd 1rcny 102-01. unapproved materials used for hot water heater installation in boiler
Mar 8, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation #35293722l issued on 10/11/17 and to file a certificate of correction pursuant to 28-201.1.1 and 1rcny 102-01.for failing to file a
Dec 19, 2017 · Penalty $2,000
Resolve - Class - 1
Work w/o a permit. failure to comply w/the comm's order contained in summons/vio#35250891m issued on 04/27/17 & to file a c of c pursuant to28-201.1 & 1rcny 102-01. interior plumbing work. remedy: comply w/comm
Nov 9, 2017
Resolve - Class - 1
27 misc;28misc bc misc.misc vio.use of unapproved plumbing material.observed in boiler room hot water heater installed w/(pro-pex) copper fittings which is not approved for this type of installation.summons #35
Oct 11, 2017 · Penalty $250
Resolve
Show 10 more ↓
- Class - 1
Failure to comply w/the comm's order contained in summons/vio#35250891m issued on 04/27/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. in boiler room,newly installed gas hot water heater w/water con
Sep 28, 2017
Resolve - Class - 2
Failure to comply w/the comm's order contained in sum/vio#35250892y issued on 04/27/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. note: no document file for unapproved material at boiler room.
Aug 14, 2017
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35250891m issued on 04/27/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. note: document file for job#510112815 6/21/17 was disapproved.
Aug 14, 2017
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation #35250892y issued on 04/27/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for use of unapproved ma
Jun 26, 2017
Resolve - Class - 1
Failure to comply with the commissioners order contained in summons/violation #35250891m issued on 4/27/17 & to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.work without a permit.noted
Jun 26, 2017
Resolve - Class - 1
Work without a permit. i observed in boiler room area newly installed.hot water heater with gas,flu and water connections.no permits on file
Apr 27, 2017
Resolve - Class - 1
Failure to maintain building in code-compliant manner. i observed in boiler room newly installed hot water heater w/ gas connection which pro-pex copper pipe and fittings were used for gas line attached to wate
Mar 27, 2017
Resolve - Class - 1
Work w/o a permit. i observed in boiler room area newly installed hot water heater w/ gas, flu and water connections. no permits on file. remedy: obtain permit
Mar 27, 2017 · Penalty $400
Resolve - Class - 1
27misc,28misc,bc misc. miscellaneous violations use of unapproved material .i observed in boiler room newley installed hot water heater with gas connected which pro-pex copper pipe and fitting were used for gas
Mar 27, 2017
Resolve - Class - 1
Failure to mainain buildin gin code compliant manner.re:prohibited material. i oberved in boiler room newly installed, hot water heater with a pro-pex copper fitting and cappr pipe installed for hot water gas
Mar 27, 2017 · Penalty $250
Resolve
Complaints
- Door/window
Door
Aug 22, 2014 · Apt 1
Close - Heat/hot water
Apartment only
Aug 22, 2014 · Apt 1
Close - Plumbing
Basin/sink
Aug 22, 2014 · Apt 1
Close - Plumbing
Water supply
Aug 22, 2014 · Apt 1
Close - Flooring/stairs
Floor
Aug 22, 2014 · Apt 1
Close - Paint/plaster
Wall
Aug 22, 2014 · Apt 1
Close - Paint/plaster
Ceiling
Aug 22, 2014 · Apt 1
Close - Paint/plaster
Wall
Aug 22, 2014 · Apt 1
Close - Appliance
Electric/gas range
Aug 22, 2014 · Apt 1
Close - Paint/plaster
Ceiling
Aug 22, 2014 · Apt 1
Close
Show 17 more ↓
- Flooring/stairs
Stairs
Aug 22, 2014 · Apt 1
Close - Electric
Outlet/switch
Aug 22, 2014 · Apt 1
Close - Unsanitary condition
Pests
Aug 22, 2014 · Apt 1
Close - Unsanitary condition
Pests
Aug 13, 2014 · Apt SIDE
Close - Plumbing
Basin/sink
Aug 13, 2014 · Apt SIDE
Close - Heat/hot water
Apartment only
Aug 13, 2014 · Apt SIDE
Close - Door/window
Door
Aug 13, 2014 · Apt SIDE
Close - Electric
Lighting
Aug 13, 2014 · Apt SIDE
Close - Appliance
Electric/gas range
Aug 13, 2014 · Apt SIDE
Close - Paint/plaster
Wall
Aug 13, 2014 · Apt SIDE
Close - Flooring/stairs
Floor
Aug 13, 2014 · Apt SIDE
Close - Plumbing
Water supply
Aug 13, 2014 · Apt SIDE
Close - Paint/plaster
Ceiling
Aug 13, 2014 · Apt SIDE
Close - Paint/plaster
Wall
Aug 13, 2014 · Apt SIDE
Close - Paint/plaster
Ceiling
Aug 13, 2014 · Apt SIDE
Close - Electric
Outlet/switch
Aug 13, 2014 · Apt SIDE
Close - Heating
Heat related
Dec 19, 2010 · Apt SIDE
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Office building (O8)
- Year built
- 1991
- Floors
- 2
- Residential units
- 1
- Building area
- 3,600 ft²
- Lot area
- 4,160 ft²
- Zoning
- R2
- Community board
- 501
- Council district
- 49
- Block / lot
- 653 / 16
- Assessed value
- $193,500
- Landmark / historic district
- No
Questions about 1326 Clove Road
Who owns 1326 Clove Road?
The owner of record in NYC Department of City Planning PLUTO data is Singh, Amrit Pal.
Does 1326 Clove Road have violations?
Yes. NYC HPD has recorded 18 housing violations at this property.
Is 1326 Clove Road rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1326 Clove Road built?
City records list 1991 as the year it was built.
How many apartments are in 1326 Clove Road?
It has 1 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.