Staten Island, NY 10304BBL 5-00638-0049Map

Owner of record: Nigerian Muslim Community Of S I

38 Hardy Street is a religious facility built in 1970 in Staten Island, 10304. The owner of record is Nigerian Muslim Community Of S I. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
1
ECB violations
13
HPD complaints
0

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 1

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 27, 2022

    Dob violation - dismissed

ECB violations · 13

  • Class - 2

    At time of inspection, i observed tree protection was not provided for 5 trees at exposure #1 as per code section bc 3309.11. / provide tree protection.

    Sep 13, 2025 · Penalty $10,000

    Active
  • Class - 2

    Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. no certificate of correction on file with dob for class 1 b115 violation issued on 1/27/25 f

    Mar 7, 2025 · Penalty $3,125

    Resolve
  • Class - 1

    Unlawfully continued work while on notice of a stop work order. observed workers on site building cmu wall at exp 2 on level 2. active full stop work order on site issued under complaint #5188328 on 1/27/25. sw

    Mar 7, 2025 · Penalty $12,500

    Resolve
  • Class - 1

    Tampered with, removed or defaced a written posted stop work order. observed swo sticker posted on 1/27/25 has been removed from site. sticker originally posted on job site information board on construction fen

    Mar 7, 2025 · Penalty $12,500

    Resolve
  • Class - 1

    Work without permit; observed work in progress, workers on site installing cmu wall at exposure 2. permit #520256767 allowing for alteration has been expired since 9/23/23. permit has not been renewed, no gc pe

    Mar 7, 2025 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures or temporary construction - no guard rails. at time of inspection observed excessive construction debris piled up near an opening. also observed at exp#4

    Jan 27, 2025 · Penalty $12,500

    Resolve
  • Class - 2

    Failure to provide approved/accepted constructions documents at job site at time of inspection. at time of inspection upon request for approved plans i was provided with plans under job#s00815511-1 (amendment)

    Jan 27, 2025 · Penalty $625

    Resolve
  • Class - 2

    At time of inspection of an active jobsite i observed an elevator pit at exposure 3. sections of joist are removed/ replaced that are over the pit that are not on the design drawings .provide pe assessment repo

    Jul 26, 2022 · Penalty $620

    Resolve
  • Class - 2

    At time of inspection of an active job site i observed make-shift temporary shoring at multiple locations throughtout the job site no design drawings were presented at time of inspection .

    Jul 26, 2022 · Penalty $1,250

    Resolve
  • Class - 1

    At time of inspection of an active jobsite i observed wood joist throughout the job site/ fire extinguishers not fully charged and no tags or date of last inspection .

    Jul 26, 2022 · Penalty $2,500

    Resolve
Show 3 more ↓
  • Class - 1

    Bc3303.4.1.1 sidewalk not maintained.at the time of inspection of a 2 story bldg under alteration inactive jobsite observed sidewalk at exp.#1 not maintained-multiple cracks observed that create a tripping haza

    Jan 25, 2022 · Penalty $6,250

    Resolve
  • Class - 2

    Jobsite fence is not maintained.at the time of inspection of 2 story under alteration bldg inactive job site observed construction fence inplace at all exposures.the above construction fence is leaning towards

    Jan 25, 2022 · Penalty $2,500

    Resolve
  • Class - 2

    Fialure of permit holder to provide inspection access to and/or exposeon going construction or work on an active and permitted work site.at time of my inspection i observed apprximately 3 workers through viewin

    Jul 12, 2021 · Penalty $5,000

    Resolve

Complaints

No HPD complaints in our records

Complaint data is still being backfilled from NYC Open Data.

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Religious facility (M9)
Year built
1970
Floors
2
Residential units
—
Building area
1,360 ft²
Lot area
2,400 ft²
Zoning
R3A
Community board
501
Council district
49
Block / lot
638 / 49
Assessed value
$231,750
Landmark / historic district
No

Questions about 38 Hardy Street

Who owns 38 Hardy Street?

The owner of record in NYC Department of City Planning PLUTO data is Nigerian Muslim Community Of S I.

Does 38 Hardy Street have violations?

NYC HPD has no housing violations on record for this property.

Is 38 Hardy Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 38 Hardy Street built?

City records list 1970 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.