234 Targee Street
Staten Island, NY 10304BBL 5-00565-0180Map
Owner of record: Zvbn Holdings LLC
234 Targee Street is a two-family home built in 1988 in Staten Island, 10304. It has 2 residential units across 3 floors. The owner of record is Zvbn Holdings LLC. HPD has recorded 113 housing violations here, most recently on November 30, 2025. 43 of the 50 most recent violations are still open.
- HPD violations
- 113
- DOB violations
- 2
- ECB violations
- 6
- HPD complaints
- 166
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 113
- BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt a, 1st story, 1st apartment from west at north
Nov 30, 2025 · Apt A
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt a, 1st story, 1st apartment from west at north
Nov 30, 2025 · Apt A
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom located at apt a, 1st story, 1st apartment from west at north
Nov 30, 2025 · Apt A
Open — Nov sent out - BHazardous
Replace the broken or defective at washbasin in the bathroom located at apt a, 1st story, 1st apartment from west at north
Nov 30, 2025 · Apt A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles at lower level in the bathroom located at apt a, 1st story, 1st apartment from west at north
Nov 30, 2025 · Apt A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north located at apt a, 1st story, 1st apartment from west at north
Nov 30, 2025 · Apt A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt a, 1st story, 1st apartment from west at north
Nov 30, 2025 · Apt A
Open — Nov sent out - BHazardous
Cleanse and disinfect to the satisfaction of this department after removing the sewage and water at lower level in the bathroom located at apt a, 1st story, 1st apartment from west at north
Nov 30, 2025 · Apt A
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at west( rear) yard
Apr 25, 2024
Open — Invalid certification - BHazardous
Properly secure the loose wood handrails at south leading from lower to upper level in the foyer located at apt a, 1st story, 1st apartment from south at west
Apr 25, 2024 · Apt A
Open — Invalid certification
Show 40 more ↓
- CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling( upper level) in the 1st room from east located at apt a, 1st story, 1st apartment from south at west
Apr 25, 2024 · Apt A
Open — Nov certified late - BHazardous
Trace and repair the source and abate the visible mold condition... approx 10sq ft at ceiling ( upper level) in the 1st room from east located at apt a, 1st story, 1st apartment from south at west
Apr 25, 2024 · Apt A
Open — First no access to re- inspect violation - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 30, 2023
Closed — Violation dismissed - BHazardous
Properly secure the loose light fixture at ceiling in the 1st room from north located at apt 1, 1st story, 1st apartment from south at west
Sep 28, 2023 · Apt 1
Open — Invalid certification - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color all walls and. celing at upper level in the 1st room from north located at apt 1, 1st story, 1st apartment from south at west
Sep 28, 2023 · Apt 1
Open — Invalid certification - BHazardous
Properly repair or replace the broken or defective base cabinets at north wall in the kitchen located at apt 1, 1st story, 1st apartment from south at west
Sep 28, 2023 · Apt 1
Open — Invalid certification - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Sep 28, 2023 · Apt 1
Open — Invalid certification - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 1st room from east located at apt 1, 1st story, 1st apartment from south at west
Sep 28, 2023 · Apt 1
Open — Invalid certification - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 18, 2022
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt b, 2nd story, 1st apartment from east at south
Sep 10, 2021 · Apt B
Closed — Violation closed - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt b, 2nd story, 1st apartment from east at south
Sep 10, 2021 · Apt B
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 31, 2018
Closed — Violation dismissed - CImmediately hazardous
Properly repair the broken or defective metal cover on baseboard heater along west wall in the 2nd room from east located at apt b mid level, 3rd story
Apr 28, 2017 · Apt B
Closed — Violation closed - BHazardous
Replace with new the broken or defective light switch on west wall in the 2nd room from east located at apt b mid level, 3rd story
Apr 28, 2017 · Apt B
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice located at apt b, 3rd story
Apr 28, 2017 · Apt B
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in drain line at sink in the kitchen located at apt b, 3rd story
Apr 28, 2017 · Apt B
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in drain line at bathtub in the bathroom located at apt b upper level, 3rd story
Apr 28, 2017 · Apt B
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak above the ceiling in the 1st room from east located at apt b upper level, 3rd story
Apr 28, 2017 · Apt B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from east located at apt b upper level, 3rd story
Apr 28, 2017 · Apt B
Open — Nov sent out - ANon-hazardous
Repair the leaky and/or defective faucets the sink in the kitchen located at apt b, 3rd story
Apr 28, 2017 · Apt B
Open — Nov sent out - BHazardous
Properly repair the broken or defective light fixture at the ceiling in the private hallway located at apt b upper level, 3rd story
Apr 20, 2017 · Apt B
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt b, 3rd story
Apr 20, 2017 · Apt B
Open — Nov sent out - CImmediately hazardous
Remove all obstructions and repair all defects in waste line at sink in the kitchen located at apt b, 3rd story, apartment at east
Mar 23, 2017 · Apt B
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt b, 3rd story
Feb 8, 2017 · Apt B
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 1st room from east located at apt b upper level, 3rd story
Feb 8, 2017 · Apt B
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from east located at apt b upper level, 3rd story
Feb 8, 2017 · Apt B
Open — Nov sent out - BHazardous
Properly repair the broken or defective electric light switch on west wall in the 2nd room from east located at apt b mid level, 3rd story
Feb 8, 2017 · Apt B
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in drain at bathtub in the bathroom located at apt b upper level, 3rd story
Feb 8, 2017 · Apt B
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of hot water exceeds the maximum of 130 degrees, found hot water to be 156 degrees in the entire apartment located at apt b, 3rd story
Feb 8, 2017 · Apt B
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective boiler located at apt b mid level, 3rd story
Feb 8, 2017 · Apt B
Open — Nov sent out - BHazardous
Replace with new the missing metal cover onto the baseboard radiator on west wall in the 2nd room from east located at apt b mid level, 3rd story
Feb 8, 2017 · Apt B
Open — Nov sent out - BHazardous
Properly repair the broken or defective light fixture at the ceiling in the private hallway located at apt b upper level, 3rd story
Feb 8, 2017 · Apt B
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Jan 9, 2017
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at thermostat in the 2nd room from east located at apt b lower level, 3rd story
Jan 5, 2017 · Apt B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color - the ceiling in the 1st room from east located at apt b upper level, 3rd story
Jan 5, 2017 · Apt B
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in waste line at wash basin in the bathroom located at apt b upper level, 3rd story
Jan 5, 2017 · Apt B
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in from wash basin in the bathroom located at apt b lower level, 3rd story
Jan 5, 2017 · Apt B
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice located at apt b, 3rd story
Jan 5, 2017 · Apt B
Open — Nov sent out - BHazardous
Replace with new the broken or defective light switch at west wall in the 2nd room from east located at apt b lower level, 3rd story
Jan 5, 2017 · Apt B
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt b lower level, 3rd story
Jan 5, 2017 · Apt B
Open — Nov sent out
DOB building violations · 2
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 22, 2012
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 22, 2012
Dob violation - dismissed
ECB violations · 6
- Class - 1
Ecb issued for rca not corrected .rca issued on 6/13/24 for failure to maintain bldg.c.c.m .by badge #3678 noted :at time of inspection, observed combustible materials (plastic bags of clothing, personal items)
Jan 16, 2025 · Penalty $6,250
Active - Class - 2
Work without a permit . ecb issued for rca not corrected .rca issued on 06/13/2024 by badge #3678 noted: full height partition walls with door erected sub-dividing the living room to create an additional bedroo
Jan 16, 2025 · Penalty $6,250
Active - Class - 2
Ecb issued for rca not corrected .rca issued on 6/13/24 by badge #3678 noted :partition walls erected sub-dividing the living room to create an additional bedroom on the 3rd floor. c of o #076401 indicates clas
Jan 16, 2025 · Penalty $6,250
Active - Class - 1
B101: found new weil mclan bioler installed without work permit.
Nov 22, 2011
Resolve - Class - 1
4a,15,19b,24b,38,50: 50-missing relief valve on cold water line at co il
Nov 22, 2011 · Penalty $5,000
Resolve - Non-hazardous
Illegal use in a residential district. noted: storage of a 5 vehicles in rear yard w/o lic plates in a residential zone. zoning map # 21d indicates a 4r zone. remedy: discontinue illegal use, remove vehicles.
Apr 30, 2007
Resolve
Complaints
- Unsanitary condition
Sewage
Nov 21, 2025 · Apt A
Close - Appliance
Electric/gas range
Nov 21, 2025 · Apt A
Close - Plumbing
Water supply
Nov 20, 2025 · Apt 2
Close - Plumbing
Water supply
Nov 14, 2025 · Apt 2
Close - Unsanitary condition
Mold
Apr 19, 2024 · Apt A
Close - Paint/plaster
Ceiling
Apr 19, 2024 · Apt A
Close - Flooring/stairs
Stairs
Apr 19, 2024 · Apt A
Close - Appliance
Electric/gas range
Apr 19, 2024 · Apt A
Close - Unsanitary condition
Garbage/recycling storage
Apr 16, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Apr 16, 2024 · Apt BLDG
Close
Show 40 more ↓
- Flooring/stairs
Floor
Nov 2, 2023 · Apt 1
Close - Unsanitary condition
Pests
Nov 2, 2023 · Apt 1
Close - Unsanitary condition
Pests
Nov 2, 2023 · Apt 1
Close - Unsanitary condition
Mold
Nov 2, 2023 · Apt 1
Close - Unsanitary condition
Sewage
Nov 2, 2023 · Apt 1
Close - Unsanitary condition
Sewage
Sep 21, 2023 · Apt 1
Close - Paint/plaster
Ceiling
Sep 21, 2023 · Apt 1
Close - Unsanitary condition
Pests
Sep 21, 2023 · Apt 1
Close - Paint/plaster
Cabinet
Sep 21, 2023 · Apt 1
Close - Unsanitary condition
Mold
Sep 21, 2023 · Apt 1
Close - Electric
Lighting
Sep 21, 2023 · Apt 1
Close - Unsanitary condition
Pests
Sep 9, 2021 · Apt B
Close - Heat/hot water
Apartment only
Sep 9, 2021 · Apt B
Close - Unsanitary condition
Pests
Sep 8, 2021 · Apt B
Close - Heat/hot water
Apartment only
Sep 8, 2021 · Apt B
Close - Unsanitary condition
Garbage/recycling storage
Sep 8, 2021 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 23, 2021 · Apt BLDG
Close - Unsanitary condition
Pests
Feb 6, 2021 · Apt B
Close - Unsanitary condition
Garbage/recycling storage
Feb 6, 2021 · Apt BLDG
Close - Door/window
Window frame
Jul 21, 2020 · Apt B
Close - Unsanitary condition
Pests
Jul 21, 2020 · Apt B
Close - Unsanitary condition
Pests
Jul 12, 2020 · Apt B
Close - Plumbing
Toilet
Jul 12, 2020 · Apt B
Close - Unsanitary condition
Pests
Jul 12, 2020 · Apt B
Close - Unsanitary condition
Pests
Jul 12, 2020 · Apt B
Close - Plumbing
Basin/sink
Jul 12, 2020 · Apt B
Close - Safety
Window guard broken/missing
Jul 12, 2020 · Apt B
Close - General
Ventilation system
Oct 29, 2019 · Apt B
Close - Appliance
Refrigerator
Oct 29, 2019 · Apt B
Close - Electric
Outlet/switch
Oct 29, 2019 · Apt B
Close - Unsanitary condition
Pests
Oct 29, 2019 · Apt B
Close - Unsanitary condition
Pests
Oct 29, 2019 · Apt B
Close - Safety
Window guard broken/missing
Oct 29, 2019 · Apt B
Close - General
Cooking gas
Oct 29, 2019 · Apt B
Close - Heat/hot water
Apartment only
Oct 29, 2019 · Apt B
Close - Heat/hot water
Apartment only
Oct 29, 2019 · Apt B
Close - Heat/hot water
Apartment only
Nov 17, 2017 · Apt B
Close - Plumbing
Basin/sink
Apr 25, 2017 · Apt B
Close - Plumbing
Basin/sink
Apr 25, 2017 · Apt B
Close - Electric
No lighting
Apr 25, 2017 · Apt B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B1)
- Year built
- 1988
- Floors
- 3
- Residential units
- 2
- Building area
- 1,372 ft²
- Lot area
- 1,612 ft²
- Zoning
- R3A
- Community board
- 501
- Council district
- 49
- Block / lot
- 565 / 180
- Assessed value
- $35,100
- Landmark / historic district
- No
HPD registration #10276, last renewed Oct 17, 2025.
Questions about 234 Targee Street
Who owns 234 Targee Street?
The owner of record in NYC Department of City Planning PLUTO data is Zvbn Holdings LLC.
Does 234 Targee Street have violations?
Yes. NYC HPD has recorded 113 housing violations at this property.
Is 234 Targee Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 234 Targee Street built?
City records list 1988 as the year it was built.
How many apartments are in 234 Targee Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.