207 Targee Street
Staten Island, NY 10304BBL 5-00563-0043Map
Owner of record: 207 Targee Street LLC
207 Targee Street is a walk-up apartment building built in 1930 in Staten Island, 10304. It has 3 residential units across 3 floors. The owner of record is 207 Targee Street LLC. HPD has recorded 245 housing violations here, most recently on August 12, 2026. 50 of the 50 most recent violations are still open.
- HPD violations
- 245
- DOB violations
- 15
- ECB violations
- 12
- HPD complaints
- 184
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 245
- ANon-hazardous
Paint or post a sign indicating floors and or near fire stairs at public hall, 1st story
Aug 12, 2026
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening slidebolt capable of padlock at door at west at public hall, 1st story
Aug 12, 2026
Open — Nov sent out - CImmediately hazardous
Properly secure the loose wood balustrade at south at public hall, 3rd story
Aug 12, 2026
Open — Nov sent out - ANon-hazardous
Paint or post a sign indicating floors and or near fire stairs at public hall, 3rd story
Aug 12, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 12, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at public hall, 1st story
Aug 12, 2026
Open — Nov sent out - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all parts, members, and balconies at fire escape at north
Aug 12, 2026
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items at 3rd story balcony at fire escape at north
Aug 12, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective masonry stucco at north exterior wall at cellar level
Aug 12, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective masonry stucco at east exterior wall at cellar level
Aug 12, 2026
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Properly repair or replace the broken or defective counter balance of lower sash at window at south at public hall stairs, 3rd story
Aug 12, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective counter balance of upper sash at window at south at public hall stairs, 3rd story
Aug 12, 2026
Open — Nov sent out - BHazardous
Replace with new the missing 6th and 14th wood balusters at balustrade at south at public hall, 3rd story
Aug 12, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling at public hall, 3rd story
Aug 12, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at all walls and ceiling at public hall, 3rd story
Aug 12, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor at public hall, 3rd story
Aug 12, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Aug 12, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Aug 12, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective counter balance of upper sash at window at south at public hall, 1st story
Aug 12, 2026
Open — Nov sent out - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at west at public hall, 1st story
Aug 12, 2026
Open — Nov sent out - BHazardous
Abate the nuisance consisting of pests. evidence of gnats at public hall, 1st story
Aug 12, 2026
Open — Nov sent out - BHazardous
Abate the nuisance consisting of pests. evidence of flies at public hall, 1st story
Aug 12, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story
Aug 12, 2026
Open — Nov sent out - BHazardous
Install and maintain sufficient light or lights of at least 100 watts incandescent or equivalent each, to light adequately from sunset to sunrise the at building front
Aug 12, 2026
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective masonry stucco at west exterior wall at cellar level
Aug 12, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective masonry stucco at south exterior wall at cellar level
Aug 12, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling at public hall, 2nd story
Aug 12, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at all walls and ceiling at public hall, 2nd story
Aug 12, 2026
Open — Nov sent out - ANon-hazardous
Paint or post a sign indicating floors and or near fire stairs at public hall, 2nd story
Aug 12, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at public hall, 2nd story
Aug 12, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story
Aug 12, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling at public hall, 1st story
Aug 12, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective lock and assembly at building entrance door , 1st story
Aug 12, 2026
Open — Nov sent out - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at building entrance , 1st story
Aug 12, 2026
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 5th room from east located at apt 3l, 3rd story, 1st apartment from north at east
Aug 12, 2026 · Apt 3L
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 5th room from east located at apt 3l, 3rd story, 1st apartment from north at east
Aug 12, 2026 · Apt 3L
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical light switch at east wall in the 6th room from east located at apt 3l, 3rd story, 1st apartment from north at east
Aug 12, 2026 · Apt 3L
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective counter balance of upper sash at 2nd window from north at east in the kitchen located at apt 3l, 3rd story, 1st apartment from north at east
Aug 12, 2026 · Apt 3L
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the kitchen located at apt 3l, 3rd story, 1st apartment from north at east
Aug 12, 2026 · Apt 3L
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 3l, 3rd story, 1st apartment from north at east
Aug 12, 2026 · Apt 3L
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 3l, 3rd story, 1st apartment from north at east
Aug 12, 2026 · Apt 3L
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at missing at public hall, 1st story
Aug 12, 2026
Open — Nov sent out - CImmediately hazardous
Remove all obstructions and repair all defects in bathtub wasteline in the bathroom located at apt 3l, 3rd story, 1st apartment from north at east
Aug 12, 2026 · Apt 3L
Open — Nov sent out - CImmediately hazardous
Properly secure the loose washbasin in the bathroom located at apt 3l, 3rd story, 1st apartment from north at east
Aug 12, 2026 · Apt 3L
Open — Nov sent out - CImmediately hazardous
Repair the leaky and/or defective water supply pipe under sink in the kitchen located at apt 3l, 3rd story, 1st apartment from north at east
Aug 12, 2026 · Apt 3L
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical light fixture at ceiling in the bathroom located at apt 3l, 3rd story, 1st apartment from north at east
Aug 12, 2026 · Apt 3L
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective hinges at entrance door in the bathroom located at apt 3l, 3rd story, 1st apartment from north at east
Aug 12, 2026 · Apt 3L
Open — Nov sent out - BHazardous
Replace the broken or defective sink in the kitchen located at apt 3l, 3rd story, 1st apartment from north at east
Aug 12, 2026 · Apt 3L
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective formica countertop in the kitchen located at apt 3l, 3rd story, 1st apartment from north at east
Aug 12, 2026 · Apt 3L
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor in the 4th room from east located at apt 3l, 3rd story, 1st apartment from north at east
Aug 12, 2026 · Apt 3L
Open — Nov sent out
DOB building violations · 15
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed
Show 5 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Construction other optional
C-construction other optional
Oct 28, 1994
Vh*-violation hazardous dismissed
ECB violations · 12
- Class - 2
Occupancy contrary to that allowed by c of o and/or department of building records. partitions erected creating a total of 9 sro units. 4 sro units at 1st story. 2 sro units at 2nd story. 3 sro units at 3rd sto
Dec 23, 2022 · Penalty $1,250
Active - Class - 1
At time of inspection observed at 3 floor created sro with bed, personal belonginess, microwave and fridge., restore to prior legal condition
Dec 21, 2022
Resolve - Class - 1
At time of inspection observed at 3 floor created sro with bed, personal belonginess, microwave and fridge., restore to prior legal condition
Dec 21, 2022
Resolve - Class - 1
At 2 floor rear created sro where second means egress/fire escape broken, part displaced between 1st and 2nd floor., restore to prior legal condition
Dec 21, 2022
Resolve - Class - 2
At time of inspection observed created 5 sro,s where erected full heights partitions. also observed area excavated at front side of the building. no permit found on file., obtain all permits
Dec 21, 2022
Resolve - Class - 1
At time of inspection observed at 2 floor created sro with bed, personal belonginess, microwave and fridge., restore to prior legal condition
Dec 21, 2022
Resolve - Class - 1
At time of inspection observed at rear of the building fire escape in state of disrepair, part of fire escape displaced between 1st and 2nd floor. at 3rd floor stair railing broken., repair and/replace
Dec 21, 2022
Resolve - Class - 1
At 3 floor rear created sro where second means egress/fire escape broken, part displaced between 1st and 2nd floor., restore to prior legal condition
Dec 21, 2022
Resolve - Class - 2
As per class 2 (b265) 28-303.7, failure to file a complete boiler insp report as per dob records, submit a current bo-9 report.
Mar 24, 2017 · Penalty $500
Resolve - Hazardous
Work without a permit.work noted:doorways partitioned over at 1st/2nd floors creating 4 sro rooms on each floor.40 ft steel sea container at rear yard as storage shed.remedy:obtain permit or restore premises to
Oct 9, 2007 · Penalty $800
Resolve
Show 2 more ↓
- Hazardous
Residence altered for occupancy as a dwelling for more than the legally approved number of families:noted:bldg dept records state residence legally approved for 3 families:residence now altered converted to 8
Oct 9, 2007 · Penalty $7,550
Resolve - Non-hazardous
Illegal use in a residential district. noted: property in a r3-2 zone is being used for storage of a 30 foot metal container. (container in rear yard) remedy: remove storage container metal.
Oct 28, 1994 · Penalty $500
Resolve
Complaints
- Electric
Wiring
Oct 14, 2026 · Apt 3L
Open - Electric
Wiring
Oct 14, 2026 · Apt 3L
Open - Paint/plaster
Ceiling
Aug 6, 2026 · Apt 3L
Close - Door/window
Door
Aug 6, 2026 · Apt 3L
Close - Plumbing
Bathtub/shower
Aug 6, 2026 · Apt 3L
Close - Plumbing
Basin/sink
Aug 6, 2026 · Apt 3L
Close - Door/window
Door frame
Aug 6, 2026 · Apt 3L
Close - Electric
No lighting
Aug 6, 2026 · Apt 3L
Close - Water leak
Slow leak
Aug 6, 2026 · Apt 3L
Close - Door/window
Door
Jul 11, 2026 · Apt 3L
Close
Show 40 more ↓
- Electric
Wiring
Jul 11, 2026 · Apt 3L
Close - General
Cabinet
Jul 11, 2026 · Apt 3L
Close - Plumbing
Basin/sink
Jul 11, 2026 · Apt 3L
Close - Door/window
Door
Jun 29, 2026 · Apt 3L
Close - Plumbing
Basin/sink
Jun 29, 2026 · Apt 3L
Close - Water leak
Slow leak
Jun 29, 2026 · Apt 3L
Close - Plumbing
Bathtub/shower
Jun 29, 2026 · Apt 3L
Close - Paint/plaster
Ceiling
Jun 12, 2026 · Apt 3
Close - Plumbing
Basin/sink
Jun 12, 2026 · Apt 3
Close - Plumbing
Basin/sink
Jun 12, 2026 · Apt 3
Close - Plumbing
Basin/sink
Jun 12, 2026 · Apt 3
Close - Plumbing
Bathtub/shower
Jun 12, 2026 · Apt 3
Close - Plumbing
Basin/sink
May 6, 2026 · Apt 3L
Close - General
Cabinet
May 6, 2026 · Apt 3L
Close - Plumbing
Bathtub/shower
May 6, 2026 · Apt 3L
Close - Door/window
Door
May 6, 2026 · Apt 3L
Close - Outside building
Porch/balcony
May 6, 2026 · Apt 3L
Close - Door/window
Door
May 6, 2026 · Apt 3L
Close - Door/window
Door
Apr 16, 2026 · Apt 3L
Close - Door/window
Door
Apr 16, 2026 · Apt 3L
Close - General
Cabinet
Apr 16, 2026 · Apt 3L
Close - Plumbing
Basin/sink
Apr 16, 2026 · Apt 3L
Close - Plumbing
Toilet
Apr 16, 2026 · Apt 3L
Close - Door/window
Door
Apr 16, 2026 · Apt 3L
Close - General
Ventilation system
Apr 16, 2026 · Apt 3L
Close - Plumbing
Bathtub/shower
Apr 16, 2026 · Apt 3L
Close - Heat/hot water
Apartment only
Mar 19, 2026 · Apt 2
Close - Electric
Outlet/switch
Mar 19, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Mar 15, 2026 · Apt 3L
Open - Electric
No lighting
Mar 15, 2026 · Apt 3L
Open - Heat/hot water
Entire building
Mar 6, 2026 · Apt 2
Close - Electric
Power outage
Mar 6, 2026 · Apt 2
Close - Electric
No lighting
Mar 6, 2026 · Apt 3L
Close - Electric
No lighting
Mar 4, 2026 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Mar 4, 2026 · Apt 2NDFLO
Close - Unsanitary condition
Pests
Aug 16, 2023 · Apt BLDG
Close - Unsanitary condition
Pests
Aug 16, 2023 · Apt BLDG
Close - Unsanitary condition
Pests
Aug 16, 2023 · Apt BLDG
Close - Appliance
Refrigerator
Aug 16, 2023 · Apt BLDG
Close - Appliance
Electric/gas range
Aug 16, 2023 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1930
- Floors
- 3
- Residential units
- 3
- Building area
- 2,800 ft²
- Lot area
- 3,950 ft²
- Zoning
- R3A
- Community board
- 501
- Council district
- 49
- Block / lot
- 563 / 43
- Assessed value
- $51,900
- Landmark / historic district
- No
HPD registration #500353, last renewed Apr 6, 2026.
Questions about 207 Targee Street
Who owns 207 Targee Street?
The owner of record in NYC Department of City Planning PLUTO data is 207 Targee Street LLC.
Does 207 Targee Street have violations?
Yes. NYC HPD has recorded 245 housing violations at this property.
Is 207 Targee Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 207 Targee Street built?
City records list 1930 as the year it was built.
How many apartments are in 207 Targee Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.