roofy

309 Broad Street

Staten Island, NY 10304BBL 5-00544-0012Map

Owner of record: Diane Harris

309 Broad Street is a two-family home built in 1920 in Staten Island, 10304. It has 2 residential units across 2.5 floors. The owner of record is Diane Harris. HPD has recorded 39 housing violations here, most recently on December 7, 2022. 29 of the 39 most recent violations are still open.

HPD violations
39
DOB violations
0
ECB violations
0
HPD complaints
37

What to know

Concern
5 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Dec 7, 2022

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 39

  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 3rd room from north at west located at apt 1, 1st story, 1st apartment from south at west

    Dec 7, 2022 · Apt 1

    Open — Defect letter issued
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in shower stall in the bathroom located at apt 1, 1st story, 1st apartment from south at west

    Dec 1, 2022 · Apt 1

    Open — Nov sent out
  • B

    Remove all obstructions and repair all defects in waste line at washbasin in the bathroom located at apt 1, 1st story, 1st apartment from south at west

    Dec 1, 2022 · Apt 1

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 1, 1st story, 1st apartment from south at west

    Dec 1, 2022 · Apt 1

    Open — Nov sent out
  • C

    Properly repair the source and abate the evidence of a water leak at the ceiling in the 3rd room from north at east located at apt 1, 1st story, 1st apartment from south at west

    Nov 15, 2022 · Apt 1

    Closed — Violation closed
  • C

    Properly repair the source and abate the evidence of a water leak at the ceiling in the 3rd room from north at west located at apt 1, 1st story, 1st apartment from south at west

    Nov 15, 2022 · Apt 1

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 1, 1st story, 1st apartment from south at west

    Nov 15, 2022 · Apt 1

    Open — Nov sent out
  • C

    Remove all obstructions and repair all defects in wash basin waste pipe line in the bathroom located at apt 1, 1st story, 1st apartment from south at west

    Nov 15, 2022 · Apt 1

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north at east located at apt 1, 1st story, 1st apartment from south at west

    Oct 14, 2022 · Apt 1

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall, 1st window frame from east at south wall, 2nd window frame from east at south wall, 1st window frame from south at west wall, 2nd window frame from south at west wall, 3rd window frame from south at west wall, 4th window frame from south at west wall, 5th window frame from south at west wall in the 3rd room from north at west located at apt 1, 1st story, 1st apartment from south at west

    Oct 14, 2022 · Apt 1

    Open — Defect letter issued
Show 29 more ↓
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north at west located at apt 1, 1st story, 1st apartment from south at west

    Oct 14, 2022 · Apt 1

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 1, 1st story, 1st apartment from south at west

    Oct 14, 2022 · Apt 1

    Open — Nov sent out
  • B

    Remove all obstructions and repair all defects in waste pipe at washbasin in the bathroom located at apt 1, 1st story, 1st apartment from south at west

    Oct 14, 2022 · Apt 1

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective ceramic tiles at floor in the 1st room from north at east located at apt 1, 1st story, 1st apartment from south at west

    Oct 14, 2022 · Apt 1

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic tiles at north wall in the shower. in the bathroom located at apt 1, 1st story, 1st apartment from south at west

    Oct 14, 2022 · Apt 1

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 3rd room from north at west located at apt 1, 1st story, 1st apartment from south at west

    Oct 14, 2022 · Apt 1

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north at east located at apt 1, 1st story, 1st apartment from south at west

    Feb 3, 2022 · Apt 1

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective wood floor, in the 1st room from north at east located at apt 1, 1st story, 1st apartment from south at west

    Feb 3, 2022 · Apt 1

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color ,, north wall in the 1st room from north at east located at apt 1, 1st story, 1st apartment from south at west

    Feb 3, 2022 · Apt 1

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color ,, north wall, east wall in the 2nd room from north at west located at apt 1, 1st story, 1st apartment from south at west

    Feb 3, 2022 · Apt 1

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door from east at south wall, 1st door from north at east wall, 2nd window frame from south at west wall in the 2nd room from north at west located at apt 1, 1st story, 1st apartment from south at west

    Feb 3, 2022 · Apt 1

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall in the 1st room from north at east located at apt 1, 1st story, 1st apartment from south at west

    Feb 3, 2022 · Apt 1

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall in the kitchen located at apt 1, 1st story, 1st apartment from south at west

    Feb 3, 2022 · Apt 1

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from north at east wall in the bathroom located at apt 1, 1st story, 1st apartment from south at west

    Feb 3, 2022 · Apt 1

    Closed — Violation closed
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1, 1st story, 1st apartment from south at west

    Feb 3, 2022 · Apt 1

    Open — Certification postponment granted
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Jan 31, 2022

    Open — Info nov sent out
  • B

    Properly repair the broken or defective lower sash; counter balance at second window from north at east wall in the 1st room from east at south located at apt 1, 1st story, 1st apartment from east at south

    Jan 28, 2022 · Apt 1

    Closed — Violation dismissed
  • B

    Replace with new the broken or defective ceramic floor tiles in the kitchen located at apt 1, 1st story, 1st apartment from east at south

    Jan 28, 2022 · Apt 1

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 1, 1st story, 1st apartment from east at south

    Jan 28, 2022 · Apt 1

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Dec 24, 2019

    Open — Info nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic tiles at all walls and floor in the bathroom located at apt 1, 1st story

    Dec 23, 2019 · Apt 1

    Open — Nov sent out
  • B

    Properly repair the broken or defective uneven floor drain at floor inside shower stall in the bathroom located at apt 1, 1st story

    Dec 23, 2019 · Apt 1

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic tiles at floor in the kitchen located at apt 1, 1st story

    Dec 23, 2019 · Apt 1

    Open — Nov sent out
  • A

    Replace with new the missing closet doors in the 2nd room from north located at apt 1, 1st story

    Dec 23, 2019 · Apt 1

    Open — Nov sent out
  • A

    Refit door in the 1st room from north located at apt 1, 1st story

    Dec 23, 2019 · Apt 1

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 1, 1st story

    Dec 23, 2019 · Apt 1

    Open — Nov sent out
  • C

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 3rd room from north located at apt 1, 1st story

    Dec 23, 2019 · Apt 1

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color walls and ceilings in the entire apartment located at apt 1, 1st story

    Dec 23, 2019 · Apt 1

    Open — Nov sent out
  • C

    Properly repair the source and abate the evidence of a water leak ceiling in the 3rd room from north located at apt 1, 1st story

    Dec 23, 2019 · Apt 1

    Closed — Violation closed

DOB building violations · 0

No DOB violations on record

ECB violations · 0

No ECB violations on record

Complaints

  • Heat/hot water

    Apartment only

    Nov 29, 2022 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Nov 21, 2022 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Nov 19, 2022 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Nov 19, 2022 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Nov 18, 2022 · Apt 1

    Close
  • Appliance

    Electric/gas range

    Nov 14, 2022 · Apt 1

    Close
  • Paint/plaster

    Wall

    Nov 14, 2022 · Apt 1

    Close
  • Plumbing

    Basin/sink

    Nov 14, 2022 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Nov 14, 2022 · Apt 1

    Close
  • Flooring/stairs

    Floor

    Nov 14, 2022 · Apt 1

    Close
Show 27 more ↓
  • Water leak

    Heavy flow

    Nov 14, 2022 · Apt 1

    Close
  • Paint/plaster

    Radiator

    Nov 14, 2022 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Nov 14, 2022 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Oct 20, 2022 · Apt 1

    Close
  • Water leak

    Heavy flow

    Oct 13, 2022 · Apt 1

    Close
  • Plumbing

    Basin/sink

    Oct 13, 2022 · Apt 1

    Close
  • Flooring/stairs

    Floor

    Oct 13, 2022 · Apt 1

    Close
  • Paint/plaster

    Wall

    Oct 13, 2022 · Apt 1

    Close
  • Flooring/stairs

    Floor

    Oct 13, 2022 · Apt 1

    Close
  • Plumbing

    Basin/sink

    Oct 4, 2022 · Apt 1

    Close
  • Flooring/stairs

    Floor

    Oct 4, 2022 · Apt 1

    Close
  • Flooring/stairs

    Floor

    Oct 4, 2022 · Apt 1

    Close
  • Water leak

    Slow leak

    Oct 4, 2022 · Apt 1

    Close
  • Paint/plaster

    Wall

    Jan 30, 2022 · Apt 1

    Close
  • Plumbing

    Bathtub/shower

    Jan 30, 2022 · Apt 1

    Close
  • Flooring/stairs

    Floor

    Jan 30, 2022 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Jan 30, 2022 · Apt 1

    Close
  • Flooring/stairs

    Floor

    Jan 30, 2022 · Apt 1

    Close
  • Plumbing

    Bathtub/shower

    Jan 26, 2022 · Apt 1

    Close
  • Flooring/stairs

    Floor

    Jan 26, 2022 · Apt 1

    Close
  • General

    Cabinet

    Jan 26, 2022 · Apt 1

    Close
  • Door/window

    Door

    Jan 26, 2022 · Apt 1

    Close
  • Door/window

    Window frame

    Jan 26, 2022 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Jan 26, 2022 · Apt 1

    Close
  • Paint/plaster

    Wall

    Dec 17, 2019 · Apt 1

    Close
  • Plumbing

    Radiator

    Dec 17, 2019 · Apt 1

    Close
  • Water leak

    Heavy flow

    Dec 17, 2019 · Apt 1

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Two-family home (B2)
Year built
1920
Floors
2.5
Residential units
2
Building area
2,312 ft²
Lot area
5,750 ft²
Zoning
R3-2
Community board
501
Council district
49
Block / lot
544 / 12
Assessed value
$50,460
Landmark / historic district
No

Questions about 309 Broad Street

Who owns 309 Broad Street?

The owner of record in NYC Department of City Planning PLUTO data is Diane Harris.

Does 309 Broad Street have violations?

Yes. NYC HPD has recorded 39 housing violations at this property.

Is 309 Broad Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 309 Broad Street built?

City records list 1920 as the year it was built.

How many apartments are in 309 Broad Street?

It has 2 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.