roofy

75 Vanderbilt Avenue

Staten Island, NY 10304BBL 5-00534-0001Map

Owner of record: Bayley Seton Hospital

75 Vanderbilt Avenue is a hospital / health built in 1930 in Staten Island, 10304. The owner of record is Bayley Seton Hospital. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
364
ECB violations
79
HPD complaints
11

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. The newest 10 per agency here; the full lists are a click away.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 364

  • Construction other optional

    Failure to maintain building in a code compliant manner. at the time of inspection observed at exp 1,2,3 & 4 spalled cracked and deteriorated mortar joints at multiple locations. remedy: repair and or replace defected areas

    Oct 10, 2026

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Construction other optional

    Failure to maintain bldg in code compliant manner.exps 1,2,3&4 spalled spalling masonry decorative terra cotta @ parapet level & cracks of masonry brick facade. @ exp2,3&4 (west,north&east elevations) deteriorated mortar joints were observed. also at exp1 (south elev) broken wind glass. remedy: repair and/or replace

    Nov 8, 2024

    Dob violation - active
  • Emergency none

    Fully demolish building, grade & fence site. coordinate demo ops with fdny battalion 21 at 347-539-0521 & [email protected]

    Oct 29, 2024

    Dob violation - active
  • Immediate emergency anythingoptional

    Erect 530 ft of tight board construction fence as follows; exp1 150ft, exp2 115ft, exp3 150ft, exp4 115ft

    Oct 24, 2024

    Dob violation - dismissed
  • Construction other optional

    Structure non compliant damages observed are due to a fire. structure has a collapsed roof with windows & doors removed . the ceilings are o pen , these conditions render premises unsafe to occupy . vacate forwi th

    Oct 21, 2024

    Dob violation - active
  • Construction other optional

    Premise non-compliant building 5a: due to a fire and fire fighting operations. the roof is collapsed. the walls,doors,windows,ceilings,floors are damaged thru-out at time of inspection.

    Oct 21, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
See all 364 DOB violations (10 shown here)

ECB violations · 79

  • Class - 2

    3314.4.3.1 inspection prior to the installation of a suspended scaffold. observed suspended scaffold components installed on multiple exposures of the building. parapet clamps are being used throughout. upon re

    Jun 16, 2025 · Penalty $2,530

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specifications: at time of inspection it was observed at exposure 1(south elevation) a missing sidewalk shed panel and at exposures 1, 3 and 4(south, north and east elev

    Nov 8, 2024 · Penalty $2,400

    Active
  • Class - 2

    Temporary construction equipment onsite,expired permit.at time of inspection it was observed a construction fence installed on exposures 2,3& 4(west,north & east elevation)upon searching on bis and dobnow at va

    Nov 8, 2024

    Resolve
  • Class - 2

    Temp. construction equip/installation on site expired permit(shed). attime of inspection observed that work permit #500645005-i1-sh for existing sidewalk shed is expired on 04/06/2024. remedy: renew permit.

    Jun 28, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    Sidewalk shed does not meet code specification. at the main building observed missing sidewalk shed parapet panel at expsoure #1 south elevation above main entrance. also observed missing parapet panel of sidew

    Jun 28, 2024 · Penalty $2,400

    Active
  • Class - 1

    Failure to maintain exterior wall and apppurtenances. at time of inspection, observed at the main building and sub-building the following facade defects:(1) broken/cracked window glass at multiple locations. (2

    Jun 28, 2024 · Penalty $2,500

    Active
  • Class - 1

    Failure to comply with commissioner's order.violation#'s 090923csr0101mh,070523csr0101dj,032423csr0101mh,and 052522cll0103rf(dated 09/09/23,07/05/23,03/24/23,and 05/25/22 respectively all required building to b

    Feb 9, 2024 · Penalty $2,500

    Active
  • Class - 2

    Sidewalk shed does not meet code specfication.missing sidewalk shed parapet panel at exposure#1 south elevation above main entrance.rem:comform to code specifications.

    Feb 9, 2024 · Penalty $2,400

    Resolve
  • Class - 2

    At the time of inspection at 4.35 am i observed undesrside of sidewalk shed not illumnated as required by code-3307.6.4.8.sharp edges at vertical posts not protected-3307.6.5.6.the passageway under the shed hav

    Jun 29, 2023 · Penalty $5,000

    Resolve
  • Class - 1

    Observed no sidewalk shed/overhead protection or caz provided at exp#2,3&4. upon review the department records (bis & dob now) observed that last facade report was deemed unsafe (un) no new compliance filling s

    Mar 27, 2023 · Penalty $10,000

    Active
See all 79 ECB violations (10 shown here)

Complaints

  • Heat/hot water

    Entire building

    Mar 4, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    May 13, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 20, 2021 · Apt BLDG

    Close
  • Unsanitary condition

    Sewage

    Feb 24, 2021 · Apt 1STFLO

    Close
  • Unsanitary condition

    Sewage

    Feb 24, 2021 · Apt 1STFLO

    Close
  • Plumbing

    Toilet

    Feb 24, 2021 · Apt 1STFLO

    Close
  • Heat/hot water

    Entire building

    Jan 29, 2021 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Jan 17, 2021 · Apt 10K

    Close
  • Heat/hot water

    Entire building

    Jul 23, 2018 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Feb 15, 2016 · Apt 4

    Close
See all 11 HPD complaints (10 shown here)

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Hospital / health (I1)
Year built
1930
Floors
6
Residential units
—
Building area
502,197 ft²
Lot area
445,481 ft²
Zoning
R3-2
Community board
501
Council district
49
Block / lot
534 / 1
Assessed value
$13,349,700
Landmark / historic district
INDIVIDUAL LANDMARK

Questions about 75 Vanderbilt Avenue

Who owns 75 Vanderbilt Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Bayley Seton Hospital.

Does 75 Vanderbilt Avenue have violations?

NYC HPD has no housing violations on record for this property.

Is 75 Vanderbilt Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 75 Vanderbilt Avenue built?

City records list 1930 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.