52 Quinn Street
Staten Island, NY 10304BBL 5-00533-0019Map
Owner of record: Elizabeth Ovili
52 Quinn Street is a two-family home built in 1905 in Staten Island, 10304. It has 2 residential units across 2 floors. The owner of record is Elizabeth Ovili. HPD has recorded 424 housing violations here, most recently on August 11, 2025. 44 of the 50 most recent violations are still open.
- HPD violations
- 424
- DOB violations
- 6
- ECB violations
- 25
- HPD complaints
- 340
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 424
- CImmediately hazardous
Properly repair with similar material the broken or defective brick tread 3rd up from bottom at stoop
Aug 11, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood frame around roof at stoop
Aug 11, 2025
Open — Nov sent out - CImmediately hazardous
Properly secure the loose metal handrails north and south at stoop
Aug 11, 2025
Open — Nov sent out - CImmediately hazardous
Cleanse and disinfect to the satisfaction of this department after removing the sewage at floor at cellar
Jun 8, 2025
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
May 22, 2025
Open — Info nov sent out - CImmediately hazardous
Repair the roof so that it will not leak over the ceiling in the 5th room from east located at apt 1, 1st story, 1st apartment from east at south
May 21, 2025 · Apt 1
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 5th room from east located at apt 1, 1st story, 1st apartment from east at south
May 21, 2025 · Apt 1
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of electrical wiring at ceiling in the 5th room from east located at apt 1, 1st story, 1st apartment from east at south
May 21, 2025 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from east at south
May 21, 2025 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color all walls and ceiling in the kitchen located at apt 1, 1st story, 1st apartment from east at south
May 21, 2025 · Apt 1
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair with similar material the broken or defective 3rd concrete tread from bottom up at building front yard
May 21, 2025
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from east at south
May 10, 2025 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color all walls and ceiling in the kitchen located at apt 1, 1st story, 1st apartment from east at south
May 10, 2025 · Apt 1
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
May 10, 2025 · Apt 1
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 4th room from east located at apt 1, 1st story, 1st apartment from east at south
May 10, 2025 · Apt 1
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at ceiling in the 4th room from east located at apt 1, 1st story, 1st apartment from east at south
May 10, 2025 · Apt 1
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over the ceiling in the 4th room from east located at apt 1, 1st story, 1st apartment from east at south
May 10, 2025 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color all walls and ceiling in the 3rd room from east located at apt 1, 1st story, 1st apartment from east at south
May 10, 2025 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east located at apt 1, 1st story, 1st apartment from east at south
May 10, 2025 · Apt 1
Open — Nov sent out - BHazardous
Replace with new the missing 1st, 2nd, 3rd and 6th wood balusters at balustrade at north at building front
May 10, 2025
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective 3rd concrete tread from bottom up at stairs at building front
May 10, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective 3rd brick tread from bottom at building front at public hall stairs
Apr 5, 2025
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective connection at ceiling at cellar at cellar
Mar 16, 2025
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak over the ceiling in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Mar 16, 2025 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling and west wall in the 2nd room from east at north located at apt 1, 1st story, 1st apartment from east at south
Mar 16, 2025 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Mar 16, 2025 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak over the ceiling in the 2nd room from east at north located at apt 1, 1st story, 1st apartment from east at south
Mar 16, 2025 · Apt 1
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective connection at waste line at ceiling at front at cellar
Jan 28, 2025
Open — Nov sent out - CImmediately hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the thoughout at cellar
Jan 28, 2025
Open — Nov sent out - BHazardous
Properly secure the loose metal handrail at south at stoop
Jan 22, 2025
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective cold radiator at west wall in the 4th room from east at south located at apt 1, 1st story, 1st apartment from east at south
Jan 22, 2025 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective cold radiator at north wall in the 4th room from east at north located at apt 1, 1st story, 1st apartment from east at south
Jan 22, 2025 · Apt 1
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at public hall, 1st story
Jan 8, 2025
Open — Nov sent out - BHazardous
Repair the broken or defective connection at waste line at ceiling at front at cellar
Jan 8, 2025
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the household items throughout at cellar
Jan 8, 2025
Open — Nov sent out - BHazardous
Properly secure the loose metal handrail at south at stoop
Jan 7, 2025
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective connection at water supply pipe at ceiling at basement
Dec 12, 2024
Open — Nov sent out - CImmediately hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor at cellar
Nov 21, 2024
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Nov 21, 2024 · Apt 1
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 6th room from east located at apt 1, 1st story, 1st apartment from east at south
Nov 21, 2024 · Apt 1
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak over ceiling in the 6th room from east located at apt 1, 1st story, 1st apartment from east at south
Nov 21, 2024 · Apt 1
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of hotwater exceeding the maximum temperature of 130 degrees in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Nov 21, 2024 · Apt 1
Open — Nov sent out - CImmediately hazardous
§ 27-2028, 2032 admin.code: provide an adequate supply of heat from an approved central heating system or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Nov 21, 2024 · Apt 1
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Nov 14, 2024 · Apt 1
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Nov 14, 2024 · Apt 1
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sq ft at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Nov 14, 2024 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Nov 14, 2024 · Apt 1
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10sq ft at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from east at south original violation 17418464 issued 14-nov-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Nov 14, 2024 · Apt 1
Open — Not complied with - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Oct 8, 2024 · Apt 1
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Oct 8, 2024 · Apt 1
Open — Nov sent out
DOB building violations · 6
- Construction other optional
Requesting an engineer report due to bricks being dislodged from roof level at exposure#2 with potential of collapsing. an engineering report is required to assess the stability of chimney due to bricks being loose and dislodged.
Sep 4, 2025
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 31, 2018
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 31, 2018
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 19, 2018
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 9, 2018
Dob violation - active - Construction other optional
C-construction other optional
May 2, 2018
Dob violation - active
ECB violations · 25
- Class - 1
The canopy roof over front entry is collapsing from rotten wood members and supports. the brick chimney at exposure 2 is crumbling with bricks falling to alleyway below, repair and/replace; repair and make safe
Oct 21, 2025 · Penalty $25,000
Active - Class - 2
Work without a permit. at time of inspection observed a vertical rear extension at rear of property. observed a siding structure for 1fl with interior of 1fl 100% completed. upon inspection no permits were issu
Sep 4, 2025 · Penalty $6,250
Active - Class - 1
Failure to maintain building in a code compliant manner. at time of inspection observed a canopy at front porch in disrepair with potential of further collapsing. observed rotted wood debris and wood debris at
Sep 4, 2025 · Penalty $12,500
Active - Class - 2
Failure to maintain building in code-compliant manner. at time of inspection of a 2 family dwelling ,i observed at expo.#2 along the property line, horizontal cracks developing in the alleyway .i also observed
Oct 10, 2024 · Penalty $3,125
Active - Class - 2
Found new yorker gas fired boiler i n basement not operating, maintain boiler; correct violating condition submit certificate of correction
Oct 29, 2020 · Penalty $3,125
Active - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35343952j issued on 08/06/18 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. for failure to maintain bldg in code compliant mann
Mar 17, 2020 · Penalty $5,000
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#35343952j issued on 8/6/18 and to file a cert.of correction pursuant to 28-201.1 and 1rcny 102-01.rem:comply with commissioner's o
Jun 17, 2019 · Penalty $5,000
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35343952j issued on 08-06-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.
Apr 5, 2019 · Penalty $5,000
Resolve - Class - 2
Failure to comply w/ the commissioner's order contained in summons/violation#35343952j issued on 8/6/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. for holes in the ceiling on
Feb 2, 2019 · Penalty $3,125
Resolve - Class - 1
Failure to comply w/ the commissioner's order contained in summons/violation#35319633m issued on 5/20/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. work w/o a permit. noted:a
Feb 2, 2019 · Penalty $12,500
Resolve
Show 15 more ↓
- Class - 1
Failure to comply with the commissioners order contained in summons/ violation #35319633m issued on 05/02/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. remedy:comply with
Dec 7, 2018 · Penalty $12,500
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/ violation #35343952j issued on 08/06/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. remedy:comply with
Dec 7, 2018 · Penalty $3,125
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation#35347446p issued on 08/10/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for c of c.rem:comply wit
Sep 26, 2018 · Penalty $3,125
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation#35343952j issued on 08/06/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.fpr c of c,failure to mai
Sep 26, 2018 · Penalty $5,000
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violtion#35319633m issud on 05/02/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for c of c,work doesnt conf
Sep 26, 2018 · Penalty $3,125
Resolve - Class - 1
Failure to comply with the commissioners order contained in summons/violation #35319633m issued on 05/02/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for work performed in ce
Aug 10, 2018 · Penalty $6,250
Resolve - Class - 1
Removed or defaced a written posted vacate order.at time of inspectionvacate order 546/18 which was posted on 5/3/18 was not posted.it was obvious that is was there but torn off the door.rem:comply with code
Aug 10, 2018 · Penalty $25,000
Active - Class - 1
Failure to maintain building in a code compliant manner. noted;at 1st fl right side room observed holes in ceiling+wall. hole in ceiling is approx 5ft wide x 6ft length. hole in wall is approx 1ft wide x 6ft le
Aug 6, 2018 · Penalty $6,250
Active - Class - 2
Failure to comply w/comm's order contained in summ/vio#35319633m issu d on 5/2/18 and to file a cofc pursuant to 28-201.1 and 1rncy 102-01 no cert of correction on record.rem:comply w/comm's order and/or file
Jun 28, 2018 · Penalty $3,125
Resolve - Class - 1
Bc28-212.11/remove of posted order of the commissioner.noted:at time of inspection vacate order 546/18 posted on 5/03/18 and issued n 05/02/18 has been removed.rem:comply with commissioner order.
Jun 21, 2018 · Penalty $12,500
Active - Class - 1
Work does not conform to approved construction documents and/or approved amendments. work noted: at cellar level created full class "a" apt. erected full partitions with doors created bathroom and (4) bedrooms
May 2, 2018 · Penalty $12,500
Active - Class - 2
28-210.1 residence converted, maintained or occupied as a dwelling for more than the legally approved number of families. dob's records indicate residence legally approved as (2) family dwelling. now residence
May 2, 2018 · Penalty $6,250
Active - Class - 1
Plumbing work w/o permit witnessed one new.new yorker steam boiler and1 50 gallon ( )hot water heater in basement being installed,w/piping being replaced above gas valves.remedy:obtain permit to comply w/
Mar 30, 2009 · Penalty $12,000
Active - Non-hazardous
Failure to comply w/ a commissioner order to correct nov #34568797j, issued on 06-18-07 for work w/o permit. work observed was a gas line for a stove. water & waste lines for 3pc bath & kitchen sink & partition
Oct 30, 2007
Resolve - Hazardous
Work w/o a permit.work noted:upon my inspection i observed a gas stovehooked up,a sink in the bathroom w/a toilet & shower in kitchen sink w/waste & supply lines water & sewer.also erected partitions in basemen
Jun 18, 2007
Resolve
Complaints
- Electric
Power outage
Mar 2, 2026 · Apt 2D
Close - Paint/plaster
Ceiling
Aug 9, 2025 · Apt 1
Close - Unsanitary condition
Garbage/recycling storage
Aug 9, 2025 · Apt 1
Close - Flooring/stairs
Stairs
Aug 9, 2025 · Apt 1
Close - Unsanitary condition
Sewage
Jun 3, 2025 · Apt 1
Close - Unsanitary condition
Pests
Jun 3, 2025 · Apt 1
Close - Water leak
Heavy flow
May 21, 2025 · Apt 1STFL
Close - Outside building
Roofing
May 21, 2025 · Apt 1STFL
Close - Flooring/stairs
Stairs
May 21, 2025 · Apt 1STFL
Close - Water leak
Heavy flow
Apr 30, 2025 · Apt 1STFL
Close
Show 40 more ↓
- Flooring/stairs
Stairs
Apr 5, 2025 · Apt 1
Close - Unsanitary condition
Sewage
Feb 24, 2025 · Apt 1FLR
Close - Water leak
Heavy flow
Feb 23, 2025 · Apt 1
Close - Water leak
Heavy flow
Feb 10, 2025 · Apt 1
Close - Water leak
Slow leak
Feb 10, 2025 · Apt 1
Close - Plumbing
Steam pipe/riser
Jan 22, 2025 · Apt 1STFLO
Close - Unsanitary condition
Garbage/recycling storage
Jan 22, 2025 · Apt 1STFLO
Close - Unsanitary condition
Sewage
Jan 13, 2025 · Apt 1STFLO
Close - Unsanitary condition
Garbage/recycling storage
Jan 13, 2025 · Apt 1STFLO
Close - Plumbing
Steam pipe/riser
Jan 13, 2025 · Apt 1STFLO
Close - Plumbing
Steam pipe/riser
Jan 6, 2025 · Apt 1
Close - Unsanitary condition
Garbage/recycling storage
Jan 6, 2025 · Apt 1
Close - Plumbing
Steam pipe/riser
Jan 3, 2025 · Apt 1STFLO
Close - Plumbing
Steam pipe/riser
Dec 12, 2024 · Apt 1
Close - Heat/hot water
Entire building
Nov 20, 2024 · Apt 2
Close - Unsanitary condition
Garbage/recycling storage
Nov 15, 2024 · Apt BSMT
Close - Heat/hot water
Entire building
Nov 13, 2024 · Apt 1
Close - Heat/hot water
Apartment only
Oct 7, 2024 · Apt 1STFL
Close - Heat/hot water
Apartment only
Oct 7, 2024 · Apt 1
Close - Unsanitary condition
Pests
Sep 20, 2024 · Apt 1
Close - Unsanitary condition
Pests
Sep 5, 2024 · Apt 1
Close - Unsanitary condition
Sewage
Sep 5, 2024 · Apt 1
Close - Water leak
Heavy flow
Sep 5, 2024 · Apt 1
Close - Electric
Lighting
Aug 16, 2024 · Apt 1
Close - Water leak
Heavy flow
Aug 16, 2024 · Apt 1
Close - Unsanitary condition
Sewage
Jul 14, 2024 · Apt 1
Close - Unsanitary condition
Pests
Jul 8, 2024 · Apt 1
Close - Paint/plaster
Ceiling
Jul 8, 2024 · Apt 1
Close - Paint/plaster
Ceiling
Jun 18, 2024 · Apt 1
Close - Unsanitary condition
Sewage
Jun 18, 2024 · Apt 1
Close - Water leak
Heavy flow
May 31, 2024 · Apt 1
Close - Paint/plaster
Ceiling
May 31, 2024 · Apt 1
Close - Water leak
Heavy flow
May 8, 2024 · Apt 1STFL
Close - Paint/plaster
Ceiling
May 8, 2024 · Apt 1STFL
Close - Unsanitary condition
Pests
Apr 11, 2024 · Apt 1
Close - Unsanitary condition
Pests
Apr 11, 2024 · Apt 1
Close - Paint/plaster
Ceiling
Apr 11, 2024 · Apt 1
Close - Heat/hot water
Apartment only
Nov 12, 2023 · Apt 1
Close - Heat/hot water
Apartment only
Nov 3, 2023 · Apt 1STFL
Close - Door/window
Window pane
Nov 3, 2023 · Apt 1STFL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B2)
- Year built
- 1905
- Floors
- 2
- Residential units
- 2
- Building area
- 2,202 ft²
- Lot area
- 3,750 ft²
- Zoning
- R3-2
- Community board
- 501
- Council district
- 49
- Block / lot
- 533 / 19
- Assessed value
- $42,600
- Landmark / historic district
- No
Questions about 52 Quinn Street
Who owns 52 Quinn Street?
The owner of record in NYC Department of City Planning PLUTO data is Elizabeth Ovili.
Does 52 Quinn Street have violations?
Yes. NYC HPD has recorded 424 housing violations at this property.
Is 52 Quinn Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 52 Quinn Street built?
City records list 1905 as the year it was built.
How many apartments are in 52 Quinn Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.