roofy

215 Canal Street

Staten Island, NY 10304BBL 5-00527-0061Map

Owner of record: Galarza, John

215 Canal Street is a mixed residential and retail building built in 1931 in Staten Island, 10304. It has 2 residential units across 3 floors. The owner of record is Galarza, John. HPD has recorded 37 housing violations here, most recently on March 7, 2011. 37 of the 37 most recent violations are still open.

HPD violations
37
DOB violations
38
ECB violations
4
HPD complaints
72

What to know

Concern
2 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Mar 7, 2011

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 37

  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 3, 3rd story

    Mar 7, 2011 · Apt 3

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3, 3rd story

    Mar 7, 2011 · Apt 3

    Open — Nov sent out
  • B

    Properly secure the loose light fixture at ceiling at public hall, 1st story

    Dec 29, 2010

    Open — Nov sent out
  • B

    Abate the nuisance consisting of exposed electrical wires at ceiling light fixture at public hall, 1st story

    Dec 29, 2010

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood and vinyl tiles floor in the kitchen located at apt 3, 3rd story

    Dec 29, 2010 · Apt 3

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3, 3rd story

    Dec 29, 2010 · Apt 3

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3, 3rd story

    Dec 29, 2010 · Apt 3

    Open — Nov sent out
  • B

    M/d law abate the nuisance consisting of concealed water leak over ceiling in the 2nd room from east located at apt 3, 3rd story

    Apr 27, 2010 · Apt 3

    Open — Nov sent out
  • B

    Abate the nuisance consisting of mice in the entire apartment located at apt 3, 3rd story

    Apr 27, 2010 · Apt 3

    Open — Nov sent out
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 3, 3rd story

    Apr 27, 2010 · Apt 3

    Open — Nov sent out
Show 27 more ↓
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color west wall and ceiling in the private hallway located at apt 3, 3rd story

    Apr 14, 2010 · Apt 3

    Open — Nov sent out
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 3, 3rd story

    Apr 14, 2010 · Apt 3

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color west wall in the bathroom located at apt 2a, 2nd story

    Oct 20, 2008 · Apt 2A

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective cermic water closet bowl cover in the bathroom located at apt 2a, 2nd story

    Oct 20, 2008 · Apt 2A

    Open — Nov sent out
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet , in the bathroom located at apt 2a, 2nd story

    Oct 20, 2008 · Apt 2A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color east wall in the private hallway located at apt 2a, 2nd story

    Oct 20, 2008 · Apt 2A

    Open — Nov sent out
  • B

    Abate the nuisance consisting of vermin mice in the entire apartment located at apt 2a, 2nd story

    Oct 20, 2008 · Apt 2A

    Open — Nov sent out
  • B

    Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 2a, 2nd story

    Oct 20, 2008 · Apt 2A

    Open — Nov sent out
  • B

    Properly secure the loose light fixture at ceiling at public hall, 1st story

    Feb 8, 2008

    Open — Nov sent out
  • B

    Abate the nuisance consisting of exposed electrical wires at ceiling light fixture at public hall, 1st story

    Dec 24, 2007

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor at public hall, 2nd story

    Dec 24, 2007

    Open — Nov sent out
  • B

    Abate the nuisance consisting of exposed electrical wires at north wall in the kitchen located at apt 1, 2nd story

    Dec 24, 2007 · Apt 1

    Open — Nov sent out
  • B

    Properly repair the broken or defective electrical outlet at north wall in the kitchen located at apt 1, 2nd story

    Dec 24, 2007 · Apt 1

    Open — Nov sent out
  • B

    Properly repair the broken or defective ceiling light fixture at public hall, 2nd story

    Dec 24, 2007

    Open — Nov sent out
  • B

    Provide south wall closet door in the 3rd room from east located at apt 3, 3rd story

    Dec 19, 2007 · Apt 3

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective brick front face of building

    Dec 19, 2007

    Open — Nov sent out
  • A

    Refit entrance door in the 3rd room from east located at apt 3, 3rd story

    Dec 19, 2007 · Apt 3

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective vinly floor

    Dec 19, 2007

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective vinly floor in the kitchen located at apt 3, 3rd story

    Dec 19, 2007 · Apt 3

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 3rd room from east located at apt 3, 3rd story

    Dec 19, 2007 · Apt 3

    Open — Nov sent out
  • B

    Properly secure the loose south wall sink in the bathroom located at apt 3, 3rd story

    Dec 19, 2007 · Apt 3

    Open — Nov sent out
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 3, 3rd story

    Dec 19, 2007 · Apt 3

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color west wall in the private hallway located at apt 3, 3rd story

    Dec 19, 2007 · Apt 3

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color south wall in the bathroom located at apt 3, 3rd story

    Dec 19, 2007 · Apt 3

    Open — Nov sent out
  • B

    Abate the nuisance consisting of vermin mice in the entire apartment located at apt 3, 3rd story

    Dec 19, 2007 · Apt 3

    Open — Nov sent out
  • A

    Refit all windows in the entire apartment located at apt 3, 3rd story

    Dec 19, 2007 · Apt 3

    Open — Nov sent out
  • I

    Apartments have been issued a commissioner's order and occupants are in need of relocation services. apartments cannot be re-occupied unitl the commissioner's order is revoked after hpd inspection of apartments. commissioners order # 07/0051 in the entire apartment located at apt 2a, 1st story

    Sep 25, 2007 · Apt 2A

    Open — Info nov sent out

DOB building violations · 38

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - active
Show 28 more ↓
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Mar 19, 2014

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Mar 19, 2014

    Dob violation - active
  • Construction other optional

    Due to fire

    Mar 19, 2014

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - active
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Feb 18, 2007

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Feb 15, 2007

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 8, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 4, 1993

    Dob violation - dismissed
  • Boiler boiler optional

    B-boiler boiler optional

    Jun 14, 1989

    Dob violation - dismissed
  • Unsafe buildings none

    Ub-unsafe buildings none

    Feb 28, 1989

    Dob violation - active

ECB violations · 4

  • Class - 2

    As per class 2 (b265) 28-303.7 failure to file. a complete boiler inspection report as per dob records. submit a current bo-9 report. connect all violating conditions and submit the certificate of correction.

    Apr 22, 2016 · Penalty $2,500

    Active
  • Class - 1

    Failure to maintain bldg in a code-compliant manner. noted: interior stairs & landing defective. 1/2 of 1 tread from 2nd to 3rd flr is missing. entire set of stairs has drop 1 1/2". 2nd flr landing has a hole

    Jul 11, 2009 · Penalty $10,000

    Active
  • Class - 1

    Failure to maintain bldg in a code complaint manner.noted:stairs from second to third floor defective in that third step is not attach to any stringer.risk of falls in this instance is very high.remedy:repair

    Dec 16, 2008 · Penalty $5,000

    Active
  • Hazardous

    Occupancy contrary to that allowed by department records in that garage in rear premises is being use to repair and sell automobiles remedy: discontiue illegal use or obtain approval and permit

    Aug 2, 1991 · Penalty $285

    Resolve

Complaints

  • Heating

    Heat related

    Mar 3, 2011 · Apt 3

    Close
  • Heating

    Heat related

    Jan 9, 2011 · Apt 3

    Close
  • General

    Windows

    Dec 21, 2010 · Apt 3

    Close
  • Heating

    Heat related

    Dec 21, 2010 · Apt 3

    Close
  • Nonconst

    Vermin

    Apr 26, 2010 · Apt 3

    Close
  • Paint/plaster

    Wall

    Apr 26, 2010 · Apt 3

    Close
  • Paint/plaster

    Wall

    Apr 26, 2010 · Apt 3

    Close
  • Nonconst

    Vermin

    Apr 26, 2010 · Apt 3

    Close
  • Paint/plaster

    Wall

    Apr 26, 2010 · Apt 3

    Close
  • Appliance

    Electric/gas range

    Apr 26, 2010 · Apt 3

    Close
Show 40 more ↓
  • Plumbing

    Water-leaks

    Apr 26, 2010 · Apt 3

    Close
  • Electric

    Electric-supply

    Apr 26, 2010 · Apt 3

    Close
  • Heating

    Heat related

    Apr 26, 2010 · Apt 3

    Close
  • Heating

    Heat related

    Apr 11, 2010 · Apt 3

    Close
  • Heating

    Heat related

    Dec 8, 2008 · Apt 2A

    Close
  • Paint/plaster

    Ceiling

    Oct 16, 2008 · Apt 2A

    Close
  • Paint/plaster

    Wall

    Oct 16, 2008 · Apt 2A

    Close
  • Nonconst

    Vermin

    Oct 16, 2008 · Apt 2A

    Close
  • Nonconst

    Vermin

    Oct 16, 2008 · Apt 2A

    Close
  • Heating

    Heat related

    Oct 16, 2008 · Apt 2A

    Close
  • Heating

    Heat related

    Oct 12, 2008 · Apt 2A

    Close
  • Heating

    Heat related

    Oct 4, 2008 · Apt 2

    Close
  • Heating

    Heat related

    Aug 30, 2008 · Apt 2A

    Close
  • Heating

    Heat related

    Aug 26, 2008 · Apt 2A

    Close
  • Nonconst

    Vermin

    Aug 26, 2008 · Apt 2A

    Close
  • Electric

    Wiring

    Feb 7, 2008 · Apt 1FL

    Close
  • General

    Stairs

    Feb 7, 2008 · Apt 1FL

    Close
  • Electric

    Wiring

    Feb 7, 2008 · Apt 1FL

    Close
  • Heating

    Heat related

    Feb 6, 2008 · Apt 1FL

    Close
  • Heating

    Heat related

    Dec 27, 2007 · Apt 1FL

    Close
  • Electric

    Electric-supply

    Dec 27, 2007 · Apt 1FL

    Close
  • General

    Floor

    Dec 27, 2007 · Apt 1FL

    Close
  • Paint/plaster

    Wall

    Dec 27, 2007 · Apt 1FL

    Close
  • Electric

    Electric-supply

    Dec 27, 2007 · Apt 1FL

    Close
  • Nonconst

    Rubbish

    Dec 23, 2007 · Apt 1

    Close
  • Heating

    Heat related

    Dec 23, 2007 · Apt 1

    Close
  • Electric

    Electric-supply

    Dec 23, 2007 · Apt 1

    Close
  • General

    Floor

    Dec 23, 2007 · Apt 1

    Close
  • General

    Windows

    Dec 23, 2007 · Apt 1

    Close
  • Electric

    Electric-supply

    Dec 23, 2007 · Apt 1

    Close
  • General

    Floor

    Dec 23, 2007 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Dec 23, 2007 · Apt 1

    Close
  • Paint/plaster

    Wall

    Dec 23, 2007 · Apt 1

    Close
  • General

    Windows

    Dec 23, 2007 · Apt 1

    Close
  • Electric

    Wiring

    Dec 23, 2007 · Apt 1

    Close
  • Electric

    Wiring

    Dec 23, 2007 · Apt 1

    Close
  • Electric

    Electric-supply

    Dec 23, 2007 · Apt 1

    Close
  • Heating

    Heat related

    Dec 23, 2007 · Apt 1

    Close
  • Nonconst

    Vermin

    Dec 2, 2007 · Apt 3

    Close
  • Nonconst

    Vermin

    Dec 2, 2007 · Apt 3

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Mixed residential and retail building (S2)
Year built
1931
Floors
3
Residential units
2
Building area
3,320 ft²
Lot area
4,500 ft²
Zoning
R6B
Community board
501
Council district
49
Block / lot
527 / 61
Assessed value
$36,600
Landmark / historic district
No

Questions about 215 Canal Street

Who owns 215 Canal Street?

The owner of record in NYC Department of City Planning PLUTO data is Galarza, John.

Does 215 Canal Street have violations?

Yes. NYC HPD has recorded 37 housing violations at this property.

Is 215 Canal Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 215 Canal Street built?

City records list 1931 as the year it was built.

How many apartments are in 215 Canal Street?

It has 2 residential units and 3 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.